521- R326C B&W Tech Cross Training - Chapter 14 Oconee Tube Leak
ML11221A292
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/01/2011
From:
NRC/HR/ADHRTD/RTTB-PWR
To:
References
Download: ML11221A292 (10)


Text

Oconee Tube Leak Chapter 14.0 B&W Cross-Training Cross Training Course R-326C 1

OBJECTIVES

1. List the symptoms of a steam generator tube leak.
2. Describe the actions that should be taken if the tube leakage exceeds technical specification p limits.
3. List three actions that can be taken to minimize offsite releases during steam generator tube leakage events.

Appendix - Sequence of Events Appendix - Sequence of Events Appendix - Sequence of Events Appendix - Sequence of Events Pressure and OTSG Levels Fig. 14-1

System Temperature (Fig. 14-2)

Oconee 2 Main Steam System (Fig. 14-3)

Oconee 2 Condensate and Feed System Fig. 14-4