Independent Spent Fuel Storage Installation - Ltr. Changes to Physical Security Plan
ML11214A105
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/29/2011
From: St.Onge R
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML11214A105 (1)


Text

SOUTHERN CALIFORNIA SAFEGUARDS INFORMATION Richard .St. Onge ED Nuclear Regulatory Affairs An EDISON INTERNATIONAL& Company 10 CFR 50.54(p)

July 29, 2011 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Docket Nos. 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Southern California Edison (SCE) has made changes to the Physical Security Plan for the San Onofre Nuclear Generating Station (SONGS) that SCE has determined do not decrease the safeguards effectiveness of these plans.

In accordance with 10 CFR 50.54(p)(2), a report containing a description of these changes is enclosed for your information and a record of the changes has been made and is available for inspection at SONGS.

There are no new regulatory commitments made by this letter or its enclosures.

Note that the enclosures to this letter contain Safeguards Information. This letter may be decontrolled upon separation from. its enclosures.

If you have any questions regarding this matter, please contact Mr. S. D. Root at (949) 368-6480.

Sincerely, Enclosures (SGI) cc: E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 & 3 C. M. Staab, NRC Project Manager, San Onofre ISFSI G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 & 3 SAFEGUARDS INFORMATION Notice: Decontrolled upon separation from the enclosure.

P.O. Box 128 San Clemente, CA 92674 V.&L4AS