ML112140157

From kanterella
Jump to navigation Jump to search

Correction of Typographical Error in Cover Letter to Amendment Nos. 186, 186, and 186 Issued July 28, 2011
ML112140157
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/03/2011
From: Lauren Gibson
Plant Licensing Branch IV
To: Edington R
Arizona Public Service Co
Gibson, Lauren, NRR/DORL/LPL4, 415-1056
References
TAC ME4434, TAC ME4436, TAC ME4435
Download: ML112140157 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 August 3, 2011 Mr. Randall K. Edington Executive Vice President Nuclearl Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 CORRECTION OF TYPOGRAPHICAL ERROR IN COVER LErrER TO AMENDMENT NOS. 186, 186, AND 186 ISSUED JULY 28,2011 (TAC NOS. ME4434, ME4435, AND ME4436)

Dear Mr. Edington:

By letter dated July 28,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111810338), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 186 to Renewed Facility Operating License No. NPF-41, Amendment No. 186 to Renewed Facility Operating License No. NPF-51, and Amendment No. 186 to Renewed Facility Operating License No. NPF-74 for the Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3, respectively. The amendments consisted of changes to the Updated Final Safety Analysis Report in response to your application dated July 22, 2010, as supplemented by letter dated April 8, 2011 (ADAMS Accession Nos. ML102150352 and ML11111A063, respectively).

In the NRC staff's cover letter for the amendment, the "1" in "186" was inadvertently left off of the amendment number for the Renewed Facility Operating License No. NPF-51. Enclosed is a corrected copy of page 1 of the cover letter dated July 28, 2011.

R. Edington -2 If you have any questions, please contact me at (301) 415-1056 or via e-mail at Lauren.Gibson@nrc.gov.

Sincerely, Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530

Enclosure:

As stated cc w/encl: Distribution via Listserv

ENCLOSURE CORRECTED PAGE 1 OF THE NRC STAFF'S LETTER DATED JULY 28.2011 RELATED TO AMENDMENT NOS. 186. 186. AND 186 FOR PALO VERDE NUCLEAR GENERATING STATION. UNITS 1. 2. AND 3

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 28, 2011 Mr. Randall K. Edington Executive Vice President Nuclear!

Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 ISSUANCE OF AMENDMENTS RE: REVISE UPDATED SAFETY ANALYSIS REPORT FOR ELEMENT OF METHODOLOGY USED FOR STEAM GENERATOR TUBE RUPTURE ACCIDENTS (TAC NOS. ME4434, ME4435, AND ME4436)

Dear Mr. Edington:

The Commission has issued the enclosed Amendment No. 186 to Renewed Facility Operating License No. NPF-41, Amendment No. 186 to Renewed Facility Operating License No. NPF-51, and Amendment No. 186 to Renewed Facility Operating License No. NPF-74 for the Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3, respectively. The amendments consist of changes to the Updated Final Safety Analysis Report (UFSAR) in response to your application dated July 22, 2010, as supplemented by letter dated April 8, 2011.

The amendment revises an element of the methodology used in evaluating the radiological consequences of design basis steam generator tube rupture (SGTR) accidents. Specifically, the changes will revise the PVNGS Updated Final Safety Analysis Report (UFSAR) Section 15.6.6, "Steam Generator Tube Rupture," to reflect a lower iodine spiking factor assumed for the coincident event Generated Iodine Spike (GIS) and the resulting reduction in the radiological consequences for the Limiting SGTRLOPSF [Steam Generator Tube Rupture with Loss of Offsite Power and Single Failure] Event."

R. Edington -2 If you have any questions, please contact me at (301) 415-1056 or via e-mail at Lauren.Gibson@nrc.gov.

Sincerely, IRAI Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPLIV r/f RidsAcrsAcnw_MaiICTR Resource RidsNrrDorlLpl4 Resource RidsNrrPMPaloVerde Resource RidsNrrLAJBurkhardt Resource RidsOgcRp Resource RidsRgn4MailCenter Resource NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM ibson JBurkhardt MMarkley I LGibson 8/3i11-------*-~. 8/3/11 8/2/11 COpy