University of Florida - Regulatory Audit for Digital Instrumentation and Control License Amendment Request
ML112070146
Person / Time
Site: 05000083
Issue date: 07/27/2011
From: Duane Hardesty
Research and Test Reactors Licensing Branch
To: Hintenlang D
Univ of Florida
Hardesty, D NRC/NRR/DPR/PRLB 415-3724
References
tac me3482
Download: ML112070146 (5)


Text

July 27, 2011 David E. Hintenlang, Ph.D.

Interim Director of UFTR University of Florida Nuclear & Radiological Engineering Department 202 Nuclear Sciences Building Gainesville, FL 32611-8300

SUBJECT:

UNIVERSITY OF FLORIDA - REGULATORY AUDIT FOR DIGITAL INSTRUMENTATION AND CONTROL LICENSE AMENDMENT REQUEST (TAC NO. ME3482)

Dear Dr. Hintenlang:

By letter dated February 17, 2010, (Agencywide Document Access and Management System (ADAMS) Accession No. ML100550693) the University of Florida (UF) submitted a license amendment request (LAR) for a digital Instrumentation and Control (I&C) upgrade for the University of Florida Training Reactor (UFTR). This application was supplemented by letters dated March 11, April 12, July 8, and August 11, 2010 (ADAMS Accession Nos. ML100710785, ML101050345, ML101950364, and ML102250416, respectively).

The U.S. Nuclear Regulatory Commission (NRC) staff will conduct an onsite regulatory audit to review the UFTR digital I&C license amendment application on August 3-5, 2011. The intent of the audit is to gain understanding of your application and status of your facility. In addition, the regulatory audit will identify information that will be required to be docketed in order to support the basis of the licensing decision and will allow the NRC staff to more efficiently gain insights on the UFTRs software development programs and processes. The NRC staff has provided an audit schedule, a list of personnel and their assignments participating in the audit, and a list of information and other material necessary for the regulatory audit in the enclosure.

At the completion of the regulatory audit, a regulatory audit summary will be prepared and provided to UF. UF will have the opportunity to modify and supplement the application to provide additional information or the option to withdraw the application. We request that UF notify the NRC in writing within 30 days of the issuance of the audit summary of their intent to correct any identified deficiencies or formally withdraw the LAR as applicable. If UF does not respond within the specified time, the amendment could be denied in accordance with Title 10 of the Code of Federal Regulations Section 2.108, Denial of application for failure to supply information. If UF chooses to withdraw the application or the application is denied due to an identified deficiency in the submittal (as opposed to a definitive negative finding by the NRC staff based on the technical merits of the proposed changes), UF may submit a new application (with the identified discrepancies corrected) in the future.

D. Hintenlang We appreciate your support in providing space, the requested documentation and access to the necessary personnel and other materials that will assist in an efficiently conducted audit. Should you have any questions on this matter, please contact me at 301-415-3724 or by e-mail at duane.hardesty@nrc.gov.

Sincerely,

/RA/

Duane Hardesty, Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-83

Enclosure:

As stated cc w/encl: See next page

University of Florida Docket No. 50-83 cc:

Cammy Abernathy Dean, College of Engineering University of Florida PO Box 117168 Gainesville, FL 32611 Administrator Department of Environmental Regulation Power Plant of Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, FL 32301 William Passetti, Chief Bureau of Radiation Control Department of Health 4052 Bald Cypress Way Tallahassee, FL 32399-1741 Brian Shea Reactor Manager University of Florida Nuclear & Radiological Engineering Department 202 Nuclear Sciences Building Gainesville, FL 32611-8300 Test, Research and Training Reactor Newsletter Nuclear & Radiological Engineering Department University of Florida 202 Nuclear Science Building Gainesville, FL 32611-8300

D. Hintenlang We appreciate your support in providing space, the requested documentation and access to the necessary personnel and other materials that will assist in an efficiently conducted audit. Should you have any questions on this matter, please contact me at 301-415-3724 or by e-mail at duane.hardesty@nrc.gov.

Sincerely,

/RA/

Duane Hardesty, Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-83

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC DPR/PRT r/f RidsNrrDpr RidsNrrDprPrta RidsNrrDprPrtb DHardesty, NRR GLappert, NRR NCarte, NRR JDonohue, NRR JQuichocho, NRR SWyman, NRR LHardin, RES AAdams, NRR ACCESSION NO.: ML112070146 NRR-106 OFFICE PRLB:PM PRLB:LA PRLB:BC PRLB:PM NAME DHardesty GLappert JQuichocho DHardesty DATE 7/27/11 7/27/2011 7/27/11 7/27/11 OFFICIAL RECORD COPY

AUDIT SCHEDULE Wednesday August 3, 2011 8:00 a.m. Arrive and prepare for entrance Meeting 9:00 a.m. Entrance Meeting and Introductions Current project status Schedule for project completion 12:00 noon Break for lunch 1:00 p.m. Resume Audit 5:00 p.m. End for the day Thursday August 4, 2011 8:00 a.m. Resume Audit 12:00 noon Break for lunch 1:00 p.m. Resume Audit 5:00 p.m. End for the day Friday August 5, 2011 8:00 a.m. Resume Audit 12:00 noon Break for lunch 1:00 p.m. Resume Audit 4:00 p.m. Exit Meeting 5:00p.m. End for the day INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT:

(1) A current schedule, showing what has been completed, and what remains to be done.

(2) A list of all digital I&C documents that will be prepared.

(a) Identification of those documents that have been docketed.

(b) Identification of any docketed documents that have been or will be superseded.

(3) List & short description of digital I&C project participants (name and position).

(4) A printout of the latest revision of each digital I&C document. (One copy per team member)

STAFF AND TEAM ASSIGNMENTS:

Duane Hardesty, NRR RTR Project Manager, UF Project and Licensing Lead Norbert Carte, NRR DE Sr. Electrical Engineer, I&C Team Lead & Peer Reviewer Stephen Wyman, NRR DE Project Engineer, Lead I&C Reviewer.

Leroy Hardin, RES DE Project Engineer, Guidance Consultant.

Michael Muhlheim, Oakridge National Laboratory, DOE Contractor, Guidance Consultant.

Alexander Adams, NRR RTR Sr. Project Manager, Expert Advisor.

Enclosure