July 14, 2011

Michael Perito

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - INITIAL INFORMATION REQUEST FOR NRC

TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC

INSPECTION REPORT 05000458/2011008

Dear Mr. Perito:

On September 26, 2011, reactor inspectors from the U.S. Nuclear Regulatory Commissions

(NRC) Region IV office will begin a triennial baseline Component Design Bases Inspection at

the River Bend Station. A six-person team will perform this inspection using NRC Inspection

Procedure 71111.21, "Component Design Bases Inspection."

The inspection focuses on components and operator actions issues that have high risk and low

design margins. The samples reviewed during this inspection will be identified during an

information gathering visit and during the subsequent in-office preparation week. In addition, a

number of operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of

four NRC inspectors and two contractors, of which three will focus on engineering and one on

operations. The current inspection schedule is as follows:

Onsite information gathering visit: September 6-9, 2011

Preparation Week: September 19-23, 2011

Onsite weeks: September 26-30 and October 17-28, 2011

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. During the onsite weeks, several days of time will be needed on the plant-referenced

simulator in order to facilitate the development of operator action-based scenarios. Additional

information and documentation needed to support the inspection will be identified during the

inspection, including interviews with engineering managers, engineers, and probabilistic safety

assessment staff.

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

612 E. LAMAR BLVD., SUITE 400

ARLINGTON, TEXAS 76011-4005

Entergy Operations, Inc.

- 2 -

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than August 29, 2011. Insofar as

possible, this information should be provided electronically to the lead inspector. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested is those items that the team will need access to

during the preparation week in order to finalize the samples to be inspected. The third group

lists information necessary to aid the inspection team in tracking issues identified as a result of

the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. Additional requests by inspectors will be made

throughout all three onsite weeks for specific documents needed to complete the review of that

component/selection. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the onsite portions of the inspection. In order to facilitate the inspection, we request that a

contact individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Gerond A. George. We understand that our licensing

engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the

inspection or the requested materials, please contact the lead inspector at (817) 276-6562 or via

e-mail at Gerond.George@nrc.gov

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas A. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-458

Entergy Operations, Inc.

- 3 -

License: NPF-47

Enclosure:

Information Request for River Bend Station Component Design Basis Inspection

cc w/enclosure:

Distribution via listserv for River Bend Station

Entergy Operations, Inc.

- 4 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Art.Howell@nrc.gov )

DRP Director (Kriss.Kennedy@nrc.gov )

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov )

DRS Deputy Director (Robert.Caldwell@nrc.gov )

Senior Resident Inspector (Grant.Larkin@nrc.gov )

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov )

Resident Inspector (Andy.Barrett@nrc.gov )

RBS Administrative Assistant (Lisa.Day@nrc.gov )

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov )

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Public Affairs Officer (Lara.Uselding@nrc.gov )

Project Manager (Alan.Wang@nrc.gov )

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource

NRR CDBI Coordinator (Donald.Norkin@nrc.gov )

R:\\

ADAMS ML

ADAMS: No Yes

SUNSI Review Complete

Reviewer Initials: GAG

Publicly Available

Non-Sensitive

Category A.

Non-publicly Available

Sensitive

KEYWORD:

DRS/EB1/SRI

DRS/EB1/BC

GGeorge

TFarnholtz

/RA/

/RA/

7/12/11

7/13/11

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

INFORMATION REQUEST FOR RIVER BEND STATION COMPONENT DESIGN BASES

INSPECTION (CDBI)

Inspection Report: 05000298/2011008

Information Gathering Dates:

September 6-9, 2011

On-site Inspection Dates:

September 26-30 and October 18-28, 2011

Inspection Procedure:

IP 71111.21, "Component Design Bases

Inspection"

Lead Inspector/Team Leader:

Gerond George

817-276-6562

Gerond.George@nrc.gov

I.

Information Requested Prior to the information Gathering Visit (August 29, 2011):

The following information (Section I of this enclosure) should be sent to the Region IV

office in hard copy or electronic format (compact disc, preferred), in care of Gerond A.

George, by August 29, 2011, to facilitate the reduction in the items to be selected for a

final list during the preparation week of September 19, 2011. The inspection team will

finalize the selected list during the prep week using the additional documents requested

in Section II of this enclosure. The specific items selected from the lists shall be available

and ready for review on the day indicated in this request. *Please provide requested

documentation electronically in "pdf" files, Excel, or other searchable formats, if possible.

The information should contain descriptive names, and be indexed and hyperlinked to

facilitate ease of use. Information in "lists" should contain enough information to be

easily understood by someone who has knowledge of boiling water reactor technology.

If requested documents are large and only hard copy formats are available, please

inform the inspector(s), and provide subject documentation during the first day of the

onsite inspection.

1.

An excel spreadsheet of equipment basic events (with definitions) including

importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely

(FV) from your internal events probabilistic risk assessment (PRA). Include basic

events with RAW value of 1.3 or greater.

2.

Provide a list of the top 500 cut-sets from your PRA.

3.

Copies of PRA "system notebooks," and the latest PRA summary document.

4.

An excel spreadsheet of PRA human action basic events or risk ranking of

operator actions from your site specific PSA sorted by RAW and FV. Provide

copies of your human reliability worksheets for these items.

5.

If you have an external events or fire PSA model, provide the information

requested in items 1-4 for external events and fire.

- 2 -

Enclosure

6.

Any pre-existing evaluation or list of components and associated calculations with

low design margins, (i.e., pumps closest to the design limit for flow or pressure,

diesel generator close to design required output, heat exchangers close to rated

design heat removal, etc.).

7.

List of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment.

8.

A list of operating experience evaluations for the last 2 years.

9.

A list of all time-critical operator actions in procedures.

10. A list of permanent and temporary modifications sorted by component identified in

Item 1.

11. List of current "operator work arounds/burdens."

12. A list of the design calculations, which provide the design margin information for

components included in Item 1. (Calculations should be available during the

information gathering visit).

13. List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 5 years.

14. Current management and engineering organizational charts.

15. River Bend Station IPEEE, if available electronically.

16. Mechanical piping drawings for:

Engineered safety features

Emergency core cooling systems

Emergency diesel generators

17. Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal AC power systems

Emergency AC/DC power systems including

120VAC power, and

125VDC/24VDC safety class systems

18. List of any common-cause failures of components in the last 3 years.

19. An electronic copy of the Design Bases Documents.

20. An electronic copy of the System Health notebooks.

21. System Description Manuals with simplified drawings of plant systems.

- 3 -

Enclosure

II.

Information Requested to be Available on First Day of Preparation Week

(September 19, 2011)

1.

List of condition reports (corrective action documents) associated with each of

the selected components for the last 5 years.

2.

The corrective maintenance history associated with each of the selected

components for the last 2 years.

3.

Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of reference material (such as drawings, engineering

requests, and vendor letters).

4.

Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

5.

Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

6.

Copies of any open temporary modifications associated with each of the selected

components, if applicable.

7.

Trend data on the selected electrical/mechanical components performance for

last 3 years (for example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., as applicable).

8.

A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

9.

A copy of engineering/operations related audits completed in the last 2 years.

10.

List of motor operated valves (MOVs) in the program, design margin and risk

ranking.

11.

List of air operated valves (AOVs) in the valve program, design and risk ranking.

12.

Structure, system and components in the Maintenance Rule (a)(1) category.

13.

Site top 10 issues list.

14.

Procedures used to accomplish operator actions associated with the basic

events in your PRA.

15.

List of licensee contacts for the inspection team with pager or phone numbers.

- 4 -

Enclosure

III.

Information Requested to be provided throughout the inspection.

1.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3.

Reference materials (available electronically and as needed during all onsite

weeks):

General set of plant drawings

IPE/PRA report

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surveillance, etc.)

Technical Specifications

Updated Final Safety Analysis Report

Vendor manuals

Inspector Contact Information:

Gerond A. George

Senior Reactor Inspector

(817) 276-6562

Gerond.George@nrc.gov

Mailing Address:

US NRC, Region IV

Attn: Gerond A. George

612 East Lamar Blvd, Ste 400