July 13, 2011 Mr. Scott Murray, Manager GE-Hitachi Nuclear Energy Mail Code #84 3901 Castle Hayne Road Wilmington, NC 28401
SUBJECT:
ADDITIONAL TIME TO RESPOND TO A REQUEST FOR ADDITIONAL INFORMATION REGARDING THE PARENT COMPANY GUARANTEE AND ANNUAL FINANCIAL TEST
Dear Mr. Murray:
In your letter (Ref. 1) dated June 20, 2011, General Electric-Hitachi (GEH) requested an extension of the 30-day period to respond to a request for additional information (RAI) (Ref. 2) dated June 2, 2011. On June 17, 2011, the U.S. Nuclear Regulatory Commissions (NRCs) staff and GEHs staff had a conference call to clarify the RAIs and request the extension. A summary of the conference call is being prepared as of the date of this letter. The RAIs had been sent to Keith Sherin at General Electric in Fairfield, Connecticut, where it was forwarded to the GEH office in Wilmington, North Carolina; you received the letter on June 16, 2011. You also stated that some of the requested information is not readily available, thus, necessitating additional time to prepare.
GEH requested an extension to August 15, 2011. This letter grants the extension. A response to Ref. 2 is due by no later than Monday, August 15, 2011.
In accordance with Title 10 of the Code of Federal Regulations 2.390(d) of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Public Available Records System component of NRCs document system, Agencywide Documents Access and Management System [ADAMS]).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have questions, please contact me at 301-492-3189, or via e-mail to Christopher.Ryder@nrc.gov.
Sincerely,
/RA/
Christopher Ryder, Licensing Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Docket Nos. 50-18, 50-70, 50-183,70-754, 70-1113, 70-2872, 72-01 License Nos. DPR-1, DR-10, R-33, SNM-960, SNM-1097, SNM-1826, SNM-2500, TR-1 References
- 1. Letter from S. Murray, General Electric Hitachi, Response to NRC Request for Additional Information dated June 20, 2011. ADAMS Accession Number ML111720017.
- 2. Letter to K. Sherin, GE, from C. Ryder, NRC, Request For Additional Information Regarding Parent Company Guarantee And Annual Financial Test For General Electric Hitachi (TAC No. L33125), June 2, 2011. ADAMS Accession Number ML111300315.
cc: Ms. Patricia Campbell, GEH Mr. James Ross, GEH
If you have questions, please contact me at 301-492-3189, or via e-mail to Christopher.Ryder@nrc.gov.
Sincerely,
/RA/
Christopher Ryder, Licensing Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Docket Nos. 50-18, 50-70, 50-183,70-754, 70-1113, 70-2872, 72-01 License Nos. DPR-1, DR-10, R-33, SNM-960, SNM-1097, SNM-1826, SNM-2500, TR-1 References
- 1. Letter from S. Murray, General Electric Hitachi, Response to NRC Request for Additional Information dated June 20, 2011. ADAMS Accession Number ML111720017.
- 2. Letter to K. Sherin, GE, from C. Ryder, NRC, Request For Additional Information Regarding Parent Company Guarantee And Annual Financial Test For General Electric Hitachi (TAC No. L33125), June 2, 2011. ADAMS Accession Number ML111300315.