Request for Additional Information Regarding License Amendment Request for Safety Limit Minimum Critical Power Ratio Change
ML111860025
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/11/2011
From: John Hughey
Plant Licensing Branch 1
To: Pacilio M
Exelon Generation Co
Hughey J, NRR/DORL, 301-415-3204
References
TAC ME6931
Download: ML111860025 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 11, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR SAFETY LIMIT MINIMUM CRITICAL POWER RATIO CHANGE (TAC NO. ME6931)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission (NRC) dated June 8. 2011,1 Exelon Generation Company, LLC, (Exelon) submitted a license Amendment Request for Peach Bottom Atomic Power Station (PBAPS), Unit 3. The submittal seeks to revise Technical Specification 2.1.1, "Reactor Core SLs [safety limits]" to reflect revised Safety limit Minimum Critical Power Ratio (SLMCPR) values for Operating Cycle 19. The NRC staff has reviewed the request submitted by the licensee and determined that additional information is needed as set forth in the Enclosure.

The draft questions were sent to Mr. Thomas Loomis, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On August 3, 2011, Mr. Loomis indicated that the licensee will submit a response by August 26, 2011. Please note that if you do not respond to this letter by the agreed-upon date or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations. Section 2.108.

If you have any questions, please contact John Hughey at (301) 415-3204.

SinCerelY J /;)

o.~

hn D. Hughey, Project Manager Plant licensing Branch 1-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation

~

Docket No. 50-278

Enclosure:

Request for Additional Information cc: Distribution via listServ 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML111600180

REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST FOR TECHNICAL SPECIFICATION CHANGES TO SAFETY LIMIT MINIMUM CRITICAL POWER RATIO VALUES PEACH BOTTOM ATOMIC POWER STATION - UNIT 3 DOCKET NO. 50-278 By letter to the Nuclear Regulatory Commission (NRC) dated June 8, 2011 1, Exelon Generation Company, LLC, (Exelon) submitted a License Amendment Request for Peach Bottom Atomic Power Station (PBAPS), Unit 3. The submittal seeks to revise Technical Specification 2.1.1, "Reactor Core SLs [safety limits]" to reflect revised Safety Limit Minimum Critical Power Ratio values for Operating Cycle 19. The NRC staff has reviewed Exelon's submittal and determined that additional information, as described below, is needed to complete the review. (Note that the "Attachment 4" referenced below is the non-publicly available, proprietary version of associated with the submittal dated June 8, 2011.)

RAI-01

Provide the PBAPS Unit 3 cycle-specific fuel quantity for each fuel type and state when the specific fuel types are loaded in the core (Le., fresh, once, or twice burn) as depicted in Figure 1 of Attachment 4 for the Cycle 19 core loading diagram.

RAI-02

Provide the information to obtain a final core loading pattern as shown in Figure 1 of including procedures, guidelines, criteria, and approved methodologies used for this analysis.

RAI-03

Provide the rationale for why a 35.1 % reload batch fraction for GNF2 fuel caused the proposed SLMCPR to change by 0.02 for two recirculation loop operation and 0.03 for single recirculation loop operation for the proposed loading pattern in Figure 1 of.

RAI-04

Confirm that the fuel-related coefficients and constants are the same in the approximation of the correlation for the MCPR Importance Parameter (MIP) and the R-factor Importance Parameter (RIP) for all of the fuels shown in Figure 5 of.

Agencywide Documents Access and Management System (ADAMS) Accession No. ML111600180 Enclosure i

- 2 Background for RAI-05.1 - RAI-05.3:

Section 2.1, "Major Contributors to SLMCPR Change," states that Table 3 presents estimated impacts on the TLO SLMCPR due to methodology deviations, penalties, uncertainties and/or deviations from approved values.

RAI-05.1: Provide calculation details and justify that the results listed in Table 3 are conservative related to methodology deviations, penalties. uncertainties and/or deviations from approved values.

RAI-05.2: Provide a qualitative explanation of the impact on the SLMCPR estimate at rated power and rated flow versus minimum core using MIPRIP correlation as described in Section 2.1 of Attachment 4.

RAI-05.3: Provide a justification that all affected factors including any fuel-related Part 21 issues are reflected in Table 3.

RAI-06

Provide a reactor core map that depicts the 0.1 percent of fuel bundles that may experience boiling transition for the limiting SLMCPR case. Include information regarding the fuel bundle group, group exposure. the number of bundles, fuel type and the percent contribution to the number of fuel rods that are subjected to boiling transition.

RAI-07

Provide an updated version of the power/flow map for PBAPS Unit 3, Cycle 19.

operation including stability Option III features of scram region and controlled entry region for back-up stability protection.

August 11, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 SUB~IECT:

PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR SAFETY LIMIT MINIMUM CRITICAL POWER RATIO CHANGE (TAC NO. ME6931)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission (NRC) dated June 8, 2011.1 Exelon Generation Company. LLC. (Exelon) submitted a License Amendment Request for Peach Bottom Atomic Power Station (PBAPS). Unit 3. The submittal seeks to revise Technical Specification 2.1.1, "Reactor Core SLs [safety limits]" to reflect revised Safety Limit Minimum Critical Power Ratio (SLMCPR) values for Operating Cycle 19. The NRC staff has reviewed the request submitted by the licensee and determined that additional information is needed as set forth in the Enclosure.

The draft questions were sent to Mr. Thomas Loomis, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On August 3, 2011, Mr. Loomis indicated that the licensee will submit a response by August 26, 2011. Please note that if you do not respond to this letter by the agreed-upon date or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108.

If you have any questions. please contact John Hughey at (301) 415-3204.

Sincerely, lraJ John D. Hughey, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-278

Enclosure:

Request for Additional Information cc: Distribution via ListServ DISTRIBUTION: