UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA. PA 19406-1415 June 30, 20LL Mr. PaulA. Harden Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077 -0Q04
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - BEAVER VALLEY POWER STATION UNIT 2
Dear Mr. Harden:
ln a telephone conversation on June 22, 2011, Mr. K. Martin, Supervisor Licensed Operator Continuing Training, and Mr. D. Silk, Senior Operations Engineer, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Beaver Valley Unit 2 facility. The inspection is planned for the week of bctoUer 17,2011, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NilC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in ihe'past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator ferformance problems; 3) an index or summary of simulator performance test results in the past two years; 4) procedures governing the licensed operator requalification program; and 5) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by September 19,2011. Mr' K. Martin has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of l gg; (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U' S.
Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail
P. Harden 2
to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readino-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact Mr. D. Silk at (610) 337-5372.
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-334, 5Q-412 License Nos.: DPR-66, NPF-73 cc: Distribution via ListServ
P. Harden 2
to TNFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.oov/readinq-rm/adams.html(The Public Electronic Reading Room).
Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact Mr. D. Silk at (610) 337-5372.
Sincerely,
/RN Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73 cc: Distribution via ListServ Distribution: See Next Page SUNSI Review Complete: DMS (Reviewer's Initials)
Non-Public Designation Category: MD 3.4 Non'Public B.1 ADAMS PKG: ML1OO3O654 ADAMS ACC #ML111810078 DOCU M ENT NAME : G :\\DRS\\Operations Branch\\PRESB\\AReq ual FY1 1 -BV 1 &2 Mayl 1\\60dayrpi.doc will be released to the Public After declarino this document "An Official Agency Record" it wlll De OFFICE RI/DRS/OB RI/DRS/OB NAME PPresbv/DMS for SHansell/SLH DATE Q6129111 06/30/11 OFFICIAL RECORD COPY
P. Harden 3
Distribution w/encl:
W. Dean, RA (RIORAMAIL Resource)
D. Lew, DRA (RIORAMAIL Resource)
D. Roberts, DRP (RIDRPMAIL Resource)
J. Clifford, DRP (RlDRPMail Resource)
C. Miller, DRS (RlDRSMail Resource)
P. Wilson, DRS (RlDRSMail Resource)
R. Bellamy, DRP S. Barber, DRP C. Newport, DRP N. Lafferty, DRP D. Werkheiser, DRP, SRI E. Bonney, DRP, Rl P. Garrett, DRP, Resident OA J. McHale, Rl, OEDO D. Bearde, DRS RidsN nPMBeaverValley Resource RidsNrrDorlLpll -1 Resource D. Silk, DRS Examiner, DRS L. Vick, N RR/ADRO/DIRS/IOLB S. Hansell, DRS C. Bixler, DRS (OL Facility File)