ML11168A063

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report, Cycle 20, Revision 0
ML11168A063
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/19/2011
From: Morris J
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11168A063 (2)


Text

JAMES R. MORRIS Energy Vice President Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road York, SC 29745 803-701-4251 803-701-3221 fax May 19, 2011 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

Catawba Nuclear Station Unit 1 CNS Docket Nos. 50-413 Core Operating Limits Report (COLR)

Catawba Nuclear Station (CNS) Unit 1 Cycle 20, Revision 0 Attached, pursuant to Catawba Technical Specification 5.6.5, is an information copy and electronic copy of the Core Operating Limits Report for Catawba Unit 1 Cycle 20. This COLR is being submitted to update the limits of the Cycle 20 reload core.

The electronic copy of this COLR is included with the letter. The electronic copy includes the power distribution monitoring factors.

This letter, attached COLR, and computer disk do not contain any new commitments.

Please direct any questions or concerns to Adrienne F. Driver at (803) 701-3445.

Sincerely, James R. Morris Attachments KU__

www. duke-energy, com

U.S. Nuclear Regulatory Commission May 19, 2011 Page 2 xc w/Attachment only:

U.S. Nuclear Regulatory Commission V.M. McCree, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. Jon H. Thompson, NRC Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 0-8 G9A Washington, D.C. 20555 Mr. G.A. Hutto, NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station