1 WBN2Public Resource From:
Hamill, Carol L [clhamill@tva.gov]
Sent:
Thursday, June 02, 2011 11:37 AM To:
Epperson, Dan; Poole, Justin; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc:
Crouch, William D
Subject:
Presentation package_Part 1 of 2 Attachments:
image001.jpg; Presentation package_Part 1 of 2.pdf - Adobe Acrobat Professional.pdf Gentlemen, Bill Crouch asked me to divide the presentation package into 2 smaller documents and send them to you separately, so you will have the complete presentation.
Attached is Part 1 of 2, pages 1-14.
Carol L. Hamill
Licensing/QualityAssurance WBNUnit2Project,EQB1BWBN
4233653177
4233653833 ccllhhaam miillll@
@ttvvaa..ggoovv
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
409 Mail Envelope Properties (25547F570B005144A141ECCA95DA1AB212053950)
Subject:
Presentation package_Part 1 of 2 Sent Date:
6/2/2011 11:36:31 AM Received Date:
6/2/2011 11:37:53 AM From:
Hamill, Carol L Created By:
clhamill@tva.gov Recipients:
"Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None Post Office:
TVACOCXVS2.main.tva.gov Files Size Date & Time MESSAGE 384 6/2/2011 11:37:53 AM image001.jpg 1023 Presentation package_Part 1 of 2.pdf - Adobe Acrobat Professional.pdf 4138337 Options Priority:
Standard Return Notification:
No Reply Requested:
Yes Sensitivity:
Normal Expiration Date:
Recipients Received:
Page 1 of 1 6/16/2011 file://c:\\EMailCapture\\Watts_Bar_2_Operating_LA_Public\\409\\attch1.jpg
ENCLOSURE 1 PRESENTATION PACKAGE TEMPORARY DAMS MODIFICATION PROJECT PART 1 OF 2
Temporary Dams Modification Project P
t d t Presented to The Nuclear Regulatory Commission Tennessee Valley Authority Ri er Operations River Operations Knoxville, TN May 11, 2011
Temporary Dams Modification Project Affected Dams
Cherokee
Tellico Affected Dams
Fort Loudoun
Modifications of the Dams consisted of:
Watts Bar
Modifications of the Dams consisted of:
Raising the Embankment Dams by Using HESCO Sand Baskets Husein Hasan/TVA 2
Temporary Dams Modifications (R1)
Temporary Dams Modification Project Geotextile A heavy-duty, non-woven, permeable, polypropylene fabric Welded Wire Mesh, coil, and pins p
Alu-Zinc coated Steel, wire diameter of 0.16 inch. With spacing of 3" x 3" spacing of 3 x 3 Size: 3X3X3 or 3X3X4 Capacity : 1 6 - 2 2 tons Capacity : 1.6 2.2 tons Husein Hasan/TVA 3
Temporary Dams Modifications (R1)
Temporary Dams Modification Project Husein Hasan/TVA 4
Temporary Dams Modifications (R0)
Temporary Dams Modification Project Cherokee Dam 6783 feet Husein Hasan/TVA 5
Temporary Dams Modifications (R0) 6783 feet
Temporary Dams Modification Project Cherokee Dam Embankment Husein Hasan/TVA 6
Temporary Dams Modifications (R0)
Temporary Dams Modification Project Cherokee Dam
Dam's length raised by 3' = 6783 feet
Dam s length raised by 3 6783 feet
HESCO baskets used = 2261; Size (3X3X3)
Sand used = 8.2 million pounds p
Husein Hasan/TVA 7
Temporary Dams Modifications (R0)
Temporary Dams Modification Project Tellico Dam Saddle Dam #2 6011 feet Saddle Dam #3 Husein Hasan/TVA 8
Temporary Dams Modifications (R1)
Tellico Dam
Temporary Dams Modification Project Tellico Dam Embankment Husein Hasan/TVA 9
Temporary Dams Modifications (R0)
Tellico Pedestrian Walkway
Temporary Dams Modification Project Tellico Dam - Saddle Dams Saddle Dam #2 (525 feet)
Saddle Dam #3 (291 feet)
Husein Hasan/TVA 10 Temporary Dams Modifications (R0)
Temporary Dams Modification Project Affected Dams
Cherokee
Tellico Affected Dams
Fort Loudoun
Modifications of the Dams consisted of:
Watts Bar
Modifications of the Dams consisted of:
Raising the Embankment Dams by Using HESCO Sand Baskets Husein Hasan/TVA 2
Temporary Dams Modifications (R1)
Temporary Dams Modification Project Geotextile A heavy-duty, non-woven, permeable, polypropylene fabric Welded Wire Mesh, coil, and pins p
Alu-Zinc coated Steel, wire diameter of 0.16 inch. With spacing of 3" x 3" spacing of 3 x 3 Size: 3X3X3 or 3X3X4 Capacity : 1 6 - 2 2 tons Capacity : 1.6 2.2 tons Husein Hasan/TVA 3
Temporary Dams Modifications (R1)
Temporary Dams Modification Project Husein Hasan/TVA 4
Temporary Dams Modifications (R0)
Temporary Dams Modification Project Cherokee Dam 6783 feet Husein Hasan/TVA 5
Temporary Dams Modifications (R0) 6783 feet
Temporary Dams Modification Project Cherokee Dam Embankment Husein Hasan/TVA 6
Temporary Dams Modifications (R0)
Temporary Dams Modification Project Cherokee Dam
Dam's length raised by 3' = 6783 feet
Dam s length raised by 3 6783 feet
HESCO baskets used = 2261; Size (3X3X3)
Sand used = 8.2 million pounds p
Husein Hasan/TVA 7
Temporary Dams Modifications (R0)
Temporary Dams Modification Project Tellico Dam Saddle Dam #2 6011 feet Saddle Dam #3 Husein Hasan/TVA 8
Temporary Dams Modifications (R1)
Tellico Dam
Temporary Dams Modification Project Tellico Dam Embankment Husein Hasan/TVA 9
Temporary Dams Modifications (R0)
Tellico Pedestrian Walkway
Temporary Dams Modification Project Tellico Dam - Saddle Dams Saddle Dam #2 (525 feet)
Saddle Dam #3 (291 feet)
Husein Hasan/TVA 10 Temporary Dams Modifications (R0)
Temporary Dams Modification Project Tellico Dam Tellico Dam
Dam's length raised by 4' = 6011 feet
HESCO baskets used = 1993; Size (3X3X4)
(
)
Sand used = 10.8 million pounds Husein Hasan/TVA 11 Temporary Dams Modifications (R0)
Temporary Dams Modification Project Tellico Dam Tellico Dam
Dam's length raised by 4' = 6011 feet
HESCO baskets used = 1993; Size (3X3X4)
(
)
Sand used = 10.8 million pounds Husein Hasan/TVA 11 Temporary Dams Modifications (R0)
Temporary Dams Modification Project Fort Loudoun Dam Embankment Husein Hasan/TVA 12 Temporary Dams Modifications (R0) 3785 feet
Temporary Dams Modification Project Fort Loudoun Dam Embankment Husein Hasan/TVA 13 Temporary Dams Modifications (R0)
Temporary Dams Modification Project Fort Loudoun Dam Embankment Husein Hasan/TVA 14 Temporary Dams Modifications (R0)