ML111671228
| ML111671228 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 11/07/1983 |
| From: | Giesler C Wisconsin Public Service Corp |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML111671227 | List: |
| References | |
| CON-NRC-83-196 NUDOCS 8401030315 | |
| Download: ML111671228 (3) | |
Text
PA 01 T-:JTUN SAEM (PID5)
ACCESSION NR:
0G.DAT: 83/11/07 NOTARIZED: NC FACIL:50-305 Kewaunee iNuclear Power Plant, Wisconsin Public Seroi~c AUTH.NAME AUTHOR AFFILIATION GIESLERCW, Wisconsin Public Service Corp.
RECIP.NAME' RECIPIENT AFFILIATION DENTONH,R, Office of Nuclear Reactor Regulation, Director 0OCKET #
05000305
SUBJECT:
Forwards Central Files version of revised emergency olan implementing proceduresincluoing Procedures EP-AD-3 re unusual event,EP-AD-4 re alert & EP-AD-S re site emergency.
DISTRIBUTION CODE: X005S COPIES RECEIVED:LTR -.
ENCL.L SIZE:.2..I (
TITLE: Emerg Plan (CF Avail)
INOTES:
RECIPIENT 10 CODE/NAME NRR UR81 BC INTERNAL:(ADM/TRR ir hy FE/ E P F3 NRR/DSI/AEbi REG FILES C;OPIES LTTR ENCL 1
0 02 03 1
2 1
1 2
1 01 1
1 RECIPIENT 10 CODE/NAME GROTENHUISM 01 FEMA TECH HAZO9 IE/0EPER/IRB NRR/DSI/RAB CCPIES LTTR ENCL 1
I 1
1 1
U 1
0 TOTAL NUMBER OF COPIES rE4UiRED: LTTR 10 ENCL '
8
0 WISCONSIN PUBLIC 0
SERVICE CORPORATION P0. Box 1200, Green Bay, Wisconsin 54305 November 7, 1983 Dr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Dr. Denton:
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures Pursuant to 10 CFR 50 Appendix E, Wisconsin Public Service Corporation hereby submits two copies of the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan implementing procedures listed below. By copy of this letter, one copy of these procedures is hereby submitted to Mr. James G. Keppler, Regional Administrator, U. S. Nuclear Regulatory Commission, Region III, Glen Ellyn, Illinois.
EP-AD-3 EP-AD-4 EP-AD-5 EP-AD-6 EP-AD-7 EP-AD-8 EP-AD-9 EP-AD-10 EP-AD-12 EP-AD-17 EP-ENV-3A (Rev.
(Rev.
(Rev.
(Rev.
(Rev.
(Rev.
(Rev.
(Rev.
(Rev.
(Rev.
(Rev.
- 0)
- 0)
D)
D)
H)
H)
H)
H)
- 0)
F)
I)
EP-ENV-3C (Rev. A) 8401030315 831227 PDR ADOCK 05000305 PDR Unusual Event Alert Site Emergency General Emergency Notification of Unusual Event Notification of Alert Notification of Site Emergency Notification of General Emergency Personnel Assembly and Accountability Communications Environmental Protection Director Actions and Directives Primary Dose Projection Calculation - IBM Personal Computer 74 I
.e 0
Dr. Harold R. Denton November 7, 1983 Page 2 EP-EOF-1 (Rev. I)
Corporate Staff Emergency Response Organization EP-EOF-2 (Rev. F)
Emergency Operations Facility (EOF)
Activation EP-EOF-3 (Rev. G)
Corporate Response to an Unusual Event EP-EOF-4 (Rev. I)
Corporate Response to an Alert EP-EOF-5 (Rev. I)
Corporate Response to a Site Emergency EP-EOF-6 (Rev. 1)
Corporate Response to a General Emergency EP-EOF-9 (Rev. G)
Interface-with Support Organizations EP-RET-5 (Rev. C)
Plume Projection EP-RET-5A (Rev. C)
Plume Projection (Backup Method)
EP-RET-7 (Rev. B)
Radiological Analysis Facility/Radiation Protection Office Communications EP-SEC-2 (Rev. D)
Security Force Response to Emergencies EP-SEC-3 (Rev. E)
Personnel Accountability (Initial and Maintaining)
EP-SEC-5 Original Security Force Response to the EOF Very truly Fcly(O C. W. Giesler Vice President -
Nuclear Power jks Attachment cc -
Mr.
C.
G. Keppler, US NRC GRegion III Mr. William Snell, US NRC, w/o attach.
Mr. Robert Nelson, US NRC, Mr. C. F. Riederer, PPeW Mr. S. A Varga, US NRC