ML111660551

From kanterella
Jump to navigation Jump to search
Forwards Radiological Emergency Response Plan Implementing Procedures
ML111660551
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/01/1984
From: Giesler C
Wisconsin Public Service Corp
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML111660552 List:
References
CON-NRC-84-19 NUDOCS 8402070329
Download: ML111660551 (2)


Text

REGULATURY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSIO. NBR:8402070329W DCDATE:.84/02/01 NOT ED: NO DOCKET #

FACIL:50305 Kewaunee Nuclear Power Plant, Wisconsin Public Servic 05000305 AUTH.NAME' AUTHOR AFFILIATION GIESLERC.W, Wisconsin Public Service Corp.

HECIP.NAME RECIPIENT AFFILIATION DENTONH,R, Office of Nuclear Reactor Regulation, Director

SUBJECT:

Forwards radiological emergency response plan implementing procedures, DISTRIBUTION CODE: A0458 COPIES RECEIVED:LTR 1ENCL SIZE TITLE: OR Submitt I Emergency Prep Correspondence NOTES: evi)eo 3/6' RECIPIENT ID CODE/NAME:

NRR OR1 BC:

GROTENHUISM 01 INTERNAL: IE/DEPER/EPB 06 EFILES 04 EXTERNAL: FEMA ITECH HAZ, NRC OPDR NTIS 05 COPIES LTTR ENCL, 1

)

I 2

1 2

RECIPIENT:

ID CODE/NAME, NRR ORBI LA IE/DEPER/1RB NRR/DSI/RAB RGN3 LPDR NSIC 12:

COPIES LTTR ENCL 1

1 1

1 03 1

1 I TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL

N WAIS(CONS IlN PLJBELIC SERIf(E CORPORA)FUTION?

RC-84-19 PO0 Box 1200, Green Bay, Wisconsin 54305 February 1, 1984 Dr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Dr. Denton:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementinq Procedures Pursuant to 10 CFR 50 Appendix E, Wisconsin Public Service Corporation hereby submits two copies of the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan implementing procedures listed below.

By copy of this letter, one copy of these procedures is hereby submitted to Mr. James G. Keppler, Regional Administrator, U. S. Nuclear Regulatory Commission, Region III, Glen Ellyn, Illinois.

EP-RET-3C (Rev. B)

Post Accident Operation of the High Radiation Sample Room EP-TSC-7 (Original)

RV Head Venting Time Calculation These revised procedures supersede the previously submitted procedures.

Very truly yours, C. W. Giesler Vice President - Nuclear Power DSN/js Attachment cc - Mr. J. G. Keppler, US NRC - Region III Mr. William Snell, US NRC, w/o attach.

Mr. Robert Nelson, US NRC, Mr. C. F. Riederer, PSCW Mr. S. A Varga, US NRC o a.

0~o NO 0

00 NO 0<

(DOAL