ML111651084

From kanterella
Jump to navigation Jump to search
Forwards Exxon Nuclear Co Rept XN-NF-79-27,Cycle 5 SAR & Wi Nuclear Co Repts Reload Safety Evaluation, , & Reactor Test Program,
ML111651084
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/08/1979
From: Mathews E
Wisconsin Public Service Corp
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML111651085 List:
References
NUDOCS 7905100289
Download: ML111651084 (2)


Text

.

REGULATORY INFORMATION DISTRIBUTION SYSI (RIDS)

ACCESSION NBR:7905100289 DOC.DATE: 79/05/08 NOTARIZED: NO FACIL:50-305 KEWAUNEE NUCLEAR POWER PLANT, WISCONSIN PUBLIC SERVIC AUTH.NAME AUTHOR AFFILIATION MATHEWSE.R, WISCONSIN PUBLIC SERVICE CORP.

RECIP.NAME RECIPIENT AFFILIATION SCHWENCERA.

OPERATING REACTORS BRANCH 1 DOCKET #

05000305 7qo5OOggo

SUBJECT:

FORWARDS EXXON NUCLEAR CO REPT XN*NF*79-27,"CYCLE 5 SAR" &

WI NUCLEAR CO REPTS:"RELOAD SAFETY EVALUATION" DTD 790431 &

"REACTOR OfS;PROGRAM" DTD 79053 1j4s-9r2o9 DISTRIBUTION CODE: A001S COPIES RECE VED:LTR.1 ENCL SIZE:

If' 1

TITLE: GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LIC NOTES:

&L4-4z-admL RECIPIENT ID CODE/NAME ACTION:

05 BC COPIES LTTR ENCL 7

7 RECIPIENT ID CODE/NAME COPIES LTTR ENCL o

12 I&E 15 CORE PERF BR 17 ENGR BR 19 PLANT SYS BR 21 EFLT TRT SYS 1

2 1

1 1

1 1

2 1

1 1

1 02 14 16 18 20 22 NRC POR TA/EDO AD SYS/PROJ REAC SFTY BR EEB BRINKMAN EXTERNAL:

03 LPDR 23 ACRS 1

16 1

04 NSIC 16 M1AY 11lgyg TOTAL NUMBER OF COPIES REQUIRED: LTTR INTERNAL:

1 1

1 1

1 1

1 1

1 1

1 1

a 1

1

/w 41-t.

mfi-77-.

38 ENCL 38

WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 May 8, 1979 Mr. A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Kewaunee Nuclear Power Plant Docket No.

50-305 Operating License DPR-43 Enclosed please find the following:

1)

Forty (40) copies of Exxon Nuclear Company report XN-NF-79-27, Rev. 1 entitled "Kewaunee Nuclear Power Plant Cycle 5 Safety Analysis Report."

2) Forty (40) copies of Wisconsin Public Service Corporation topical report, "Reload Safety Evaluation Kewaunee Cycle V, April, 1979."
3) Forty (40) copies of Wisconsin Public Service Corporation topical report, "Reactor Test Program, Kewaunee Nuclear Power Plant,"

May, 1979.

The above referenced WPS Reload Safety Evaluation and Exxon Safety Analysis Report for Kewaunee Cycle 5 document the safety reviews performed for the Cycle 5 core. No unreviewed safety concerns have been perceived by either Exxon or WPS. The enclosed documents are provided for your information.

The third item of this submittal contains information requested by the NRC staff in our March 8, 1979 meeting. The referenced report addresses this request.

Very truly yours, E.

R. Mathews, Vice President Power Supply & Engineering snf 7905100 874 Enc.