NL-11-060, Revised Table from Entergy Letter NL-11-014 Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions
| ML11158A197 | |
| Person / Time | |
|---|---|
| Site: | Indian Point (DPR-026) |
| Issue date: | 05/26/2011 |
| From: | Joseph E Pollock Entergy Corp, Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-11-060, TAC ME0798 | |
| Download: ML11158A197 (13) | |
Text
-Entergy Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 734-6700 J.E. Pollock Site Vice President NL-1 1-060 May 26, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Revised Tables from Entergy Letter NL-1 1-014 Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions for Indian Point Unit No. 2 (TAC No.
ME0798)
Indian Point Unit No. 2 Docket No. 50-247 License No. DPR-26
References:
- 1. Entergy letter NL-1 1-014, "Revised Tables from Responses to Requests for Additional Information Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph ilI.G.2 for Use of Operator Manual Actions for Indian Point Unit No. 2 (TAC No.
ME0798)," dated February 10, 2011
- 2. Entergy letter NL-1 1-006, "Response to December 16, 2010 Request for Additional Information Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions for Indian Point Unit No. 2 (TAC No. ME0798)," dated January 19, 2011
- 3. NRC letter dated December 16, 2010, "Indian Point Nuclear Generating Unit Nos. 2 and 3 - Request for Additional Information Regarding Request for Exemption (TAC Nos. ME0798 and ME0799)"
NL-1 1-060 Docket No. 50-247 Page 2 of 3
- 4. Entergy letter NL-1 0-100, "Response to August 11, 2010 Request for Additional Information Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions for Indian Point Unit No. 2 (TAC No. ME0798)," dated September 29, 2010
- 5. NRC letter dated August 11, 2010, "Indian Point Nuclear Generating Unit Nos. 2 and 3 - Request for Additional Information Regarding Request for Exemption (TAC Nos. ME0798 and ME0799)"
- 6. Entergy letter NL-10-042, "Response to January 20, 2010 Request for Additional Information Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions for Indian Point Unit No. 2 (TAC No. ME0798)," dated May 4, 2010
- 7. NRC letter dated January 20, 2010, "Indian Point Nuclear Generating Unit Nos. 2 and 3 - Request for Additional Information Regarding Request for Exemption (TAC Nos. ME0798 and ME0799)"
- 8. Entergy letter NL-09-116, "Revision to Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions for Indian Point Unit No. 2," dated October 1, 2009
- 9. Entergy letter NL-09-031, "Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions for Indian Point Unit No. 2," dated March 6, 2009
Dear Sir or Madam:
References 1 through 9 identify the Entergy and NRC letters involving the request for exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for the use of operator manual actions. The purpose of this letter is to provide revised pages to Tables RAI-01.1-1 and RAI-01.1-2, with additions indicated by bold underline and deletions by bold strikethrough. These pages replace the pages previously provided in Reference 1.
Note that the replacement pages may contain changes made in previous letters, with additions also indicated by bold underline and deletions by bold strikethrough. A summary of the changes and the reasons for the changes provided in each enclosure indicates which changes are made in this current letter.
NL-1 1-060 Docket No. 50-247 Page 3 of 3 There are no new commitments being made in this submittal. If you have any questions or require additional information, please contact Mr. Robert W. Walpole, IPEC Licensing Manager at (914) 734-6710.
Sincerely, JEP/gd
Enclosure:
- 1. Revised Pages for Table RAI-01.1-1 from Entergy Letter NL-11-014 dated February 10, 2011
- 2. Revised Pages for Table RAI-01.1-2 from Entergy Letter NL-11-014 dated February 10, 2011 cc:
Mr. John P. Boska, Senior Project Manager, NRC NRR DORL Mr. William Dean, Regional Administrator, NRC Region I NRC Resident Inspector's Office, Indian Point Energy Center Mr. Paul Eddy, New York State Department of Public Service Mr. Francis J. Murray, Jr., President and CEO, NYSERDA
ENCLOSURE1 TO NL-1 1-060 Revised Pages for Table RAI-01.1-1 from Entergy Letter NL-1 1-014 dated February 10, 2011 ENTERGY NUCLEAR OPERATIONS, INC.
Indian Point Nuclear Generating Unit No. 2 Docket No. 50-247 License No. DPR-26
NL-1 1-060 Docket No. 50-247 Page 1 of 1 Summary of Required Changes to Table RAI-01.1-1 from Entergy Letter NL-11-014 dated February 10, 2011 Change Reason for Change ADD Entergy Letter NL-1 1-014 reference to footnote 1 Information in Tables RAI-08.1-2, 08.1-3, and 08.1-4 was revised in Entergy Letter NL-1 1-014 DELETE Area/Zones K/60A and K165A from the Required OMA These zones were inadvertently included on the table of "Operate 22 AFW Pump flow control valves to align AFW flow to selected steam generator(s)
REVISE the wording of the Required OMA from "Open IIP-500X To agree with the description of the OMA on Table RAI-08.1-3; to enable ASSS pneumatic instruments" to "Activate/enable these instruments were inadvertently omitted from the Required Alternate Safe Shutdown System (ASSS) pneumatic instruments OMA and Component of Concern columns; the cables in the (Steam Generator level, Pressurizer pressure and level) at Fan Cables of Concern column included cables for all instruments House local control panel. Also enable ASSS source-range having cables in Containment (pressurizer pressure channels channel and Loop 21 and 22 hot (Th) and cold leg (Tc) only have sensing lines in Containment), but the cables for the temperature channels." Add "source range, and RCS hot and source range channels were inadvertently omitted.
cold leg temperature" to the Component of Concern column, and add cables FD1-H27108 and FD5-H30/08 for source range channels to the Cables of Concern column.
NL-11-014 Docket No. 50-247 Page 2 of 13 ORIGINALLY PROVIDED IN ENTERGY LETTER NL-11-006 DATED JANUARY 19, 2011 TABLE RAI-01.1-1 OMA Initiator Cables of Concern and Mitigating Features Minimizing the Potential to Require Use of Credited OMAs OMA ReuiedOM 1
Initiator Component of Required OMA1 FitiArea Concern 1 Cables of Concern2 Fire Protection Defense in Depth 3 Fire Zone' Operate 22AFW Pump Area C 21 AFW Pump EDC5-M74/1 Exemption granted for App R III.G.2 in this area - SERs (turbine-driven)
Zone 23 EDC5-M74/2 dated Oct 16, 1984 and March 4, 1987 ELD11-EWC26 Area Wide Smoke Detection 23 AFW Pump JB1-PT1/1 Low Fixed Combustible Loading PT1-A19 Transient Combustible Controls XD7-M75/1 Minimal Ignition Sources XD7-M75/2 Hot Work & Ignition Source Controls Portable Extinguishers in the zone 23 AFW Pump power cable wrapped w/ 30 minute ERFBS Radiant Energy Shield installed between 21 & 23AFW Pump Open/check open 22 Area C PCV-1139 JB1-PT1/3 Exemption granted for App R III.G.2 in this area - SERs AFW Pump steam Zone 23 PT1-RH7 dated Oct 16, 1984 and March 4, 1987 supply isolation valves PT1-YL4 Area Wide Smoke Detection Low Fixed Combustible Loading Transient Combustible Controls Minimal Ignition Sources Hot Work & Ignition Source Controls Portable Extinguishers in the zone 23 AFW Pump power cable wrapped w/ 30 minute ERFBS Radiant Energy Shield installed between 21 & 23AFW Pump
References:
Entergy letter NL-10-042 dated May, 4, 2010, Tables RAI-08.1-l through RAI-08.l-7; Entergy letter NL-10-100 dated September 29, 2010, Tables RAI-08.1-1, RAI-08.1-2, and RAI-08.1-4; Entergy letter NL-I 1-014 dated February 10. 2011, Tables RAI-08.1-2. RAI-08.1-3, RAI-08.1-4 2
Reference:
Entergy letter NL-10-100 dated September 29, 2010, RAI-02. ! response 3
References:
Entergy letter NL-10-042 dated May, 4, 2010, Tables RAI-GEN-I through GEN-27; Entergy letter NL-10-100 dated September 29, 2010, Tables RAI-GEN-I, RAI-GEN-10, RAI-GEN-23, RAI-GEN-25, RAI-GEN-28, RAI-GEN-29, RAI-GEN-30, and RAI-GEN-31 REVISED IN ENTERGY LETTER NL-11-060 DATED MAY 26, 2011
NL-1 1-014 Docket No. 50-247 Page 3 of 13 ORIGINALLY PROVIDED IN ENTERGY LETTER NL-11-006 DATED JANUARY 19, 2011 TABLE RAI-01.1-1 OMA Initiator Cables of Concern and Mitigating Features Minimizing the Potential to Require Use of Credited OMAs OMA Required OMA' Initiator Component of Cables of Concern2 Fire Protection Defense In Dept3 Fire Area Concern' Fire Zone' Operate 22 AFW Pump Area C FCV-405A JB1-LV1 Exemption granted for App R III.G.2 in this area - SERs flow control valves to Zone 23 dated Oct 16, 1984 and March 4, 1987 align AFW flow to FCV-405B JB1-LV2 Area Wide Smoke Detection selected steam Low Fixed Combustible Loading generator(s)
FCV-405C JB1-LV3 Transient Combustible Controls Minimal Ignition Sources FCV-405D JB1-LV4 Hot Work & Ignition Source Controls Portable Extinguishers in the zone 23 AFW Pump power cable wrapped w/ 30 minute ERFBS FCV-406A ELZ27-YN6 Radiant Energy Shield installed between 21 & 23AFW Pump JF5-YN6 PU9-JG2 FCV-406B ELZ28-YN8 JF5-YN8 LL8-JF5 PU9-JH1 FCV-406C ELZ29-YN7 JF9-YN7 LL9-JF9 PU9-JF2 FCV-406D ELZ30-YN5 JF9-YN5 PU9-JF9 AFCV406A PtJ9G2 o-w-Fed Combustible Loading Zone 60A Wi8-F Transient Combustiblc Controls FCV 406B PU9 ]HI Meinal ignition Sources Hot Work & ignition Source Controls FGV-406C PIF2 Portable Extinguishers in thc zone L--F9 Hydrants in adjacent yard FGV-406D PU9-3F9 REVISED IN ENTERGY LETTER NL-11-060 DATED MAY 26, 2011
NL-1 1-014 Docket No. 50-247 Page 4 of 13 ORIGINALLY PROVIDED IN ENTERGY LETTER NL-11-006 DATED JANUARY 19, 2011 TABLE RAI-01.1-1 OMA Initiator Cables of Concern and Mitigating Features Minimizing the Potential to Require Use of Credited OMAs OMA Required OMA 1 Initiator Component of Cables of Concern2 Fire Protection Defense In Dept3 Fire Area Concern1 Fire Zone1 Area Kl FlV 46 PU9 jG Low Famed Combustible Leading Zene 65 L
-rans.,nt Combustible Centro's FGV 4068 9
MPi Initon Sources Hot Work & Ignition Source Gentros FGV 406C P4I9 F2 Portaible Extinguisher-s in the zone LL9-JF9 Hydrants in adjacent yard FGV-406D P U9-1F9 Align charging Area F MOV-227 ECD3-EXF6/2 Area Wide Smoke Detection makeup path to RCS Zone 27A HCV-- 142 Moderate Fixed Combustible Loading (locally open bypass Transient Combustible Controls valve 227 to mitigate Minimal Ignition Sources a spuriously closed Hot Work & Ignition Source Controls HCV-142)
Portable Extinguishers in the zone Hose Station in the zone Area F MOV-227 ECD3-EXF6/2 Open to Zone 27A w/ Area Wide Smoke Detection Zone 33A HCVC--142 Moderate Fixed Combustible Loading Transient Combustible Controls Hot Work & Ignition Source Controls Portable Extinguishers in adjacent zone Hose Station in adjacent zone Area F MOV-227 ECD3-EXF6/2 Thermistor and Smoke Detector for Charcoal Filters Zone 59A HCVG-142 Minimal Ignition Sources Portable Extinguishers in the zone Hose Station in adjacent zones Hydrant in adjacent yard Transient Combustible Controls Hot Work & Ignition Source Controls REVISED IN ENTERGY LETTER NL-11-060 DATED MAY 26, 2011
NL-1 1-014 Docket No. 50-247 Page 8 of 13 ORIGINALLY PROVIDED IN ENTERGY LETTER NL-11-006 DATED JANUARY 19, 2011 TABLE RAI-01.1-1 OMA Initiator Cables of Concern and Mitigating Features Minimizing the Potential to Require Use of Credited OMAs OMA Required OMA' Initiator Component of Fire Area Concern' Cables of Concern2 Fire Protection Defense in Dept 3 Fire Zone' Activate/enable Area H All normal safe-EPC3-H39/4 Low Fixed Combustible Loading Alternate Safe Zone 70A shutdown EPC4-H41/4 Transient Combustible Controls Shutdown System Zone 75A instrument channels EPC4-H41/3 Minimal Ignition Sources (ASSS) pneumatic Zone 77A for steam generator EPC3-H39/3 Hot Work & Ignition Source Controls instruments (Steam Zone 87A level, pressurizer PN8-H39/2 Hose station in adjacent zone Generator level, level, and PR3-H41/2 RCP Smoke Detection Pressurizer pressure pressurizer PR4-H33/2 and level) at Fan pressure, source PR4-H33/3 House local control range, and RCS ETC5-EZC9 panel. Also enable hot and cold leg EZC9-H27 ASSS source-range temperature ETD4-EZA5 channel and Loop 21 EZA5-H52 and 22 hot (Th) and ETC6-EZD1 cold leg (Tc)
EZD1-H30 temperature ETD5-EZA6 channls.Gpen4ff-EZA6-H20 v500X to enable ASSS ETC7-EZD2 p.e...at EZD2-H20 instr1uflwt ETD6-EZA7 EZA7-H21 ETC8-EZD3 EZD3-H23 ETD7-EZA8 EZA8-H22 FD1-H27/08 FD5-H30/08 REVISED IN ENTERGY LETTER NL-11-060 DATED MAY 26, 2011
ENCLOSURE 2 TO NL-1 1-060 Revised Pages for Table RAI-01.1-2 from Entergy Letter NL-1 1-014 dated February 10, 2011 ENTERGY NUCLEAR OPERATIONS, INC.
Indian Point Nuclear Generating Unit No. 2 Docket No. 50-247 License No. DPR-26
NL-1 1-060 Docket No. 50-247 Page 1 of 1 Summary of Required Changes to Table RAI-01.1-2 from Entergy Letter NL-11-014 dated February 10, 2011 Change Reason for Change i
REVISE the wording of the OMA from "Open IIP-500X to enable ASSS pneumatic instruments" to "Activate/enable Alternate Safe Shutdown System (ASSS) pneumatic instruments (Steam Generator level, Pressurizer pressure and level) at Fan House local control panel. Also enable ASSS source-range channel and Loop 21 and 22 hot (Th) and cold leg (Tc) temperature channels." Add "source range, and RCS hot and cold leg temperature" to the Affected Component(s) column, and add cables FDI-H27/08 and FDS-H30/08 for source range channels to the Associated Cables column.
To agree with the description of the OMA on Table RAI-08.1-3; these instruments were inadvertently omitted from the OMA and Affected Component(s) columns; the cables in the Associated Cables column included cables for all instruments having cables in Containment (pressurizer pressure channels only have sensing lines in Containment), but the cables for the source range channels were inadvertently omitted.
NL-1 1-014 Docket No. 50-247 Page 8 of 20 ORIGINALLY PROVIDED IN ENTERGY LETTER NL-11-006 DATED JANUARY 19, 2011 Table RAI-01.1-2 1P2 Fire Area H Credited OMAs And Cable/Component Failures That May Require the Use of the Credited OMAs Type of cable Effect of cable Affected Associated failure(s) that may failure that Comments / Conclusion OMA Component(s)
Cables cause need for leads to need OMA for OMA Close IA-501 to Valve 204A Y17-H55 Intra-cable short, Valves 204A The fire challenge within Fire Area H fail open valves Valve 204B Y15-H50 inter-cable short and 204B are (reactor containment) is minimal 204A and 204B spuriously during plant power operation. The closed due to principal hazard, the RCP lube oil internal cable inventories, are secured by virtue of oil fault collection systems that capture and conduct any oil leakage to collection tanks located in the containment annulus area, away from any hot surfaces and ignition sources. The potential for a fire within this area, during plant power operation, sufficient to cause damage to both 204A and 204B cables, is considered to be low. Either valve 204A OR 204B remaining open is sufficient to support normal RCS makeup from the CVCS charging pump selected for use.
Activate/enable All normal All cables Intra-cable short, Loss of all The fire challenge within Fire Area H Alternate Safe safe-shutdown associated with open circuit, normal (reactor containment) is minimal Shutdown instrument the following ground fault, or (electronic) during plant power operation. The System (ASSS) channels for normal inter-cable hot instrument principal hazard, the RCP lube oil pneumatic steam instrumentation short channels for inventories, are secured by virtue of oil instruments generator level, channels for the any of the collection systems that capture and (Steam pressurizer parameters primary or conduct any oil leakage to collection REVISED IN ENTERGY LETTER NL-11-060 DATED MAY 26, 2011
NL-1 1-014 Docket No. 50-247 Page 9 of 20 ORIGINALLY PROVIDED IN ENTERGY LETTER NL-11-006 DATED JANUARY 19, 2011 Table RAI-01.1-2 IP2 Fire Area H Credited OMAs And Cable/Component Failures That May Require the Use of the Credited OMAs Type of cable Effect of cable OMA Affected Associated failure(s) that may failure that Comments / Conclusion Component(s)
Cables cause need for leads to need OMA for OMA Generator level,-and listed at left:
secondary tanks located in the containment level pressurizer EPC3-H39/4 system annulus area, away from any hot Pressurizer
- pressure, EPC4-H41/4 parameters surfaces and ignition sources. The pressure and source range, EPC4-H41/3 listed at left principal area of common routing of level) at Fan and RCS hot EPC3-H39/3 normal instrument channel cables is in PN8-H39/2 House local and cold leg PR3-H41/2 the electrical penetration area of control panel.
temperature PR4-H33/2 containment. The cables in this area Also enable PR4-H33/3 are of asbestos/glass braid jacket ASSS source-ETC5-EZC9 construction (or other IEEE 383 Flame ranae channel EZC9-H27 Test qualified construction), the area is and Loop 21 ETD4-EZA5 devoid of ignition sources, and the and 22 hot (Th)
EZA5-H52 area is equipped with a smoke and cold leg ETC6-EZD1 detection system. The potential for a GO EZD1-H30 fire within this area, during plant tempeatureETD5-EZA6 temperature EZA6-H20 power operation, sufficient to cause channels.OpeR ETC7-EZD2 damage to multiple trains of normal lipr500X W EZD2-H20 instrument channel cables, is enable-ASSS ETD6-EZA7 considered to be low.
p*,e.mati.
EZA7-H21 "struments ETC8-EZD3 EZD3-H23 ETD7-EZA8 EZA8-H22 FD1-H27/08
_ FD5-H30/08 REVISED IN ENTERGY LETTER NL-11-060 DATED MAY 26, 2011