ES-301 Administrative Topics Outline Form ES-301-1 Facility:
St. Lucie Date of Examination:
2/21/1 1 Examination Level (circle one):
RO/SRO Operating Test Number:
NRC Administrative Topic Type Describe activity to be performed (see Note)
Code*
M,R Al Conduct of Operations Perform a Manual Calorimetric Unit 2 N,R A2 Conduct of Operations Determine time SDC entry conditions are required based on available CST level.
N,R A3 Equipment Control Develop Equipment Clearance Order for 2A HPSI Pump M,R A4 Radiation Control (SRO) Determine Exposure Limits Under Emergency Conditions A5 (RO) Determine Exposure Limits Under Normal Conditions N,SorR A6 Emergency Plan (SRO) Respond to Security Event NOTE:
All items (5 total) are required for SROs. RD applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RD retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams ( 1; randomly selected)
I NUREG-1 021, Revision 9
ES-301 Administrative Topics Outline Form ES-301-i ADMINISTRATIVE JPM
SUMMARY
Al: Conditions given on Unit 2 at 30% power. Direction given to perform a manual calorimetric.
Plant data is given on cue sheet so calculation can be performed in the classroom in a group setting.
A2: Given CST level and plant conditions determine time SDC entry conditions required.
A3: Develop ECO to replace defective shaft seals on the 2A High Pressure Safety Injection pump. Identification of applicable Technical Specifications when removing the 2A HPSI from service are also required.
A4: SRO: A LOCA has occurred with an isolable leak on the Charging pump. Given the dose rate and time to isolate the leak the SRO is to determine if an individual can perform this evolution without exceeding the Emergency Plan guidelines.
A5: RO: Radiological conditions are given to repair the refueling machine. Four individuals (two FPL and two contract personnel) are assigned to perform the repair. The individuals past exposure is given. The RO is to determine if the individuals can perform the repairs without the Site Vice Presidents approval.
A6: TIME CRITICAL. Conditions will be given that armed intruders have entered the protected area. Direction is given to implement 0-AOP-72.0l, Response to Security Events. This will lead into implementing EPIPS.
NUREG-l 021, Revision 9
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM PERFORM A MANUAL CALORIMETRIC UNIT 2 Al CANDIDATE EXAMINER
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM PERFORM A MANUAL CALORIMETRIC UNIT 2 KA Statement:
2.1.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
KA#:
4.4/4.7
References:
2-3200020, Primary System Manual Calorimetric Steam Tables Enthalpy Tables for Plant Calculator Candidate:
Time Start Name Time Finish Performance Rating:
Sat Unsat Validation Time 20 minutes Examiner:
Signature:
Comments NRCJPM Al.
ADMINISTRATIVE JPM PAGE 2
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM PERFORM A MANUAL CALORIMETRIC UNIT 2 Directions to the candidate for Administrative JPMS:
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference needed to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
Initial Conditions It is Wednesday, 2-21-11. Unit 2 is at approximately 30% (DCS calorimetric power is 30.28%), returning from a Short Notice Outage. A Chemistry hold is in effect until further notice.
Initiating Cue The Unit Supervisor has instructed you to perform a primary system manual calorimetric lAW 2-3200020. No computers are available to perform this calculation.
NRCJPMA1.
ADMINISTRATIVE JPM PAGE 3
Data Sheet if performed in classroom Steam Pressures Pl-8013A:
885 psia Pl-8023A:
886 psia Pl-8013B:
887 psia Pl-8023B:
886 psia PI-8013C:
888 psia Pl-8023C:
887 psia Pl-8013D:
889 psia PI-8023D:
886 psia Feedwater temperatures are 330 degrees F Total blowdown = 80 gpm Feed flow 9011-2 (ERDADS)= 1.56 xlOE6 Ibm/hr Feed flow 9021-2 (ERDADS)= 1.56 xlOE6 Ibm/hr DOS pt KFA = 29101 DOS pt KFB = 29345 Charging and Letdown are in operation NRCJPM Al.
ADMINISTRATIVE JPM PAGE 4
START TIME:
Data Sheet I of OP 2-3200020 Primary System Manual Calormetric STEP I:
Date and Time STANDARD:
ENTER 2/21/11 and current time.
SAT COMMENTS:
UNSAT STEP 2:
ENTER MAIN STEAM PRESSURE CRITICAL PI-8013A__________
STEP PI-8023A____________
P1-801 3B____________
PI-8023B___________
SAT P1-801 3C____________
Pl-8023C____________
P1-801 3D__________
UNSAT Pl-8023D____________
STANDARD:
ENTER correct reads from PIs on RTGB-206 of Simulator Band: (886 887)
Or 887 average for all pressures per classroom data COMMENTS:
STEP 3:
COMPUTE TOTAL FEEDWATER FLOW CRITICAL STEP A. Loop x
÷29178 xlO 6
lb/hr (FT9O1 1-2 (ERDADS), or FR 9011)
STANDARD:
ENTER and CALCULATE A. Loop 1.56 x
29101
÷29178=1.5559 x10 6 lb/hr UNSAT (FT9OI 1-2 (ERDADS), or FR 9011)
Band: (1.54 1.58)
Band: (1.531.58)
COMMENTS:
NRC JPM Al.
ADMINISTRATIVE JPM PAGE 5
STEP 4:
COMPUTE TOTAL FEEDWATER FLOW CRITICAL STEP B. Loop x
÷29050=
xlO 6
Ib/hr (FT9021-2 (ERDADS), or FR 9021)
STANDARD:
ENTER and CALCULATE B. Loop 1.56 x
29345
÷29050=1.5758 x10 6 lb/hr UNSAT (FT9021-2 (ERDADS), or FR 9021)
Band: (1.541.58)
Band: (1.551.60)
COMMENTS:
STEP 5:
COMPUTE TOTAL FEEDWATER FLOW CRITICAL STEP MFw=
x10 6 lb/hr (Total A+B Loop)
STANDARD:
ENTER and CALCULATE UNSAT MFw=
3.1317 xlO 6
Ib/hr (Total A+B Loop)
Band: (3.093.17)
COMMENTS:
STEP 6:
Average Steam Pressure =
divided by 8 CRITICAL TOTAL AVERAGE STEP STANDARD:
ENTER and CALCULATE SAT Average Steam Pressure =
7094 divided by 8 887 TOTAL AVERAGE Band: (7050 7100)
Band: (880900)
UNSAT COMMENTS:
NRC JPM Al.
ADMINISTRATIVE JPM PAGE 6
STEP 7:
ENTER FEEDWATER TEMPERATURE CRITICAL STEP TR-09-5B Channel 1
°F (behind RTGB 202)
Channel 2
°F SAT STANDARD:
ENTER UNSAT TR-09-5B Channel 1 330
°F (behind RTGB 202)
Channel 2 330
°F COMMENTS:
STEP 8:
Average Feedwater Temperature =
divided by 2 =
CRITICAL TOTAL AVERAGE STEP STANDARD:
ENTER and CALCULATE SAT Average Feedwater Temperature 660 divided by 2 =
330 TOTAL AVERAGE Band: (656 664)
Band: (328 332)
UNSAT COMMENTS:
STEP 9:
From the steam tables, enter the enthalpy of the average steam pressure:
CRITICAL STEP hsTEAM=
STANDARD:
ENTER hsTEAM 1196.95 BTU/Ibm UNSAT Band: (1197.30 1196.20)
COMMENTS:
NRCJPM Al.
ADMINISTRATIVE JPM PAGE 7
STEP 10:
Calculate the heat output due to steam flow (QsTEAM):
CRITICAL 106 106 STEP hsTEAM x
[MFw MBD]
=
QsTEAM SAT STANDARD:
ENTER and CALCULATE UNSAT 1196.95 3.1317 106
.039599 106 3748.44 IO 6
BTU/hr hsTEAM x
[MFw MBD]
QsTEAM Band: (3700 3800)
COMMENTS:
STEP 11:
From the steam tables, enter the enthalpy of the average feedwater CRITICAL temperature:
STEP hFw=
BTU Ibm SAT STANDARD:
ENTER UNSAT hFw =
300.8 BTU Ibm Band: (298.7 302.9)
COMMENTS:
STEP 12:
Calculate the heat feedwater heat input (QFw):
CRITICAL STEP x10 6
)x(
)=
x1O 6
BTU MFw hFw QFw hr STANDARD:
ENTER and CALCULATE UNSAT (3.1317 x10 6
)x( 300.8
)=
942.02 xIO 6
BTU MFw hFw QFw hr Band: (923 960)
COMMENTS:
NRC JPMA1.
ADMINISTRATIVE JPM PAGE 8
NRC JPM Al.
ADMINISTRATIVE JPM PAGE 9 STEP 13:
Circle the total blowdown flow from the SIGs and the corresponding heat output:
(Interpolation is not required, circle the closest blowdown flow below or the lower flow if between conservative.)
flow rates, to be Total blowdown flow (both steam generators) 40 GPM 80 GPM 120 GPM 160 GPM 200 GPM 240 GPM SAT Mass flow of blowdown MBD
.019799 x 106 Ibm/hr
.039599 x 106 Ibm/hr
.059398 x 106 Ibm/hr
.0791 98 x 106 Ibm/hr
.098997 x 106 Ibm/hr
.118797 x 106 Ibm/hr UNSAT Heat output from blowdown QBD 9.728 x 106 BTU/hr 19.456 x 106 BTU/hr 29.183 x 106 BTU/hr 38.912 x 106 BTU/hr 48.639 x 106 BTU/hr 58.367 x 106 BTU/hr STANDARD:
CIRCLE 80 GPM line Mass flow of blowdown MBD
.019799 x 106 Ibm/hr Total blowdown flow (both steam generators) 40 GPM EEEE 120 GPM 160 GPM 200 GPM 240 GPM
.039599 x 106 Ibm/hr
.059398 x 10 Ibm/hr
.079198 x 106 Ibm/hr
.098997 x 106 Ibm/hr
.118797 x 106 Ibm/hr COMMENTS:
Heat output from blowdown QBD 9.728 x 106 BTU/hr iioBTU7h 29.183 x 106 BTU/hr 38.912 x 1106 BTU/hr 48.639 x 106 BTU/hr 58.367 x 106 BTU/hr
STEP 14:
Calculate the heat output from the core:
CRITICAL If charging and letdown flow is secured for any reason, use a STEP value of 48.952 for Q0THER.
SAT If charging and letdown flow is operating normally, use a value of 46.905 for Q0THER.
UNSAT
+
_____]
xIO 6
BTU QsTEAM QFw QBD Q0THER hr Qc0RE hr STANDARD:
ENTER and CALCULATE
[3748.44
942.02
+ 19.456
46.905] X 106 BTU =
2778.97 X 106 BTU Q5TEAM QFw QBD Q0THER hr Qc0RE hr Band: (27602810)
COMMENTS:
NRC JPM Al.
ADMINISTRATIVE JPM PAGE 10
NOTE CRITICAL Calculated Power in percent must be within 2% of DCS Calorimetric STEP power. If not, notify the US I SM. Initiate W/R for 1CM to adjust AT power.
SAT UNSAT STEP 15:
Calculate percent core power:
Manual Core Power =
x 106 divided by (92.128 x 106) =
Calorimetric QCORE Power STANDARD:
ENTER and CALCULATE I
Manual Core Power 2778.97 x 106 divided by (92.128 x 106) 130.16 %
Calorimetric QCORE Power Band: (29.89 30.49)
Record DCS Calorimetric Power (QRP% 10 Minute aye). (QRPP (instantaneous) should be used below if the reactor has been in a stable configuration for at least 10 minutes)
DCS Calorimetric Power COMMENTS:
NRC JPMA1.
ADMINISTRATIVE JPM PAGE 11
STEP (done):
Inform Candidate JPM is complete.
STANDARD:
EXAMINERS CUE:
THIS JPM IS COMPLETE.
COMMENTS:
UNSAT END OF TASK STOP TIME:
NRC JPM Al.
ADMINISTRATIVE JPM PAGE 12
CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
Initial Conditions It is Wednesday, 2-21-11. Unit 2 is at approximately 30% (DCS calorimetric power is 30.28%), returning from a Short Notice Outage. A Chemistry hold is in effect until further notice.
Initiating Cue The Unit Supervisor has instructed you to perform a primary system manual calorimetric lAW 2-3200020. No computers are available to perform this calculation.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM
SIMULATOR JPM SETUP 1.
RESTORE IC-3, 29% power, MOL.
2.
UNFREEZE simulator.
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DETERMINE TIME SDC ENTRY CONDITIONS ARE REQUIRED BASED ON AVAILABLE CST LEVEL -
UNIT I NRC A2 Developed/Revised by:
Training Management Approval:
Larry Rich Date Date JPM NRCA2 RevO Page 1 of 6
JOB PERFORMANCE MEASURE Task:
Given a set of conditions, determine time SDC entry conditions are required based on available CST level Unit 1.
Faulted JPM?
No Facility JPM #:
New K/A: 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc.
K/A Rating(s):
3.9 I 4.2 Duty Area(s):
N/A Task Information:
07200105 Task Standard:
Determine time SDC entry conditions are required based on available CST level Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss x
x
References:
1-EOP-99, Appendices/Figures/Tables/Data Sheets, Revision 39B Validation Time:
10 minutes Time Critical:
NO Tools/Equipment/Procedures Needed:
1-EOP-99, Appendices/Figures/Tables/Data Sheets, Data Sheet 1, Figures 3, 4, 5, 6, 7 and 8 Calculator, Straight edge Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRCA2 RevO Page 2 of 6
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is: determine time SDC entry conditions are required based on available CST level Unit 1.
The performance level to be used for this JPM is Perform.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
a A Unit 1 reactor trip occurred from 100% power two (2) hours ago.
a One (1) RCP in each loop is operating.
a Reactor Coolant System Tcold is 530°F.
a Condensate Storage Tank (CST) level is 25 feet.
INITIATING CUES:
The Unit Supervisor has directed you to perform 1-EOP-99, Data Sheet 1, Determination Of Condensate Required to remove Decay Heat and RCP Heat and determine time SDC entry is required.
JPM NRCA2 RevO Page3of6
JOB PERFORMANCE MEASURE STARTTIME:
DATA SHEET I DETERMINATION OF CONDENSATE REQUIRED TO REMOVE DECAY HEAT AND RCP HEAT STEP 1(1):
RECORD the current CST level below.
STANDARD:
RECORDS 25 feet on Data Sheet I step 3.
SAT EXAMINERS NOTE:
PROVIDE Data Sheet I and Figures 3, 4, 5, 6, 7, and 8 UNSAT COMMENTS:
STEP 2 (2):
DETERMINE the number of CST feet needed to cool down from CRITICAL present RCS temperature to 300°F from Figure 3 and RECORD STEP below.
STANDARD:
RECORDS 3.8 feet on step 3, Figure 3 Value SAT EXAMINERS NOTE: Acceptable range 3.75 to 3.85 feet UNSAT COMMENTS:
STEP 3 (3):
SUBTRACT Figure 3 value from current CST level. The result is CRITICAL CST inventory available for RCS cooldown.
STEP STANDARD:
RECORD 21.2 on step 3 Available CST level SAT EXAMINERS NOTE: Acceptable range 21.25 to 21.42 CST level UNSAT COMMENTS:
JPMNRCA2RevO Page4of6
JOB PERFORMANCE MEASURE STEP 4 (4):
Utilize the available CST level value from above and DETERMINE CRITICAL the time until SDC entry conditions are required using Figure 4, 5, STEP 6, 7, or 8 depending on the number of RCPs that are operating.
STANDARD:
DETERMINES Figure 6 is used based on 2 RCPs running.
SAT DETERMINES 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> until SDC entry is required UNSAT EXAMINERS NOTE: Acceptable range 18 to 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> based on 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after shutdown and 21.2 feet available in CST.
EXAMINERS CUE:
When Data Sheet I is handed back, STATE: This JPM is complete.
COMMENTS:
END OF TASK STOP TIME:
JPM NRCA2 RevO Page 5 of 6
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
A Unit 1 reactor trip occurred from 100% power two (2) hours ago.
One (1) RCP in each loop is operating.
Reactor Coolant System Tcold is 530°F.
Condensate Storage Tank (CST) level is 25 feet.
INITIATING CUES:
The Unit Supervisor has directed you to perform 1-EOP-99, Data Sheet 1, Determination Of Condensate Required to remove Decay Heat and RCP Heat and determine time SDC entry is required.
Page6of6
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM Develop ECO for 2A HPSI Pump and Determine Associated Technical Specifications
- UNIT 2 A3 CANDIDATE EXAMINER JPM NRC A3 Rev. 0
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM Develop ECO for 2A HPSI pump KIA: 2.2.13 Knowledge of tagging and clearance procedures.
KIA Rating(s): 4.1 / 4.3
References:
P&ID 2998-G-078 SH 130A P&ID 2998-G-083 SH I P&ID 2998-G-078 SH 105A ADM-09.08 Operations In-Plant Equipment Clearance Orders 2-ADM-03.O1A Unit 2 Power Distribution Breaker List Operations Policy OPS-406 Clearance Database Conventions Candidate:
Time Start Name Time Finish Performance Rating:
Sat Unsat Validation Time 20 minutes Examiner:
Signature:
Cornments JPM NRC A3 REV. 0 PAGE 2
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM Develop ECO for 2A HPSI pump Directions to the candidate for Administrative JPMS:
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
Initial Conditions Unit 2 is at 100% power. The 2A HPSI pump has defective shaft seals and they are to be replaced. The 2B HPSI pump shaft seals have been determined to be satisfactory.
No other equipment is out of service.
Initiating Cue On the attached matrix, develop an Equipment Clearance Order for the 2A HPSI Pump that would facilitate replacing the pump shaft seals. Identify any applicable Technical Specifications associated with removing the 2A HPSI pump from service.
JPM NRC A3 REV. 0 PAGE 3
- CritiCal Step 2A HPSI Control Room Pump Switch
- Breaker 2-20201 eaker2-20201 Breaker 2-20201
- V3427 Danger
- V3470
_-o_
2A HPSI Pump Racked Out Plus Trip Fuse Removed N/A Close Fuse Removed N/A 2A HPSI Pump Locked Closed Plus Danger Discharge Valve 2A HPSI Pump Locked Closed Plus Danger Suction Valve 2AHPSI Pump Recwc Locked Closed Plus Danger Valve 2A HPSI Pump
/Locked Closd Plus Cooling Inlet Isol /
2A HPSI Pump
/
Locked Closed NOTE: The following drains and vent maybe opened and tagged but only ONE VENT and ONE DRAIN is needed to be opened-tp meet th critical step. #As per Ops Policy 406, Vents and Drains do not re üir a dan er.ta
. It is referred, but not re uired.
V3679 2A HPSI Pump Open
- Danger Casing\\Draifl
/
2A HPSLui1ip Suct.
Open
- Danger Vent 7
2A HPSI Purnp Open
- Danger Casing Drain \\
Technical-Specification:
3.5.2 Action a.2 Restore within 72 Hours or HSB next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> HSD the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
- V3938 JPMNRCA3REV.O
(TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
Directions to the candidate for Administrative JPMS:
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
Initial Conditions Unit 2 is at 100% power. The 2A HPSI pump has defective shaft seals and they are to be replaced. The 2B HPSI pump shaft seals have been determined to be satisfactory.
No other equipment is out of service.
Initiating Cue On the attached matrix, develop an Equipment Clearance Order for the 2A HPSI Pump that would facilitate replacing the pump shaft seals. Identify any applicable Technical Specifications associated with removing the 2A HPSI pump from service.
NRC A3
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM DETERMINE EXPOSURE LIMITS UNDER EMERGENCY CONDITIONS SROA4 CANDIDATE EXAMINER
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM EVALUATE PERSONNEL EXPOSURE LIMITS KA Statement: 2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions.
KA#:
3.2/3.7
References:
EPIP-02, Duties and Responsibilities of the Emergency Coordinator NOTE: No references to be handed out for this task Candidate:
Time Start Name Time Finish Performance Rating:
Sat Unsat Validation Time 10 minutes Examiner:
Signature:
Comments NRCJPM SROA4 Administrative JPM PAGE 2
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM EVALUATE PERSONNEL EXPOSURE LIMITS Directions to the candidate for Administrative JPMS:
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference needed to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
Initial Conditions A Large Break LOCA occurred on Unit 2 six hours ago. 2-EOP-03, LOCA is being used and all safety functions are being met. The 2B and 2C charging pumps are operable. An isolable leak had developed on the 2A Charging header and a reentry team that was attempting to close a valve to isolate the leak was unsuccessful due to a broken reach rod. Isolation of the leak is needed to prevent damage to the 2A Charging pump. Dose rates initially taken three (3) feet from the valve were 2.8 RIhr. HP states the person performing this task will be working within two (2) feet of the valve. The job is estimated to take 45 minutes to perform with ingress and egress dose negligible. The person performing this task has a year to date dose of 280 mR.
Initiating Cue As the EC (Emergency Coordinator) you have been asked to authorize a second reentry team tasked with disconnecting the reach rod linkage at the valve hand wheel and closing the valve. Determine the following:
- 1. Calculate dose that will be received while performing the task.
- 2. State the procedural limits for this task.
- 3. State whether this task will be allowable under current guidelines.
NRCJPMSROA4 Administrative JPM PAGE 3
START TIME:
STEP 1:
Calculate dose that will be received while performing the task.
CRITICAL STEP STANDARD:
Use inverse square law to calculate dose rate at 2 feet.
SAT DR 2
= DR 1 (R 1
)
2 1 (R 2
)
2 2
2 UNSAT DR 2 = (2.8 RIhr) (3 ft) 1(2 ft)
= 6.3 RIhr Apply 45 minutes to work valve:
6.3 RIhr x 45 minutes x I hrI6O minutes = 4.725 R EXAMINERS CUE:
NONE COMMENTS:
STEP 2:
Procedure limits for this task CRITICAL STEP STANDARD:
DETERMINES ACTIONS THAT WOULD NOT DIRECTLY MITIGATE THE SAT EVENT.
LIMIT 5 R EXAMINERS CUE:
NONE UNSAT COMMENTS:
STEP 3:
State whether this task will be allowable under current CRITICAL guidelines.
STEP STANDARD:
YES 4.725 R <5 R LIMIT SAT EXAMINERS CUE:
ACKNOWNLEDGE UNSAT EXAMINERS NOTE: If applicant incorrectly adds his 280 mr. exposure for the year to the 4.725 R for this task he I she will be> 5 R and may incorrectly NOT ALLOW THIS TASK.
COMMENTS:
NRC JPM SRO A4 Administrative JPM PAGE 4 STOP TIME:
CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
Initial Conditions A Large Break LOCA occurred on Unit 2 six hours ago. 2-EOP-03, LOCA is being used and all safety functions are being met. The 2B and 2C charging pumps are operable. An isolable leak had developed on the 2A Charging header and a reentry team that was attempting to close a valve to isolate the leak was unsuccessful due to a broken reach rod. Isolation of the leak is needed to prevent damage to the 2A Charging pump. Dose rates initially taken three (3) feet from the valve were 2.8 RJhr. HP states the person performing this task will be working within two (2) feet of the valve. The job is estimated to take 45 minutes to perform with ingress and egress dose negligible. The person performing this task has a year to date dose of 280 mr.
Initiating Cue As the EC (Emergency Coordinator) you have been asked to authorize a second reentry team tasked with disconnecting the reach rod linkage at the valve hand wheel and closing the valve. Determine the following:
- 1. Calculate dose that will be received while performing the task 2.
Determine your allowable dose for this task
- 3. State whether this task will be allowable under current guidelines NRCJPMSROA4 Administrative JPM PAGE 5
ST. LUCIE NUCLEAR PLANT ADMINISTRATIVE JPM DETERMINE EXPOSURE LIMITS UNDER NORMAL CONDITIONS ROA5 CANDIDATE EXAMINER
ST LUCIE NUCLEAR PLANT ADMINISTRATIVE JPM ST. LUCIE RADIATION REQUIREMENTS KA Statement:
2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions.
KA#:
3.2/3.7
References:
HP-2, FP&L Health Physics Manual NOTE: No references to be handed out for this task.
Candidate:
Time Start Name Time Finish Performance Rating:
Sat Unsat Validation Time 15 minutes Examiner:
Signature:
Comments NRCJPMROA5 ADMINISTRATIVE JPM PAGE 2
ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM ST. LUCIE RADIATION REQUIREMENTS Directions to the candidate for Administrative JPMS:
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference needed to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
Initial Conditions Unit 2 is in a refueling outage and refueling equipment preparations are under way. The Refueling Machine Hoist Box will need to be rebuilt.
The Hoist Box rebuild will take 45 minutes in a 2700 mR/hr field.
Below are the employees dose records:
Contract Lifetime Current Year Current Year Consult.
Age Dose FPL at St. Lucie total at all (TEDE)
(TEDE) sites 1
25 27 R 350 mR (TEDE) 2550 mR 2
38 35 R 550 mR 2000 mR FPL Lifetime Current Year Current Year Employee Age Dose FPL at St. Lucie total at all (TEDE)
(TEDE) sites 1
40 27 R 550 mR (TEDE) 650 mR 2
38 33 R 450 mR 450 mR Initiating Cue What dose would be received for each person and which employee(s) are allowed to rebuild the Hoist Box without the Site Vice Presidents approval?
NRCJPM ROA5 ADMINISTRATIVE JPM PAGE 3
START TIME:
STEP 1:
Calculates the dose the employee will receive performing the rebuild.
STANDARD:
CALCULATES 2700 mR/hr x 45 mm x I hr160 mm
= 2025 mR.
COMMENTS:
SAT UNSAT HP2, FP&L Health Physics Manual CRITICAL STEP 2:
Determines Contract employee #1s FPL Site and Total for All Sites doses.
STEP STANDARD:
DETERMINES that Contract employee #1 will exceed 4500 mR/year for All Sites and will need the St. Vice President approval. Therefore Contract employee #1 can NOT be used.
EXAMINERS NOTE: Contract employee #1 would receive 2375 mR for St.
Lucie site and 4575 mR for all sites.
UNSAT COMMENTS:
STEP 3:
Determines Contract employee #2s FPL Site and Total for All Sites doses.
CRITICAL STEP STANDARD:
DETERMINES that Contract employee #2 will not exceed FPL Site and Total for All Sites dose limits. Therefore Contract employee #2 CAN be used.
EXAMINERS NOTE: Contract employee #2 would receive 2575 mR for St.
SAT Lucie site and 4025 mR for all sites.
UNSAT COMMENTS:
NRCJPM ROA5 ADMINISTRATIVE JPM PAGE 4
STEP 4:
Determines FPL employee #1s FPL Site and Total for All Sites doses.
CRITICAL STEP STANDARD:
DETERMINES that FPL employee #1 will exceed 2500 mR/year for St.
Lucie Site and will need the St. Vice President approval. Therefore FPL employee #1 can NOT be used.
EXAMINERS NOTE: FPL employee #1 would receive 2575 mR for St. Lucie site and 2675 mR for all sites.
UNSAT COMMENTS:
STEP 5:
Determines FPL employee #2s FPL Site and Total for All Sites doses.
CRITICAL STEP STANDARD:
DETERMINES that FPL employee #2will not exceed FPL Site and Total for All Sites dose limits. Therefore FPL employee #2 CAN be used.
EXAMINERS NOTE: FPL employee #2 would receive 2475 mR for St. Lucie site and 2475 for all sites.
UNSAT COMMENTS:
STEP (done): Candidate informs the Examiner that the task is complete.
STANDARD: INFORMS the Examiner that the task is complete.
EXAMINERS CUE:
TASK IS COMPLETE COMMENTS:
U NSAT END OF TASK STOP TIME:
NRCJPM ROA5 ADMINISTRATIVE JPM PAGE 5
CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
Initial Conditions Unit 2 is in a refueling outage and refueling equipment preparations are under way. The Refueling Machine Hoist Box will need to be rebuilt.
The Hoist Box rebuild will take 20 minutes in a 6000 mRlhr field.
Below are the employees dose records:
Contract Lifetime Current Year Current Year Consult.
Age Dose FPL at St. Lucie total at all (TEDE)
(TEDE) sites 1
25 27 R 350 mR 2550 mR 2
38 35 R 550 mR 2000 mR FPL Lifetime Current Year Current Year Employee Age Dose FPL at St. Lucie total at all (TEDE)
(TEDE) sites 1
40 27 R 550 mR (TEDE) 650 mR 2
38 33R 450mR 450mR Initiating Cue Which employee(s) are allowed to rebuild the Hoist Box without the Site Vice Presidents approval?
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM RESPOND TO SECURITY EVENT (SRO)
A6 Portions of this JPM are TIME CRITICAL
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM RESPOND TO SECURITY EVENT KA Statement: 2.4.28 Knowledge of procedures relating to security event (non safeguards information)
KA#:
3.2/4.1
References:
O-AOP-72.O1, Response to Security Events EPIP-Ol, Classification of Emergencies EPIP-02, Duties and Responsibilities of the Emergency Coordinator EPIP-08, Off-Site Notifications and Protective Action Recommendations Candidate:
Nan.
Validation Time:
30 minutes Start Time:
Finish Time:
Performance Rating:
Sat Unsat Examiner:
Signature:
Comments NRC ADM JPM A6 Page 2 of 19
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM RESPOND TO SECURITY EVENT Directions to the candidate for Administrative JPMS:
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference needed to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
Initial Conditions Both Units are at 100% power.
Today at current time, you as the Shift Manager, receives a report from Security that armed intruders have entered the area and are near the cafeteria. No shots have been fired at this time.
Initiating Cue You are located in Unit 2.
As the Shift Manager you are to implement 0-AOP-72.01, Response to Security Events NOTE: Portions of this JPM are time critical Portions of this JPM are time critical NRC ADM JPM A6 Page3ofl9
START TIME:
TIME CRITICAL O-AOP-72O1, Response to Security Events START TIME STEP 1 (4.2.2):
VERIFY neither of the following have occurred:
____SAT
- Security Department reports armed intruders are UNSAT within the Protected Area.
- An aircraft has impacted inside the Protected Area.
STANDARD:
DETERMINES from cue armed intruders are within the protected area.
EXAMINERS CUE:
NONE EXAMINERS NOTE: This should be the start time to classify the event START TIME__________
COMMENTS:
STEP 2(4.2.2.2.1): TRIP Unit 1 reactor CRITICAL STEP DIRECTS Unit 1 US to tnp the reactor.
SAT STANDARD:
DIRECTS Unit 1 US to tp the reactor.
UNSAT EXAMINERS CUE:
Unit I reactor is tripped COMMENTS:
NRcADMJPMA6 Page 4of 19
STEP 3 (4.2.2.2.2):
TRIP Unit 2 reactor CRITICAL STEP STANDARD:
DIRECTS Unit 2 US to trip the reactor.
SAT EXAMINERS CUE:
Unit 2 reactor is tripped UNSAT COMMENTS:
STEP 4 (4.2.2.2.3):
DON headset attached to Control Room Security hotline CRITICAL phone.
STEP SAT STANDARD:
DELEGATES to another Licensed Operator to DON headset.
UNSAT EXAMINERS CUE:
Licensed Operator has DONNED headset COMMENTS:
STEP 5 (4.2.3):
IMPLEMENT Security Checklist per EPIP-02, Duties and Responsibilities of the Emergency Coordinator.
SAT STANDARD:
REFERS to EPIP-02, Duties and Responsibilities of the Emergency IJNSAT Coordinator, Security Checklist.
EXAMINERS CUE:
NONE COMMENTS:
NRC ADM JPM A6 Page5ofl9
EPIP-02, Duties and Responsibililies of the Emergency Coordinator.
CRITICAL STEP STEP 6 (5.2):
5.2 Security Checklist for Land-Based Threat SAT D. Land-Based Threat UNSAT 1.
Verify the Control Rooms are implementing 0-AOP-72.01, Response to Security Events.
Uniti Unit2 STANDARD:
IMPLEMENTS EPIP-02 section 5.2 Security Checklist.
CONTACTS Unit 1 and Unit 2 Unit Supervisors and directs, (step 4.2.4 of 0-AOP-72.01) Response to Land Based Threat of 0-AOP-72.01 Response to Security Events, to be implemented.
EXAMINERS CUE:
Unit I and Unit 2 Unit Supervisors acknowledge.
EXAMINERS NOTE: A cue may need to be given that the Control Room crews will perform Attachment I.
COMMENTS:
NRCADMJPMA6 Page 6of 19
EPIP-02, Duties and Responsibilities of the Emergency Coordinator.
CRITICAL STEP STEP 7:
5.2 Security Checklist SAT
- 2. Off-Site Notifications NOTE UNSAT If a threat has been validated via phone call to the NRC Headquarters, the accelerated notification to the NRC is not required.
A. §2 Make an accelerated notification to the NRC (reference EPIP-08).
This is the St. Lucie Plant. My name is _Applicants Name_. My title is _Shift Manager_.
I am providing notification of a Security Event. Brief Description_Armed Intruders in the protected area_. Unit I is in Mode_3_, _O
% Power. Unit 2 is in Mode_3_, _0_%Power. Additional information will be provided as soon as practical.
STANDARD:
COMMUNICATES to the NRC the aboe information EXAMINERS CUE:
NRC has been notified.
COMMENTS:
NRCADMJPMA6 Page 7 of 19
EPIP-02, Duties and Responsibililies of the Emergency Coordinator.
CRITICAL STEP STEP 8 (1):
5.2 Secuty Checklist
- 3. ERO Activation SAT NOTE UNSAT The PSL Conference Bridge can be used to communicate Wth the ERO at an alternate location. Refer to the PSL Emergency Response Directory (ERD) for the phone number and password.
A. Normal business hours
- 1. Delay activation of the Emergency Response Facilities or direct ERO personnel to an alternate Location.
- 2. Request off-site responders to go to EOF / alteniate facility per EPIP-03, Attachment 4.
B. Off-normal hours
- based on site accessibility, consider directing ERO personnel to report to the EOF or alternate location.
STANDARD:
DETERMINES delay or activation of the ERO personnel EXAMINERS CUE:
If asked it is normal business hours EXAMINERS NOTE: Due to the nature of the event the ERO call out will probably be delayed. Activation of the EOF is permissible due to the EOF location is off site. Call outs should be delegated.
COMMENTS:
NRC ADM JPM A6 Page 8of 19
EPIP-02, Duties and Responsibilities of the Emergency Coordinator.
STEP 9 (1):
5.2 Secu thy Checklist:
- 4. For further information, go to the appropriate procedure UNSAT below:
A. 0-AOP-72.01, Response to Security Events B. §3 EDMG-01, Guidelines for Responding to Large Area Fire or Explosion Involving Multiple Fire Zones.
C. SF1 #6310 Threat Assessment and Notifications.
STANDARD:
DETERMINES 0-AOP-72.01 is already being implemented OR call the Unit Supervisors to ensure the AOP is being implemented then continue with EPIP-02.
EXAMINERS CUE:
None or respond as US the AOP is being implemented.
EXAMINERS NOTE: The Shift Manager should NOT get involved with the AOP as he I she is the Emergency Coordinator and attention should be focused on the E-Plan.
The Unit Supervisors should be implementing the Security AOP at each Unit.
COMMENTS:
NRcADMJpMA6 Page 9of 19
EPIP-02, Duties and Responsibililies of the Emergency Coordinator.
STEP 10 (1):
5.2 Security Checklist:
- 5. Implement appropriate Emergency Plan Implementing UNSAT Procedures (EPIPs).
STANDARD:
IMPLEMENTS EPI P-01 Classification of Emergencies EXAMINERS CUE:
NONE COMMENTS:
EPIP-Ol Classification of Emergencies TIME CRITICAL STEP 11(1):
5.3 Classifying the Event:
STEP STANDARD:
IMPLEMENTS EPIP-Ol Classification of Emergencies and DETERMINES classification of SITE AREA EMERGENCY under HS4 HOSTILE ACTION within the PROTECTED AREA UNSAT EXAMINERS CUE:
NONE EXAMINERS NOTE: Applicant should refer to Attachment I and classify the event at this time.
CLASSIFICATION TIME_______________
Must be < 15 minutes from time noted in step I of this JPM. This is also the 15 minute start time to notify the State.
EXAMINERS CUE: None COMMENTS:
NRcADMJPMA6 Page lOof 19
EPIP-08 Off-Site Notifications and Protective Action Recommendations APPENDIX A SAT NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM STEP 12 (1):
If Security Event, Then go to Step 3.A.1.a NRC Notification or N/A.
UNSAT STANDARD:
DETERMINES step is N/Al as the NRC has been previously notified EXAMINERS CUE:
NONE COMMENTS:
EPIP-OB Off-Site Notifications and Protective Action Recommendations APPENDIX A SAT NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM STEP 13 (2):
State Watch Office Notification UNSAT A. Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1).
- 2. All other Security and Non-Security Events
- Prepare the State Notification Form in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
STANDARD:
EXAMINERS CUE:
NONE EXAMINERS NOTE: Per step 5.1.2Al of EPIP-08, lines 1-11 of the notification form shall be completed.
COMMENTS:
NRCADMJPMA6 Page 11 of 19
ATTACHMENT I CRITICAL FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM STEP STEP 14 (Line 1):
SAT 1.
A. [1 THIS IS A DRILL B. LI THIS IS AN EMERGENCY UNSAT STANDARD:
Checks A EXAMINERS CUE:
NONE EXAMINERS NOTE: Per EPIP-08, Attachment IA step I, drill, exercises or tests, each message shall be checked this is a drill COMMENTS:
STEP 15 (Line 2):
CRITICAL STEP 2.
A.
Date:
/
/
B.
- Contact Time:
Reported by: (Name)
D.
Message Number:
Reported from: El Control Room LI TSC El EOF F.
El Initial / New Classification OR El Update Notification SAT STANDARD:
A. Todays Date B. ime contact made left blank at this time UNSAT C. Applicants name D. ssage # I E. Contol Room F. Initial / NewClassiflcation EXAMINERS CUE:
NONE EXAMINERS NOTE: Part B Contact time must be within 15 minutes of the emergency classification time EXAMINERS NOTE: Contact time shall be filled in when contact is made with the state.
COMMENTS:
NRC ADM JPM A6 Page 12 of 19
STEP 16 (Line 3):
CRITICAL STEP 3*
Site:
A. LI Crystal River Unit 3 B. LI St. Lucie Unit 1 C. LI St. Lucie Unit 2 D. LI Turkey Point Unit 3 E. LI Turkey Point Unit 4 SAT STANDARD:
C, St. Lucie Unit 2 (St. Lucie Unit 2 is expected, Unit 1 is acceptable, but not both marked)
UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: EPIP Attachment IA step 3 requires only one affected unit be selected (either one can be selected but not both).
COMMENTS:
STEP 17 (Line 4):
CRITICAL STEP 4*
Emergency Classification:
A.
LI Notification of Unusual Event B.
LI Alert C. LI Site Area Emergency D.
LI General Emergency SAT STANDARD:
C, Site Area Emergency UNSAT EXAMINERS CUE:
NONE COMMENTS:
NRC ADM JPM A6 Page 13 of 19
STEP 18 (Line 5):
CRITICAL STEP 5*
A. El Emergency Declaration: B.Ej Emergency Termination:
Date:
I I
Time:
SAT STANDARD:
A, Emergency Declaration time and date.
UNSAT EXAMINERS CUE:
NONE EXAMINERS NOTE:
This is the time emergency declaration is made. (Step 11 of this JPM)
COMMENTS:
STEP 19 (Line 6):
CRITICAL STEP 6.*
Reason for Emergency Declaration:
A. El EAL Number B. El
Description:
SAT STANDARD:
A. EAL Number HS4, Hostile Action UNSAT EXAMINERS CUE:
NONE COMMENTS:
NRC ADM JPM A6 Page 14 of 19
STEP 20 (Line 7):
CRITICAL STEP 7.
Additional lnformafion or Urdate: A. LI None OR B. Li
Description:
SAT STANDARD:
B. ADD additional information armed intruders in the protected area Unit 1 and Unit 2 are affected.
UNSAT EXAMINERS CUE:
NONE EXAMINERS NOTE: If both Units affected, should state in the additional information section.
COMMENTS:
STEP 21 (Line 8):
CRITICAL STEP 8.*
Weather Data:
A. Wind direction from degrees B. Downwind Sectors Affected:
SAT STANDARD:
DETERMINES sectors affected MNP (step 8G, Page 45 of EPIP-08)
UNSAT EXAMINERS CUE:
Wind Direction from 94° EXAMINERS NOTE:
Applicant should determine sectors affected MNP (step 8G, PagE.
45 of EPIP-08)
COMMENTS:
NRCADMJPMA6 Page 15 of 19
STEP 22 (Line 9):
CRITICAL STEP 9*
Release Status: A LI None (Go to Item 11) B. LI In progress C. LI Has occurred, but stopped (Go to Item 11)
SAT STANDARD:
NONE (Go to item 11)
UNSAT EXAMINERS CUE:
NONE COMMENTS:
STEP 23 (Line 11):
CRITICAL STEP 11.*
UTILITY PROTECTIVE ACTION RECOMMENDATIONS FOR THE PUBLIC:
A. LI No utility recommended actions at this time.
Ifform is completed in the Control Room, go to Item 15 SAT UNSAT STANDARD:
A. No utility protective action recommendations for the public. Goes to item 15 EXAMINERS CUE:
NONE COMMENTS:
NRCADMJPMA6 Page 16 of 19
STEP 24 (Line 15):
Emergency Coordinator (EC) approval.
CRITICAL STEP 15.(Do Not Read) EC or RM Approval Signature:
/
/
Time:
STANDARD:
Documents approval including date and time.
SAT EXAMINERS CUE:
NONE UNSAT COMMENTS:
STEP 25 ( 2.C): Using the State HOT RINGDOWN PHONE, dial 100 CRITICAL STEP
____SAT STANDARD:
Dials 100 on the State HOT RINGDOWN PHONE.
EXAMINERS CUE:
100 has been dialed.
UNSAT COMMENTS:
NRC ADM JPM A6 Page l7of 19
STEP 26 (.2.D):
TIME Hold down the button on the handset while talking. This must be CRITICAL done each time you talk. Release the button in order to listen.
STEP When the State Duty Officer answers, announce:
This is St. Lucie Nuclear Plant [as applicable (Unit 1, 2)] with an SAT emergency message. Contact Time is I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy.
UNSAT Allow the Duty Officer to contact St. Lucie County, Martin County and the Bureau of Radiation Control prior to transmitting the information from the notification form. When the parties are on line, provide the information slowly (e.g., in three word intervals) and deliberately, providing time for the information to be written down.
On-line Verification:
El SWP/DEM LI DOH/BRC
[1 St. Lucie County/Ft. Pierce [] Martin County STANDARD:
VERIFIES the above are on line. Communicates message. States the contact time as the current time.
EXAMINERS CUE:
Answer as the State Watch Office. The above agencies are on line.
EXAMINERS NOTE:
Contact time above is Stop time for time critical step. This time must be less than 15 minutes from the time listed in step 11.
EXAMINERS NOTE:
Applicant should go back to step 2 of this form and fill in Contact Time.
EXAMINERS NOTE:
Upon completion of communication, terminate the task.
Time classified event (step 11)
Time contact made to state__________
COMMENTS:
END OFTASK STOP TIME__________
NRC ADM JPM A6 Page 18 of 19
CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
Directions to the candidate for Administrative JPMS:
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference needed to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
Initial Conditions Both Units are at 100% power.
Today at current time, you as the Shift Manager, receives a report from Security that armed intruders have entered the area and are near the cafeteria. No shots have been fired at this time.
Initiating Cue You are located in Unit 2.
As the Shift Manager you are to implement 0-AOP-72.01, Response to Security Events NOTE: Portions of this JPM are time critical