ML11153A156

From kanterella
Jump to navigation Jump to search
Ltr. 06/01/2011 Perry Re Confirmation of Initial Operator License Examinations
ML11153A156
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/01/2011
From: Hironori Peterson
Operations Branch III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML11153A156 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

PERRY NUCLEAR POWER PLANT

Dear Mr. Bezilla:

In response to your letters dated July 8, 2010 (L-10-210), and July 22, 2010 (L-10-218) you requested dates for initial operator licensing examinations in 2013 and 2015. You also requested we cancel the initial operator license exam scheduled for January 9, 2012.

In response, we have scheduled an examination for the weeks of February 18 and 25, 2013, with an onsite validation date of January 28, 2013. This is a change from our letter to you dated July 30, 2010. Additionally, we have scheduled an examination for the weeks of February 9 and 16, 2015, with an onsite validation date of January 12, 2015. We have also canceled the initial operator license examination scheduled for January 9, 2012.

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document

M. Bezilla Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc:

Distribution via ListServ

M. Bezilla Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc:

Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrPMPerry RidsNrrDorlLpI3-2 RidsNrrDirsIrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\OL Exam Confirmation Letters\\PER 060111 DRS OL Exam Confirmation.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RKWalton:co HPeterson DM for DATE 05/13/2011 06/01/2011 OFFICIAL RECORD COPY