Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval
ML111310192
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/11/2011
From: Jesse M
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
TAC ME4519, TAC ME4521, TMI-11-084
Download: ML111310192 (4)


Text

10 CFR 50.55a TMI*11*084 May 11,2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555*0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR*50 NRC Docket No. 50*289

Subject:

Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection (lSI) Interval

References:

1)

Letter from P. B. Cowan (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Submittal of Relief Requests Associated with the Fourth Inservice Inspection (lSI) Interval," dated August 10, 2010 2)

Letter from P. Bamford (U.S. Nuclear Regulatory Commission) to M. J. Pacilio (Exelon Generation Company, LLC), "Three Mile Island Nuclear Station, Unit 1

  • Supplemental Information Needed for Acceptance of Requested Licensing Action RE: Request for Relief 14R*02, Fourth Inservice Inspection Interval, Alternate Risk Informed Selection and Examination Criteria for Pressure Retaining Welds (TAC No. ME4519),"

dated September 23, 2010 3)

Letter from P. B. Cowan (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Supplemental Information Request - Fourth Inservice Inspection (lSI) Interval Relief Request 14R-02," dated October 8, 2010

4) Letter from P. Bamford (U.S. Nuclear Regulatory Commission) to M. J. Pacilio (Exelon Generation Company, LLC), "Three Mile Island Nuclear Station, Unit 1 - Request for Additional Information Regarding Fourth Inservice Inspection Interval Relief Requests 14R-02 and 14R-04 (TAC Nos.

ME4519 and ME4521)," dated December 20,2010 5)

Letter from D. P. Helker (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection (lSI) Interval," dated January 25, 2011

Response to Request for Additional Information Conceming Relief Requests Associated with the Fourth Inservice Inspection (lSI) Interval May 11,2011 Page 2 6)

Letter from P. Bamford (U.S. Nuclear Regulatory Commission) to M. J.

Pacilio (Exelon Generation Company, LLC), "Three Mile Island Nuclear Station, Unit 1 - Request for Additional Information Regarding Fourth Inservice Inspection Interval Relief Request 14R-04 (TAC No. ME4521),"

dated May 6,2011 In the Reference 1 letter, Exelon Generation Company, LLC (Exelon) submitted relief requests associated with the fourth Inservice Inspection (lSI) interval for Three Mile Island Nuclear Station (TMI), Unit 1. The fourth interval of the TMI, Unit 1 lSI program complies with the 2004 Edition, No Addenda, of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code. The fourth lSI interval began on April 20, 2011. Additional correspondence concerning this issue is identified in References 2 through 5.

In the Reference 6 letter, the U.S. Nuclear Regulatory Commission requested further information. Attached is our response.

There are no regulatory commitments in this letter.

If you have any questions concerning this letter, please contact Tom Loomis at (610) 765-5510.

Respectfully, ichael D. Jesse Director - Licens' egulatory Affairs Exelon Generation Company, LLC

Attachment:

Response to Request for Additional Information - Relief Requests Associated with the Fourth Ten-Year Interval for Three Mile Island Nuclear Station, Unit 1 cc:

Regional Administrator, Region I, USNRC D. M. Kern, USNRC Senior Resident Inspector, TMI P. J. Bamford, Project Manager [TMI] USNRC

ATTACHMENT Response to Request for Additional Information - Relief Requests Associated with the Fourth Ten-Year Interval for Three Mile Island Nuclear Station, Unit 1

Response to Request for Additional Information Conceming Relief Requests Associated with the Fourth Inservice Inspection (lSI) Interval May 11, 2011 Page 1 of 1 Question:

"Reguested Information Regarding Relief Reguest 14R-04 TMI-1 Technical Specification 4.17.1 (f)(2) states, "Snubber release rate (bleed) is achieved in both tension and compression, within the specified range."

The American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, Part 4 (OM-4), Section 3.2.1.1 (c) states, "release rate, where applicable, is within the specified range in tension and compression. For units specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be demonstrated."

Does TMI-1 have any snubbers that are required not to displace under continuous load? If so, how is Exelon meeting the second sentence in OM-4 Section 3.2.1.1 (c)?"

Response

Three Mile Island Nuclear Station, Unit 1 does not have any snubbers that are required to meet the second sentence of OM-4, Section 3.2.1.1 (c) (I.e., there are no snubbers that are required to not displace under continuous load).