Notification of Inspection (NRC Inspection Report 05000483/2011005) and Request for Information
ML111290797
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/05/2011
From: Mark Haire
Operations Branch IV
To: Heflin A
Union Electric Co
References
IR-11-005
Download: ML111290797 (6)


See also: IR 05000483/2011005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

May 5, 2011

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT - NOTIFICATION OF INSPECTION (NRC INSPECTION

REPORT 05000483/2011005) AND REQUEST FOR INFORMATION

Dear Mr. Heflin:

From June 20 to 24, 2011, operations engineers from the Nuclear Regulatory

Commissions (NRC) Region IV office will be onsite as part of performing the baseline biennial

requalification inspection at the Callaway Plant, using NRC Inspection Procedure 71111.11B,

Licensed Operator Requalification Program. Experience has shown that this inspection is a

resource intensive inspection both for the NRC examiners and your staff. In order to minimize

the impact to your onsite resources and to ensure a productive inspection, we have enclosed a

request for documents needed for this inspection. These documents have been divided into two

groups. The first group (Section A of the enclosure) identified information to be provided prior to

the inspection to ensure that the examiners are adequately prepared. The second group

(Section B of the enclosure) identifies the information the examiners will need upon arrival at the

site. It is important that all of these documents are up to date and complete in order to minimize

the number of additional documents requested during the preparation and/or the onsite portions

of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Scott Maglio of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact the lead examiner Mr. Sean Hedger at (817) 276-6556

(Sean.Hedger@nrc.gov) or Mr. Gabriel Apger at (817) 276-6508 (Gabriel.Apger@nrc.gov).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Union Electric Company

- 2 -

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Enclosure:

Biennial Requalification Inspection Document Request

cc w/Enclosure: Distribution via ListServe

Union Electric Company

- 3 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Senior Resident Inspector (David.Dumbacher@nrc.gov)

Resident Inspector (Jeremy.Groom@nrc.gov)

Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Greg.Tutak@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Mohan.Thadani@nrc.gov)

Branch Chief, DRS/OB (Mark.Haire@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\\

ADAMS ML

ADAMS: No 6 Yes

6 SUNSI Review Complete

Reviewer Initials: SDH

6 Publicly Available

6 Non-Sensitive

.

Non-publicly Available

Sensitive

OE:OB

C:OB

SHedger

MHaire

/RA/

/RA/

5/3/3011

5/5/2011

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

From: Mr. Sean Hedger

Operations Engineer, NRC RIV

817-276-6556

To:

Mr. David Lantz

Assistant Manager, Operations Training, Callaway Plant

573-676-8512

Subj: Information Request to Support June 13 - August 31, 2011, Licensed Operator

Requalification Program Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i. e., 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than June 10, 2011.

Electronically: Via IMS Certrec or email (to Sean.Hedger@nrc.gov and

Gabriel.Apger@nrc.gov)

Hardcopy to: US Nuclear Regulatory Commission, Region IV

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011

ATTN: Sean D. Hedger

02.03: Facility Operating History

List of condition reports related to operator errors and training issues initiated since

last biennial requalification program inspection

Copies of the following condition reports by identification number or subject

-

CAR documents 201101783, 201101788, 201101255, 201101283, 201010484,

200908596, 201004301

-

Condition report(s) generated as a result of observed generic operator issues

identified in the 2009 initial operator licensing exam (NRC Exam Report

05000483/2009301)

-

Condition report(s) generated as a result of Corrective Action to Prevent

Recurrence (CAPTR)-2 from the supporting Causal Analysis for Licensee Event

Report (LER) 2009004

02.04: Licensee Requalification Exams / 02.09: Written Exam and Operating Test Results

Current requalification cycle written examinations (SRO & RO) and results to date

Current requalification cycle operating tests (SRO & RO) and results through June 3,

2011.

Current requalification cycle examination methodology (sample plan)

Documentation showing how the content of the written and operating exams each

week do not exceed exam overlap expectations

All portions of the UFSAR that identify operator response times

- 2 -

Enclosure

02.05: Licensee Practices in Administering Requalification Exams

Schedule of operating tests (JPMs & scenarios) for week of June 20, 2011

Operating tests (JPMs & scenarios) (password protected and provide separately via

telephone at later date) to be given week of June 20, 2011

List of licensed operators (SRO & RO) by crew (operating & staff)

Training and Operations Department organization charts (with qualified LOR

evaluators identified)

All procedures that describe conduct of simulator training

All Procedures used to test, operate, and maintain the simulator

All Procedures that describe examination security, including guidelines on overlap

between examinations in current exam cycle tests and prior year examinations

List of all examination security problems since last NRC biennial licensed operator

requalification program inspection

02.06: Licensee Feedback System

Procedures that identify process for revising and maintaining licensed operator

continuing training program up to date

List of outstanding licensed operator requalification (LOR) program changes

List of plant events and industry operating experience incorporated into LOR

program since last NRC biennial requalification program inspection

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

02.07: Licensees Remedial Training Program

List of remedial training conducted or planned since last biennial requalification

written exam (includes training provided to operators to enable passing

requalification exams and training provided to correct generic or individual

weaknesses observed during previous requalification exam cycle)

Remediation plans (lesson plans, reference materials, and attendance

documentation)

02.08: Conformance with Operator License Conditions

All Procedures and Program documentation for maintaining active operator licenses

and ensuring medical fitness of licensed operators

All Procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last NRC biennial licensed

operator requalification program inspection

- 3 -

Enclosure

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on June 20, 2011.

02.04: Licensee Requalification Exams / 02.09: Written Exam and Operating Test Results

All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week

02.08: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews)

Access to licensed operators training attendance records

Access to licensed operators medical records

02.11: Conformance with Simulator Requirements Specified in 10 CFR 55.46

Simulator discrepancies (DRs) from June 30, 2009 to June 1, 2011. This should

include all open DRs and DRs that have been closed, including the

documentation/justification for closure.

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

All current model deficiencies, including FSAR vs Design differences in the simulator

(any documentation on this)

Summary list of modifications from June 30, 2009 to June 1, 2011.

Plant Modifications (both hardware and software) completed on the Simulator by due

date from June 30, 2009 to June 1, 2011.

Simulator Differences Lesson plan used in training (current to June 20, 2011).

The complete book of all Simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include the

test procedures for each test, the acceptance criteria, and results. For each transient

test, the reference chart should be included or an equivalent subject matter expert

review versus the simulator results with a write-up for any differences beyond the

ANSI standard requirements.

All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the Plant physics data book (electronic or other

means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

All Simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

All Simulator Management and Configuration Procedures.

Simulator security procedure(s)

Current copy of ANSI 3.5 standard you are committed to for Simulator testing.