May 5, 2011
Mr. Adam C. Heflin, Senior Vice
President and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT - NOTIFICATION OF INSPECTION (NRC INSPECTION
REPORT 05000483/2011005) AND REQUEST FOR INFORMATION
Dear Mr. Heflin:
From June 20 to 24, 2011, operations engineers from the Nuclear Regulatory
Commissions (NRC) Region IV office will be onsite as part of performing the baseline biennial
requalification inspection at the Callaway Plant, using NRC Inspection Procedure 71111.11B,
Licensed Operator Requalification Program. Experience has shown that this inspection is a
resource intensive inspection both for the NRC examiners and your staff. In order to minimize
the impact to your onsite resources and to ensure a productive inspection, we have enclosed a
request for documents needed for this inspection. These documents have been divided into two
groups. The first group (Section A of the enclosure) identified information to be provided prior to
the inspection to ensure that the examiners are adequately prepared. The second group
(Section B of the enclosure) identifies the information the examiners will need upon arrival at the
site. It is important that all of these documents are up to date and complete in order to minimize
the number of additional documents requested during the preparation and/or the onsite portions
of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Scott Maglio of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
examination activities. If there are any questions about this inspection or the material
requested, please contact the lead examiner Mr. Sean Hedger at (817) 276-6556
(Sean.Hedger@nrc.gov) or Mr. Gabriel Apger at (817) 276-6508 (Gabriel.Apger@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
Union Electric Company
- 2 -
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark S. Haire, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-483
License: NPF-30
Enclosure:
Biennial Requalification Inspection Document Request
cc w/Enclosure: Distribution via ListServe
Union Electric Company
- 3 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
Senior Resident Inspector (David.Dumbacher@nrc.gov)
Resident Inspector (Jeremy.Groom@nrc.gov)
Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Project Engineer, DRP/B (Greg.Tutak@nrc.gov)
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Mohan.Thadani@nrc.gov)
Branch Chief, DRS/OB (Mark.Haire@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\\
ADAMS: No 6 Yes
6 SUNSI Review Complete
Reviewer Initials: SDH
6 Publicly Available
6 Non-Sensitive
.
Non-publicly Available
Sensitive
OE:OB
C:OB
SHedger
MHaire
/RA/
/RA/
5/3/3011
5/5/2011
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
- 1 -
Enclosure
BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
From: Mr. Sean Hedger
Operations Engineer, NRC RIV
817-276-6556
To:
Mr. David Lantz
Assistant Manager, Operations Training, Callaway Plant
573-676-8512
Subj: Information Request to Support June 13 - August 31, 2011, Licensed Operator
Requalification Program Inspection (IP 71111.11B)
A. The following information is requested in order to support inspection preparation
activities. These items are listed by section as they appear in the inspection module
(i. e., 2.02, 2.04, etc). Requested materials should be sent either electronically or
hardcopy in order to arrive at the Region IV office no later than June 10, 2011.
Electronically: Via IMS Certrec or email (to Sean.Hedger@nrc.gov and
Gabriel.Apger@nrc.gov)
Hardcopy to: US Nuclear Regulatory Commission, Region IV
612 E. Lamar Blvd, Suite 400
Arlington, TX 76011
ATTN: Sean D. Hedger
02.03: Facility Operating History
List of condition reports related to operator errors and training issues initiated since
last biennial requalification program inspection
Copies of the following condition reports by identification number or subject
-
CAR documents 201101783, 201101788, 201101255, 201101283, 201010484,
200908596, 201004301
-
Condition report(s) generated as a result of observed generic operator issues
identified in the 2009 initial operator licensing exam (NRC Exam Report
-
Condition report(s) generated as a result of Corrective Action to Prevent
Recurrence (CAPTR)-2 from the supporting Causal Analysis for Licensee Event
Report (LER) 2009004
02.04: Licensee Requalification Exams / 02.09: Written Exam and Operating Test Results
Current requalification cycle written examinations (SRO & RO) and results to date
Current requalification cycle operating tests (SRO & RO) and results through June 3,
2011.
Current requalification cycle examination methodology (sample plan)
Documentation showing how the content of the written and operating exams each
week do not exceed exam overlap expectations
All portions of the UFSAR that identify operator response times
- 2 -
Enclosure
02.05: Licensee Practices in Administering Requalification Exams
Schedule of operating tests (JPMs & scenarios) for week of June 20, 2011
Operating tests (JPMs & scenarios) (password protected and provide separately via
telephone at later date) to be given week of June 20, 2011
List of licensed operators (SRO & RO) by crew (operating & staff)
Training and Operations Department organization charts (with qualified LOR
evaluators identified)
All procedures that describe conduct of simulator training
All Procedures used to test, operate, and maintain the simulator
All Procedures that describe examination security, including guidelines on overlap
between examinations in current exam cycle tests and prior year examinations
List of all examination security problems since last NRC biennial licensed operator
requalification program inspection
02.06: Licensee Feedback System
Procedures that identify process for revising and maintaining licensed operator
continuing training program up to date
List of outstanding licensed operator requalification (LOR) program changes
List of plant events and industry operating experience incorporated into LOR
program since last NRC biennial requalification program inspection
Audits and/or self-assessment reports addressing the licensed operator
requalification training program
02.07: Licensees Remedial Training Program
List of remedial training conducted or planned since last biennial requalification
written exam (includes training provided to operators to enable passing
requalification exams and training provided to correct generic or individual
weaknesses observed during previous requalification exam cycle)
Remediation plans (lesson plans, reference materials, and attendance
documentation)
02.08: Conformance with Operator License Conditions
All Procedures and Program documentation for maintaining active operator licenses
and ensuring medical fitness of licensed operators
All Procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last NRC biennial licensed
operator requalification program inspection
- 3 -
Enclosure
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on June 20, 2011.
02.04: Licensee Requalification Exams / 02.09: Written Exam and Operating Test Results
All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after
onsite week
02.08: Conformance with Operator License Conditions
Access to licensed operators records (operating and staff crews)
Access to licensed operators training attendance records
Access to licensed operators medical records
02.11: Conformance with Simulator Requirements Specified in 10 CFR 55.46
Simulator discrepancies (DRs) from June 30, 2009 to June 1, 2011. This should
include all open DRs and DRs that have been closed, including the
documentation/justification for closure.
Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available).
Documentation that validates current models, including the thermal-hydraulics and
neutronics models, to the actual plant.
All current model deficiencies, including FSAR vs Design differences in the simulator
(any documentation on this)
Summary list of modifications from June 30, 2009 to June 1, 2011.
Plant Modifications (both hardware and software) completed on the Simulator by due
date from June 30, 2009 to June 1, 2011.
Simulator Differences Lesson plan used in training (current to June 20, 2011).
The complete book of all Simulator annual performance test packages (usually in a
single book, but may be electronic or in single test packages), complete with all
transient tests, steady state tests, and malfunction tests. This should also include the
test procedures for each test, the acceptance criteria, and results. For each transient
test, the reference chart should be included or an equivalent subject matter expert
review versus the simulator results with a write-up for any differences beyond the
ANSI standard requirements.
All test packages used to verify core physics parameters (such as MTC, IRW). The
applicable reference graphs from the Plant physics data book (electronic or other
means as available) should also be included as well as the test procedures used and
the acceptance criteria with results.
All Simulator test, configuration management, and related documents available in the
room for inspectors to review. This includes training needs analysis packages,
simulator review committee meeting minutes, etc.
All Simulator Management and Configuration Procedures.
Simulator security procedure(s)
Current copy of ANSI 3.5 standard you are committed to for Simulator testing.