UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 9, 2011 Mr. J. R. Morris Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER FOR CATAWBA NUCLEAR STATION UNIT 1
Dear Mr. Morris:
As a result of its quarterly review of plant performance, which was completed on April 30, 2011, the NRC updated its assessment of Catawba Nuclear Station Unit 1. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and our plans for a future inspection at your facility. This letter supplements, but does not supersede, the annual assessment letter issued on March 4, 2011.
The NRCs review of Catawba Unit 1 identified that the Mitigating Systems Performance Index (MSPI), Cooling Water Systems Performance Indicator has crossed the Green-to-White threshold. This was based on the unreliability and unavailability due to a breaker failure on the 1B1 component cooling water pump which occurred in March 2011. The breaker was subsequently replaced.
The NRC determined the performance at Catawba Unit 1 to be in the Regulatory Response Column of the Reactor Oversight Process Action Matrix in the first quarter of 2011. As a result of the Regulatory Response performance, a supplemental inspection will be performed in accordance with Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. The objectives of this supplemental inspection are to provide assurance that the root causes and contributing causes of risk-significant performance issues are understood, provide assurance that the extent of condition and extent of cause of risk-significant performance issues are identified, and provide assurance that your corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence. We will not schedule the supplemental inspection until you notify us of your readiness for the inspection.
DEC 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Jonathan Bartley at 404-997-4607 with any questions you have regarding this letter.
Sincerely,
/RA/
Richard P. Croteau, Director Division of Reactor Projects Docket No.:
50-413 License No.: NPF-35 cc: (See page 3)
____ML111290771_____
G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE NAME JBartley BWilliams RCroteau DATE 05/05/2011 05/09/2011 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
DEC 3
cc:
Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 Randy D. Hart Regulatory Compliance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Duke Energy Carolinas, LLC Electronic Mail Distribution C. Jeff Thomas Fleet Regulatory Compliance & Licensing Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 Lara Nichols Associate General Counsel Duke Energy Corporation Electronic Mail Distribution David A. Repka Winston Strawn LLP Electronic Mail Distribution North Carolina MPA-1 Suite 600 P.O. Box 29513 Raleigh, NC 27525-0513 Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Mark Yeager Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Vanessa Quinn Federal Emergency Management Agency Radiological Emergency Preparedness Program 1800 S. Bell Street Arlington, VA 20598-3025 Steve Weatherman, Operations Analyst North Carolina Electric Membership Corporation Electronic Mail Distribution County Manager of York County York County Courthouse P. O. Box 66 York, SC 29745-0066 Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602 David A. Baxter Vice President, Nuclear Engineering Duke Energy Carolinas, LLC Electronic Mail Distribution Piedmont Municipal Power Agency Electronic Mail Distribution
DEC 4
Letter to J. R. Morris from Richard P. Croteau dated May 9, 2011
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER FOR CATAWBA NUCLEAR STATION UNIT Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource