OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
transmittal document is decontrolled.
OFFICIAL USE ONLY SECURITY-RELATED INFORMATION
May 6, 2011
David J. Bannister, Vice President
and Chief Nuclear Officer
Omaha Public Power District
9610 Power Lane
Blair, NE 68008
SUBJECT:
NRC INSPECTION REPORT 05000285/2011007 - ATTACHMENTS
Dear Mr. Bannister:
On May 5, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued the subject inspection
report. As stated in that report, the seven supplements referred to in the preliminary risk
assessment were withheld from public disclosure in accordance with Section 2.390(d) of Title 10
of the Code of Federal Regulations (10 CFR 2.390). These attachments are enclosed.
Should you have any questions regarding these attach supplements or their relationship to the
subject inspection report, please contact me at (817) 860-8161.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system, ADAMS.
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). However, because of the security-related concerns
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
your response, if any. This practice will ensure that your response will not be made available
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Omaha Public Power District
- 2 -
OFFICIAL USE ONLY SECURITY-RELATED INFORMATION
electronically for public inspection in the NRC Public Document Room or from the NRCs
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow
the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
David P. Loveless
Senior Reactor Analyst
Division of Reactor Safety
Docket: 50-285
License: DPR-40
Nonpublic Enclosure:
Supplement 1 - 7 to NRC Inspection Report 05000285/2011007
cc w/enclosure:
Jeffrey A. Reinhart
Site Vice President
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
Mr. Thomas C. Matthews
Manager - Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Omaha Public Power District
- 3 -
OFFICIAL USE ONLY SECURITY-RELATED INFORMATION
Distribution w/enclosure:
Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch
Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M
Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43
Branch Chief, RI DRS (James.Trapp@nrc.gov)
Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)
Branch Chief, RIII DRS/PSB (Eric.Duncan@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
Project Engineer (Jim.Melfi@nrc.gov)
Project Engineer (Chris.Smith@nrc.gov)
FCS Administrative Assistant (Berni.Madison@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
Security Related Complete Report - OUO:
SUNSI Review Completed: DPL
ADAMS: Yes
Initials: DPL
- Non-Publicly Available : Sensitive-Security- Related-Periodic Review Required
Letter Only:
SUNSI Review Completed: DPL
ADAMS: : Yes
Initials: DPL
- Publicly Available
- Non-Sensitive
SRA:DRS
SRI:DRP
RI:DRP
C:DRP/PBE
DPLoveless
JCKirkland
JFWingebach
JAClark
/RA/
/RA/
/RA/
/RA/
5/05/11
5/05/11
5/05/11
5/05/11
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax