ML11122A035
| ML11122A035 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 04/26/2011 |
| From: | Caves J Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RNP-RA/11-0028 | |
| Download: ML11122A035 (1) | |
Text
~i Progress Energy Serial: RNP-RA/1 1-0028 APR 26 2011' United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 2010 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT SUPPLEMENT - ODCM Ladies and Gentlemen:
Enclosed is a copy of the Off-Site Dose Calculation Manual (ODCM), which includes changes made during the period of January 1, 2010, through December 31, 2010, for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. This report is submitted in accordance with HBRSEP, Unit No. 2, Technical Specifications (TS) Section 5.5.1.c.3. This is a supplement to the 2010 Annual Radioactive Effluent Release Report, which is provided in a separate letter and includes a description of the ODCM changes made during 2010.
If you have any questions concerning this information, please contact me at 843-857-1626.
Sincerely, yaves Supervisor - Licensing/Regulatory Programs RAC/rac Enclosure c:
V. M. McCree, NRC, Region II B. Mozafari, NRC Project Manager, NRR (w/o Enclosure)
NRC Resident Inspector (w/o Enclosure)
Progress Energy Carolinas, Inc.
Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550