Transmittal of Annual Radioactive Effluent Release Report - 2010
ML11119A232
Person / Time
Site: San Onofre  
Issue date: 04/26/2011
From: St-Onge R
Southern California Edison Co
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
Download: ML11119A232 (2)


Text

-A.VI SOUTHERN CALIFORNIA Richard 1. St. Onge EDISON Director Nuclear Regulatory Affairs An EDISON INTERNATIONAL0 Company 10 CFR 50.36(a)

April 26, 2011 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361 and 50-362 Annual Radioactive Effluent Release Report - 2010 San Onofre Nuclear Generating Station, Units 1, 2, and 3

Dear Sir or Madam:

In accordance with 10 CFR 50.36(a), Unit 1 Permanently Defueled Technical Specification (TS) Section D6.9.1.4, and Units 2 and 3 TS Section 5.7.1.3, Southern California Edison (SCE) is providing the Annual Radioactive Effluent Release Report-2010 (ARERR) for San Onofre Nuclear Generating Station, Units 1, 2, and 3.

The period of the report is January 1, 2010 through December 31, 2010.

Unit 1 Permanently Defueled TS Section D6.14.2.3 and Units 2 and 3 TS Section 5.5.2.1.1(c) require revisions made to the Offsite Dose Calculation Manual (ODCM) for this reporting period to be submitted with the ARERR.

On February 26, 2010, S0123-ODCM, Revision 3 was issued and on April 23, 2010, Revision 4 was issued, and both are included with this submittal. To comply with Technical Specification 5.5.2.1.1, change bars are included on all affected pages.

If you require additional information, please contact Mr. Ryan I. Treadway at (949) 368-9985.

Sincerely, ADc?

P.O. Box 128 San Clemente, CA 92674

Document Control Desk April 26, 2011 : Annual Radioactive Effluent Release Report - 2010 : ODCM, S0123-ODCM, Revision 3 : ODCM, S0123-ODCM, Revision 4 cc:

E. E. Collins, NRC Regional Administrator, Region IV J. E. Whitten, NRC Region IV, Nuclear Material Safety Branch Chief R. Hall, NRC Project Manager, SONGS Units 2 and 3 J. C. Shepherd, NRC Project Manager, SONGS Unit 1 G. G. Warnick, NRC Senior Resident Inspector, SONGS Units 2 and 3 S. Y. Hsu, California Department of Public Health