Withdrawal of an Amendment Request
ML111170512
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/28/2011
From: John Hughey
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Hughey J, NRR/DORL, 301-415-3204
References
TAC ME3598, TAC ME3599
Download: ML111170512 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Apr; 1 28, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. ME3598 AND ME3599)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission dated March 24, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100840752), Exelon Generation Company, LLC (Exelon), submitted a request to revise the technical specifications (TS) for the Peach Bottom Atomic Power Station, (PBAPS) Units 2 and 3, Facility Operating License Nos.

DPR-44 and DPR-56. Exelon supplemented the amendment request on July 23, 2010, and January 20, 2011 (ADAMS Accession Nos. ML102070161 and ML110210086, respectively).

The proposed amendment would have revised TS Section 3.1.7, "Standby Liquid Control (SLC)

System," to extend the completion time from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for specific conditions where two SLC subsystems are inoperable.

By letter dated April 26, 2011 (ADAMS Accession No. ML111180060), Exelon withdrew the amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

All activities associated with TAC Nos. ME3598 and ME3599 are complete and these TACs will be closed.

7Rf)~~

John D. Hughey, Project Manager Plant Licensing Branch LPL 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv

7590-01-P NUCLEAR REGULATORY COMMISSION EXELON GENERATION COMPANY, LLC PSEG NUCLEAR. LLC PEACH BOTTOM ATOMIC POWER STATION. UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278

[NRC-2011-xxxl NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (NRC or the Commission) has granted the request of Exelon Generation Company, LLC, (Exelon) and PSEG Nuclear, LLC, to withdraw its application dated March 24, 2010, as supplemented by letters dated July 23, 2010, and January 20, 2011, for proposed amendment to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located in York and Lancaster Counties, Pennsylvania.

The proposed amendment would have revised technical specification Section 3.1.7, "Standby Liquid Control (SLC) System," to extend the completion time from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for specific conditions where two SLC subsystems are inoperable.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on December 14, 2010 (75 FR 77913).

However, by letter dated April 26, 2011, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated March 24,2010, as supplemented by letters dated July 23, 2010, and January 20, 2011, and the licensee's letter dated April 26, 2011, which withdrew the application for license amendment.

Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room

- 2 (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html.

Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1 800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov, Dated at Rockville, Maryland, this 28 th day of April 2011.

FOR THE NUCLEAR REGULATORY COMMISSION U2 U*/\\ ~)

17 // II I/;

, c{..--;...ee

/~

V'"

, 7/

/

tf/

John D. Hughey, Project Manager Plant Licensing Branch LPL 1-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation

April 28, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. ME3598 AND ME3599)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission dated March 24, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100840752), Exelon Generation Company, LLC (Exelon), submitted a request to revise the technical specifications (TS) for the Peach Bottom Atomic Power Station, (PBAPS) Units 2 and 3, Facility Operating License Nos.

DPR-44 and DPR-56. Exelon supplemented the amendment request on July 23, 2010, and January 20,2011 (ADAMS Accession Nos. ML102070161 and ML110210086, respectively).

The proposed amendment would have revised TS Section 3.1.7, "Standby Liquid Control (SLC)

System," to extend the completion time from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for specific conditions where two SLC subsystems are inoperable.

By letter dated April 26, 2011 (ADAMS Accession No. ML111180060), Exelon withdrew the amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

All activities associated with TAC Nos. ME3598 and ME3599 are complete and these TACs will be closed.

Sincerely,

/raj John D. Hughey, Project Manager Plant Licensing Branch LPL 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL 1-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resource RidsNrrLAABaxter Resource RidsOgcRp Resource RidsNrrPMJHughey Resource RidsRgnlMailCenter Resource ADAMS Accession Nos: Letter/ML111170512; Notice/ML111170518

  • via e-mail OFFICE NRR/LPL 1-2/PM NRR/LPL 1-2/LA NRR/LPL1-2/BC NRR/LPL 1-2/PM NAME JHughey HChernoff JHughey 04128/2011 04128/2011 04/28/2011 OFFICIAL AGENCY RECORD