Text
St Lucie Nuclear Plant St. Lucie Nuclear Plant Annual Assessment Meeting Annual Assessment Meeting 2010 Reactor Oversight Process 2010 Reactor Oversight Process April 13, 2011 p
Meeting Agenda Meeting Agenda
- Introduction
- Review of Reactor Oversight Process
- National Summary of Plant Performance y
- Discussion of St. Lucie Plant Performance
- Questions and Answers
Our Mission T
li d
l t To license and regulate our Nations civilian use of nuclear materials in order to protect public health and safety, promote the common defense and security and defense and security, and protect the environment.
Reactor Oversight Process
- The NRC program to inspect, measure, and assess the safety performance of commercial nuclear p
power plants and to respond to any decline in performance decline in performance.
Reactor Oversight Process Safety Strategic Performance Areas Safety Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator R
lt Safety Cornerstones Baseline Inspection Performance Indicator R
lt Baseline Inspection Results Significance Significance Results Baseline Inspection Results Significance Significance Results Significance Threshold Action Matrix g
Threshold Significance Threshold Action Matrix g
Threshold Action Matrix Action Matrix Regulatory Response
Significance Threshold Inspection Findings & Performance Indicators Green Green:
Very Low Safety Significance y
y g
White:
Low to Moderate Safety Significance Yellow Yellow:
Substantial Safety Significance R d R d Hi h S f t Si ifi Red Red:
High Safety Significance NRC Response NRC Response Green Green:
Only Baseline Inspection White:
Requires additional NRC oversight Yellow Yellow:
Requires additional NRC oversight Red Red:
Requires additional NRC oversight
Reactor Oversight Framework Reactor Oversight Framework Protect Public Health and Safety and the Environment Strategic Areas Reactor Safety Radiation Safety Safeguards Safety Cornerstones Initiating Events Mitigating Systems Barrier Integrity Emergency Preparedness Public Radiation Occupational Radiation Physical Protection
Action Matrix Action Matrix Licensee Regulatory Degraded Multiple Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
S f Pl t P f
Summary of Plant Performance Licensee Response 89 Licensee Response 89 Regulatory Response 9
D d d C t
6 Degraded Cornerstone 6
Multiple/Repetitive Deg. Cornerstone 0
Unacceptable 0
Total 104 Total 104
St Lucie Inspection Activities St. Lucie Inspection Activities
- Resident Inspector Baseline
- Regional Baseline Inspections g
- Performance Indicator Inspections
- Three Team Inspections Three Team Inspections
- Problem Identification and Resolution Design Modifications
- Design Modifications
- 95002 Supplemental Inspection
St Lucie Inspection Results St. Lucie Inspection Results
- All Performance Indicators were Green
- All Inspection Findings were Green
- Unit 1 Supplemental Team Inspection determined a 2009 Yellow Finding was determined a 2009 Yellow Finding was properly evaluated by FPL
Annual Assessment Summary
- Operated safely in a manner that preserved public St. Lucie Units 1 and 2
- Operated safely in a manner that preserved public health and safety and protected the environment.
- Unit 1 transitioned from the Degraded Cornerstone Column to the Licensee Response Column.
- Units 1 and 2 finished the year in the Licensee Response Column of the ROP Action Matrix.
- Baseline inspections planned at St. Lucie Units 1 and 2 for the remainder of 2011.
Florida Power and Light Company Florida Power and Light Company Response and Remarks Ri h d L A d Richard L. Anderson Site Vice President, St. Lucie
Public Information Public Information Th NRC l
hi h i
it k
i th
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- At www.nrc.gov, you can:
- Find public meeting dates and transcripts; Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and A
th El t
i R di R
t fi d
- Access the agencys Electronic Reading Room to find NRC publications and documents.
What Do You Think of the ROP???
What Do You Think of the ROP???
The biennial ROP external survey is coming 3rd Quarter 2011, and we want to hear from you!
Email ROPsurvey@nrc.gov to be notified when the ROP survey is available.
For information on ROP stakeholder feedback, please visit our website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/program-evaluations.html#section3
End of Presentation End of Presentation Nuclear Regulatory Commission Nuclear Regulatory Commission Region II Jensen Beach Florida Jensen Beach, Florida A
il 13 2011 April 13, 2011
St Lucie Public Meeting St. Lucie Public Meeting C
t d Q ti Comments and Questions