St. Lucie Nuclear Plant St Annual Assessment Meeting 2010 Reactor Oversight Process April p 13, 2011 Enclosure 2

Meeting Agenda

  • Introduction
  • Review of Reactor Oversight Process
  • National Summary y of Plant Performance
  • Discussion of St. Lucie Plant Performance
  • Questions and Answers Enclosure 2

Our Mission To license T li and d regulate l t our Nations civilian use of nuclear materials in order to protect public health and safety, promote the common defense and security, security and protect the environment.

Enclosure 2

Reactor Oversight Process

  • The NRC program to inspect, measure, and assess the safety performance of commercial nuclear p

power plants and to respond to any decline in performance performance.

Enclosure 2

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results R Results lt Significance Significance Significance gg Threshold Threshold Threshold Action Matrix Regulatory Response Enclosure 2

Significance Threshold Inspection Findings & Performance Indicators Green:

Green Veryy Low Safetyy Significance g

White: Low to Moderate Safety Significance Yellow:

Yellow Substantial Safety Significance R d Red:

Red Hi h Safety High S f t Significance Si ifi NRC Response Green:

Green Only Baseline Inspection White: Requires additional NRC oversight Yellow:

Yellow Requires additional NRC oversight Red:

Red Requires additional NRC oversight Enclosure 2

Reactor Oversight Framework Protect Public Health and Safety and the Environment Strategic Areas Reactor Radiation Safeguards Safety Safety Safety Cornerstones Initiating Mitigating Barrier Emergency Public Occupational Physical Events Systems Integrity Preparedness Radiation Radiation Protection Enclosure 2

Action Matrix Licensee Regulatory Degraded Multiple Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Enclosure 2

S Summary off Plant Pl t Performance P f Licensee Response 89 Regulatory Response 9 D

Degraded d dCCornerstone t 6 Multiple/Repetitive Deg. Cornerstone 0 Unacceptable 0 Total 104 Enclosure 2

St Lucie Inspection Activities St.

  • Resident Inspector Baseline
  • Regional g Baseline Inspections
  • Performance Indicator Inspections
  • Three Team Inspections

- Problem Identification and Resolution

- Design Modifications

- 95002 Supplemental Inspection Enclosure 2

St Lucie Inspection Results St.

  • All Performance Indicators were Green
  • All Inspection Findings were Green
  • Unit 1 Supplemental Team Inspection determined a 2009 Yellow Finding was properly evaluated by FPL Enclosure 2

Annual Assessment Summary St. Lucie Units 1 and 2

  • Operated safely in a manner that preserved public health and safety and protected the environment.
  • Unit 1 transitioned from the Degraded Cornerstone Column to the Licensee Response Column.
  • Units 1 and 2 finished the year in the Licensee Response Column of the ROP Action Matrix.
  • Baseline inspections planned at St. Lucie Units 1 and 2 for the remainder of 2011.

Enclosure 2

Florida Power and Light Company Response and Remarks Ri h d L Richard L. A Anderson d

Site Vice President, St. Lucie Enclosure 2

Public Information

  • Th The NRC places l a hi high h priority i it on kkeeping i th the public and stakeholders informed of its activities.
  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access A th agencys the El Electronic t i R Reading di R Room tto fifind d

NRC publications and documents.

Enclosure 2

What Do You Think of the ROP???

The biennial ROP external survey is coming 3rd Quarter 2011, and we want to hear from you!

Email ROPsurvey@nrc.gov to be notified when the ROP survey is available.

For information on ROP stakeholder feedback, please visit our website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/program-evaluations.html#section3 Enclosure 2

End of Presentation Nuclear Regulatory Commission Region II Jensen Beach Beach, Florida A il 13, April 13 2011

St Lucie Public Meeting St.

C Comments t and dQQuestions ti