ML111050544

From kanterella
Jump to navigation Jump to search
Draft RAIs for MPS3 End of Cycle 13 Refueling Outage SG Tube Inspection Report
ML111050544
Person / Time
Site: Millstone, Peach Bottom  Dominion icon.png
Issue date: 04/15/2011
From: John Hughey
Plant Licensing Branch 1
To: Bartron W, Craft W
Dominion Nuclear Connecticut, Exelon Generation Co
Hughey J, NRR/DORL, 301-415-3204
Shared Package
ml111050581 List:
References
Download: ML111050544 (3)


Text

From:

Hughey, John Sent:

Friday, April 15, 2011 3:31 PM To:

William D Bartron; 'Wanda D Craft' Cc:

Sanders, Carleen

Subject:

Draft RAIs for MPS3 End of Cycle SG Tube Inspection Report Attachments:

DRAFT RAI.docx Afternoon, Attached are Draft RAIs related to the Millstone 3 End of Cycle SG Tube Inspection Report submitted on 10/28/2010. The RAIs are being sent to you to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed.

Please inform me by COB on Friday, 4/22/2011, if DNC desires to have a teleconference regarding the attached draft RAIs. If I dont hear from you by COB on 04/22/2011, then I will issue the RAIs with a response due date of 05/23/2011.

Thanks, John John Hughey Peach Bottom & Millstone Project Manager NRR / Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov