Letter Sequence Withholding Request Acceptance |
---|
TAC:ME5778, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME5779, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
|
MONTHYEARNL-11-0280, License Amendment Request for Steam Generator Water Level High-High Setpoint Change2011-03-0303 March 2011 License Amendment Request for Steam Generator Water Level High-High Setpoint Change Project stage: Request ML1108800402011-03-28028 March 2011 Email Acceptance Review for License Application NL-11-0280 Steam Generator Water Level Hi-Hi Setpoint Change Project stage: Acceptance Review ML11103A0682011-05-18018 May 2011 (Vogtle 1 and 2) - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11097A0062011-05-18018 May 2011 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed NSHC Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Project stage: Request ML11097A0052011-05-19019 May 2011 (VEGP) - Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed NSHC Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Project stage: Other NRC-2011-0111, Vogtle Units 1 and 2 (Vegp) - Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed NSHC Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI2011-05-19019 May 2011 Vogtle Units 1 and 2 (Vegp) - Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed NSHC Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Project stage: Approval ML11158A2562011-06-15015 June 2011 Request for Additional Information, Steam Generator Water Level High-High Sp Change Technical Specification Table 3.3.2.1 TSTF-493-A Project stage: RAI ML11193A0032011-07-18018 July 2011 Request for Additional Information, Steam Generator Water Level High-High Setpoint Change Technical Specification Table 3.3.2.1 Technical Specifications Task Force-493-A Project stage: RAI NL-11-1559, NRC Request for Additional Information for License Amendment Request for Steam Generator Water Level High-High (P-14) Setpoint Change2011-08-12012 August 2011 NRC Request for Additional Information for License Amendment Request for Steam Generator Water Level High-High (P-14) Setpoint Change Project stage: Request ML11252A9012011-09-21021 September 2011 Request for Additional Information, Steam Generator Water Level High-High Setpoint Change Technical Specification Table 3.3.2.1 Technical Specifications Task Force-493-A Project stage: RAI NL-11-2279, Response to NRC Request for Additional Information for License Amendment Request for Steam Generator Water Level High (P-14) Setpoint Change2011-12-0909 December 2011 Response to NRC Request for Additional Information for License Amendment Request for Steam Generator Water Level High (P-14) Setpoint Change Project stage: Response to RAI ML11355A1182012-01-12012 January 2012 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 Project stage: Withholding Request Acceptance ML12033A1262012-02-27027 February 2012 Issuance of Amendments Regarding Steam Generator Water Level High-High Technical Specification, Table 3.3.1-1 and Table 3.3.2-1 Setpoint Changes (TAC ME5778 and ME5779) Project stage: Approval 2011-06-15
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] Category:Proprietary Information Review
MONTHYEARML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events ML23205A0612023-07-27027 July 2023 Response to Request for Withholding Proprietary Information from Public Disclosure for the Vogtle Electric Generating Plant Enclosure 2 to SNC Letter NL-23-0611 for Unit 4, Core Operating Limits Report, Cycle 1, Version 1 ML23024A1102023-02-0303 February 2023 Request for Withholding Informatio from Public Disclosure License Amendment Req. and Ex to Allow Use of Lead Test Assemblies for Accident Tolerant Fuel Encl 2, Response to NRC Audit Questions Related to Hbhe Lta. ML22297A0242022-10-26026 October 2022 Resp to Req for Withholding Proprietary Info from Public Disclosure for Vogtle 3 and 4, ENC 2 and 4 to SNC Letter ND-22-0817, Req for Alternative (VEGP 3&4-ISI1-ALT-17) ML22266A0492022-09-28028 September 2022 Request for Withholding Info from Public Disclosure LAR and Exemptions to Allow Use of LTAs for ATF - Encl. 1, SNC Response to Requests for Additional Info Attachment 2 Proprietary Response to Questions 2-6 EPID L-2022-LLA-0097 ML22251A3482022-09-16016 September 2022 Request for Withholding Info. from Public Disclosure for Slides in the Closed Session of the Pre-Submittal Meeting Regarding the Proposed Online Monitoring License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 EPID L ML22234A0692022-09-15015 September 2022 Request for Withholding Info from Public Disclosure LAR and Exemptions to Allow Use of LTAs for ATF - Enclosure 1, Evaluation of the Proposed Change (Proprietary) EPID L-2022-LLA-0097, LLE-0020, LLE-0021, LLE-0022 ML22255A2032022-09-0202 September 2022 AMS Affidavit for SNC Slides - Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML21270A0212021-10-14014 October 2021 Request for Withholding Information from Public Disclosure WCAP-18647-P, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair of the Reactor Vessel Head Penetrations ML21061A2842021-03-0808 March 2021 Request for Withholding Information from Public Disclosure for the Vogtle Electric Generating Plant, Unit 3 Core Operating Limits Report, Cycle 1, Version 3 ML20364A1932020-12-30030 December 2020 Response to Request for Withholding Proprietary Information from Public Disclosure for the Vogtle Electric Generating Plant, Units 3 and 4 Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds ML19283C9322019-10-16016 October 2019 Request for Withholding Information from Public Disclosure, Vogtle Electric Generating Plant Units 3 and 4, Related to Request for License Amendment Regarding Protection and Safety Monitoring Revision (LAR-19-001) ML18282A0772018-10-11011 October 2018 Request for Withholding Proprietary Information from Public Disclosure for the Vogtle Electric Generating Plant, Units 3 and 4 (LAR 17-043S1) ML18123A2592018-05-0202 May 2018 Request for Withholding of Proprietary Information from Public Disclosure (ND-18-0853) ML18082A4942018-03-27027 March 2018 Request for Withholding Proprietary Information from Public Disclosure - Vogtle Electric Generating Plant, Units 3 and 4 (LAR 17-028S1) ML18073A1672018-03-19019 March 2018 LAR-17-030 - Proprietary Letter ML18073A1662018-03-19019 March 2018 LAR-17-030S1 - Proprietary Letter Supplement 1 ND-18-0300, Westinghouse Electric Co., Application for Withholding Proprietary Information from Public Disclosure2018-02-27027 February 2018 Westinghouse Electric Co., Application for Withholding Proprietary Information from Public Disclosure ML18033A6712018-02-0909 February 2018 Proprietary Letter (LAR-17-043) ML17310A1012017-11-0808 November 2017 Request for Withholding Information from Public Disclosure ML17191A5702017-07-24024 July 2017 Request for Withholding Information from Public Disclosure ML17191A8332017-07-24024 July 2017 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 ML17191A6912017-07-24024 July 2017 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 ML15051A3302015-02-27027 February 2015 Request for Withholding Information from Public Disclosure ML12111A0352012-04-26026 April 2012 Request for Withholding Information from Public Disclosure ML11355A1182012-01-12012 January 2012 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 ML11103A0682011-05-18018 May 2011 (Vogtle 1 and 2) - Request for Withholding Information from Public Disclosure ML1106902472011-05-16016 May 2011 Request for Withholding Information from Public Disclosure (Tac Nos. ME5067 and ME5068) ML0806504772008-08-0606 August 2008 Request for Withholding Information from Public Disclosure (TAC Nos. MD4727 and MD4728) NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 4, Westinghouse Letter, CAW-08-2449, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice2008-06-23023 June 2008 Vogtle, Units 1 and 2 - Enclosure 4, Westinghouse Letter, CAW-08-2449, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 7, Westinghouse Letter, CAW-08-2448, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice2008-06-23023 June 2008 Vogtle, Units 1 and 2 - Enclosure 7, Westinghouse Letter, CAW-08-2448, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice ML0818202162008-06-23023 June 2008 Enclosure 7, Westinghouse Letter, CAW-08-2448, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice ML0818202102008-06-23023 June 2008 Enclosure 4, Westinghouse Letter, CAW-08-2449, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice ML0809503362008-04-0707 April 2008 Request for Withholding Information from Public Disclosure ML0806605122008-03-10010 March 2008 Request for Withholding Information from Public Disclosure, Response to Request for Additional Information Regarding Technical Specifications 3.3.2 and 3.5.4, MD7772 and MD7773 ML0805200492008-02-28028 February 2008 Request for Withholding Information from Public Disclosure ML0728400822007-10-25025 October 2007 Request for Withholding Information from Public Disclosure (TAC Nos. MD6625 and MD6626) ML0728400172007-10-25025 October 2007 Request for Withholding Information Public Disclosure ML0618003642006-06-28028 June 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 ML0527906462005-10-20020 October 2005 Withholding Information from Public Disclosure, Tac Nos. MC5863 and MC5864 2024-01-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 18,2011 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P. O. Box 1295 Bin - 038 Birmingham, AL 35201-1295
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 (VOGTLE 1 AND
- 2) - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. ME5778 AND ME5779)
Dear Mr. Ajluni:
By letter dated March 3, 2011 (NL-11-0280), Southern Nuclear Operating Company, Inc. (SNC, the licensee) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110660458), submitted an affidavit dated February 1,2011, executed by J. A. Gresham, Manager, Regulatory Compliance and Plant licensing, Westinghouse Electric Company, LLC (Westinghouse), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Setpoint Methodology Used for the Steam Generator Water Level-High High Function A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the ADAMS Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
M. Ajluni -2 Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
M. Ajluni -3 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, anyone component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390; it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in "Setpoint Methodology Used for the Steam Generator Water Level-High High Function," (Proprietary), for submittal to the Commission, being transmitted by Southern Nuclear Operating Company letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted for use by Westinghouse for the Vogtle Electric Generating Plant, Units 1 and 2.
This information is part of that which will enable Westinghouse to:
(a) Provide information in support of submittals for setpoint changes.
(b) Provide customer specific calculations.
(c) Provide licensing support for customer submittals.
Further this information has substantial commercial value as follows:
(a) Westinghouse plans to sell the use of similar information to its customers for the purpose of meeting NRC requirements for licensing documentation associated with setpoint changes.
(b) Westinghouse can sell support and defense of the technology to its customer in the licensing process.
(c) The information requested to be withheld reveals the distinguishing aspects of a methodology, which was developed by Westinghouse.
M. Ajluni -4 Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar information and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, Enclosure 6 to the license amendment request dated March 3, 2011, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have Signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
M. Ajluni -5 If you have any questions regarding this matter, I may be reached at 301-415-3936.
Sincerely, Patrick G. Boyle, Project Manager Plant licensing Branch 11-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425 cc: Mr. J. A. Gresham, Manager Regulatory Compliance and Plant licensing Westinghouse Electric Company, LLC 1000 Westinghouse Drive, Suite 428 Cranberry Township, PA 16066 Additional Distribution via listserv
ML11103A068 OFFICE NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlSRXB/BC NRRlLPL2-1/BC NRRlLPL2-1/PM NAME PBoyle MO'Brien GKulesa PBoyle AUlses (SUttle for) (JWiebe for)
DATE 5/4/11 5/4/11 5/6/11 5/17/11 5/18/11