ML110890557

From kanterella
Jump to navigation Jump to search
Response to Request for Additional Information Regarding Mitigation Strategy Assessments and Closure Process for Phases 1, 2 and 3
ML110890557
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/28/2011
From: Eric Freeman
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML110890557 (3)


Text

Enclosures I and 2 contain Security-Related Information and are to be withheld from public disclosure under 10 CFR 2.390. When Enclosures I and 2 are separated, this letter is decontrolled.

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 March 28, 2011 10 CFR 73.55 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

Watts Bar Nuclear Plant (WBN) Unit 2 - Response to Request for Additional Information Regarding Mitigation Strategy Assessments and Closure Process for Phases 1, 2, and 3

References:

1. NRC letter to TVA dated February 18, 2011, "Request for Additional Information Regarding Mitigation Strategy Assessments and Closure Process for Phases 1, 2, and 3 (TAC No. ME4967)" [Accession No. ML1 1030285]
2. TVA letter to NRC dated October 14, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 - Mitigation Strategy Assessments and Closure Process for Phases 1, 2, and 3" This letter responds to the Reference 1 NRC Request for Additional Information pertaining to TVA's October 14, 2010 letter (Reference 2), relative to the commitments to meet the requirements of 10 CFR 50.54 (hh)(2). This letter supersedes the commitments previously provided in Reference 2. to this letter clarifies that the Unit 2 commitments provided in Reference 2 will be functionally the same as WBN Unit 1, will be implemented considering that WBN is a dual unit site, and that physical separation between the two units' response capabilities will be maintained, as required. Enclosure 2 reiterates with clarification the WBN Unit 2 10 CFR 50.54 (hh)(2) commitments.

The enclosures to this letter contain security-related information identified by the designation "Security-Related Information - Withhold Under 10 CFR 2.390." TVA requests this information be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390.

U.S. Nuclear Regulatory Commission Page 2 March 28, 2011 If you have any questions, please contact William Crouch at (423) 365-2004.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of March 2011.

Ed Freeman Unit 2 Engineering Manager

Enclosures:

1. Response to Request for Additional Information Regarding Mitigation Strategies
2. List of Unit 2 10 CFR 50.54 (hh)(2) Commitments

U.S. Nuclear Regulatory Commission Page 3 March 28, 2011 cc (Enclosures):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., N.E., Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381