MONTHYEARML1015201982010-05-31031 May 2010 Emergency License Amendment Request (Lar), Revision to Technical Specification (TS) 2.15, Table 2-5 Footnote (C) for Safety Valve Acoustic Position Indication Project stage: Request LIC-10-0043, Supplement to Emergency License Amendment Request Revision to Technical Specification 2.15, Table 2-5 Note (C) for Safety Valve Acoustic Position Indication2010-06-0101 June 2010 Supplement to Emergency License Amendment Request Revision to Technical Specification 2.15, Table 2-5 Note (C) for Safety Valve Acoustic Position Indication Project stage: Supplement LIC-10-0034, License Amendment Request (LAR) Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c2010-07-12012 July 2010 License Amendment Request (LAR) Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c Project stage: Request LIC-10-0053, License Amendment Request (LAR) 10-04, Proposed Changes to Relocate Operating and Surveillance Requirements for the Power Operated Relief Valve and Safety Valve Position and Tail Pipe Temperature Instrumentation2010-08-16016 August 2010 License Amendment Request (LAR) 10-04, Proposed Changes to Relocate Operating and Surveillance Requirements for the Power Operated Relief Valve and Safety Valve Position and Tail Pipe Temperature Instrumentation Project stage: Request LIC-10-0092, FCS-2010-09-Post Exam Analysis2010-09-17017 September 2010 FCS-2010-09-Post Exam Analysis Project stage: Request ML1025801292010-09-17017 September 2010 Supplemental Information Needed for Acceptance of Requested Licensing Action, Amendment to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: Acceptance Review LIC-10-0085, Supplement to License Amendment Request (LAR) 10-04, Proposed Changes to Relocate Operating and Surveillance Requirements for the Power Operated Relief Valve and Safety Valve Position and Tail Pipe Temperature Instrumentation2010-09-27027 September 2010 Supplement to License Amendment Request (LAR) 10-04, Proposed Changes to Relocate Operating and Surveillance Requirements for the Power Operated Relief Valve and Safety Valve Position and Tail Pipe Temperature Instrumentation Project stage: Supplement ML1034001892010-12-14014 December 2010 Acceptance Following Review of Supplemental Information, License Amendment Request to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: Approval ML1104801392011-02-17017 February 2011 Draft Request for Additional Information, Amendment Request to Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: Draft RAI ML1104801342011-02-17017 February 2011 Email, Draft Request for Additional Information, Amendment Request to Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: Draft RAI ML1106301792011-03-0707 March 2011 Request for Additional Information, Amendment Request to Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: RAI ML1106703782011-03-0808 March 2011 E-mail to Correct Due Date for Response to Request for Additional Information, Amendment to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: RAI LIC-11-0030, Response to Request for Additional Information License Amendment Request to Relocate Operating & Surveillance Requirements for Power Operated Relief Valve, Safety Valve Position, & Tail Pipe Temperature Instrumentation from Technical Spe2011-04-0606 April 2011 Response to Request for Additional Information License Amendment Request to Relocate Operating & Surveillance Requirements for Power Operated Relief Valve, Safety Valve Position, & Tail Pipe Temperature Instrumentation from Technical Specif Project stage: Response to RAI LIC-11-0029, Annual Report for 2010 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.462011-04-0606 April 2011 Annual Report for 2010 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 Project stage: Request ML1113005282011-05-10010 May 2011 Email, Draft Request for Additional Information, Round 2, Request to Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: Draft RAI ML1113005392011-05-10010 May 2011 Draft Request for Additional Information, Round 2, Request to Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: Draft RAI ML1114307242011-05-26026 May 2011 Request for Additional Information, Round 2, Amendment Request to Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: RAI LIC-11-0067, Response to Second NRC Request for Additional Information License Amendment Request to Relocate Operating & Surveillance Requirements for Power-Operated Relief Valve, Safety Valve Position, & Tail Pipe Temperature Instrumentation from Te2011-06-30030 June 2011 Response to Second NRC Request for Additional Information License Amendment Request to Relocate Operating & Surveillance Requirements for Power-Operated Relief Valve, Safety Valve Position, & Tail Pipe Temperature Instrumentation from Techn Project stage: Request ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications Project stage: Approval 2011-02-17
[Table View] |
Text
From:
Wilkins, Lynnea Sent:
Tuesday, March 08, 2011 12:43 PM To:
LIPPY, DONNA L Cc:
HANSHER, BILL R; Burkhardt, Janet; Lent, Susan
Subject:
RE: RAI for Relocating Operating and SR for PORV Acoustic Position Indication from Tech Specs (TAC No. ME4542)
- Donna, That is correct. Mr. Hansher indicated that no teleconference was need for the RAIs, therefore a 30 day response time from March 7, 2011 is acceptable.
My apologies for the error.
Thanks Lynnea Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Cooper Nuclear Station Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377 From: LIPPY, DONNA L [1]
Sent: Tuesday, March 08, 2011 9:56 AM To: Wilkins, Lynnea Cc: HANSHER, BILL R
Subject:
RAI for Relocating Operating and SR for PORV Acoustic Position Indication from Tech Specs (TAC No. ME4542)
- Lynnea, Good morning. OPPD received the letter dated March 7, 2011, providing three RAIs re:
the license amendment request to relocate the operating and surveillance requirements for the PORV, safety valve position and tailpipe temperature instrumentation from the Technical Specifications. It appears in the second paragraph of this letter that the response due date information was mimicked from the March 3rd RAI letter for the relief request (TAC No. ME4541).
It is my understanding that there was a phone call on February 24, 2011, between NRC staff and Mr. Bill Hansher and other OPPD staff members to discuss the RAIs for the relief request (TAC No. ME 4541) and it was agreed during the telecom that the relief request RAI response would be returned within 7 days of receipt of the RAIs.
However, for the RAIs associated with the license amendment request (TAC No.
ME4542), although Mr. Bill Hansher did discuss this with you during a February 24th
phone call, no specific RAI response time was agreed upon, so OPPD was planning to submit within the standard response time of 30 days from receipt of the letter, which is April 5, 2011.
Please confirm that this 30-day response time is acceptable.
Thank you for your assistance in this matter.
Best regards, Donna Lippy Sr. Nuclear Licensing Engineer 402-533-7358