ML110660231

From kanterella
Jump to navigation Jump to search

Correction to Withdrawal of License Amendment Request Concerning the Extension to the Technical Specification Completion Time for Standby Liquid Control
ML110660231
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/07/2011
From: Ellen Brown
Plant Licensing Branch III
To: Pacilio M
Exelon Nuclear
Brown Eva
References
TAC ME3438, TAC ME3437
Download: ML110660231 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 7, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2- CORRECTION TO WITHDRAWAL OF LICENSE AMENDMENT REQUEST CONCERNING THE EXTENSION OF THE TECHNICAL SPECIFICATION COMPLETION TIME FOR STANDBY LIQUID CONTROL (TAC NOS. ME3437 AND ME3438)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission (NRC) dated February 22, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100550582), Exelon Generation Company, LLC submitted a request to amend the Technical Specifications (TSs) to extend the COMPLETION TIME for Condition B of TS 3.1.7 for the Standby Liquid Control System from 8 to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for LaSalle County Station, Units 1 and 2.

In a letter dated February 22,2011 (ADAMS Accession No. ML110540146), Exelon requested that the submittal be withdrawn. As a result, the NRC staff issued a Notice of Withdrawal of Application for Amendment to Facility Operating License in the Federal Register on March 4, 2011 (76 FR 12140).

After issuance it became apparent that the description of the application withdrawn was not correct. A corrected notice to reflect the withdrawn application will be filed with the Office of the Federal Register for publication.

We regret any inconvenience this may have caused. Should you have any questions regarding this matter, please call me at (301) 415-2315.

Sincerely, IRA!

Eva A. Brown, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374 cc: Distribution via Listserv

March 7, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2- CORRECTION TO WITHDRAWAL OF LICENSE AMENDMENT REQUEST CONCERNING THE EXTENSION OF THE TECHNICAL SPECIFICATION COMPLETION TIME FOR STANDBY LIQUID CONTROL (TAC NOS. ME3437 AND ME3438)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission (NRC) dated February 22, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100550582), Exelon Generation Company, LLC submitted a request to amend the Technical Specifications (TSs) to extend the COMPLETION TIME for Condition B of TS 3.1.7 for the Standby Liquid Control System from 8 to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for LaSalle County Station, Units 1 and 2.

In a letter dated February 22,2011 (ADAMS Accession No. ML110540146), Exelon requested that the submittal be withdrawn. As a result, the NRC staff issued a Notice of Withdrawal of Application for Amendment to Facility Operating License in the Federal Register on March 4, 2011 (76 FR 12140).

After issuance it became apparent that the description of the application withdrawn was not correct. A corrected notice to reflect the withdrawn application will be filed with the Office of the Federal Register for publication.

We regret any inconvenience this may have caused. Should you have any questions regarding this matter, please call me at (301) 415-2315.

Sincerely, IRA!

Eva A. Brown, Senior Project Manager Plant licenSing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPLlII-2 Reading RidsNrrDraAadb Resource RidsDorlDprResource RidsAcrsAcnw MailCTR Resource RidsOgcRp Resource RidsNrrPMLaSalie Resource RidsNrrDorILpi'3-2 Resource RidsNrrLASRohrer Resource RidsRgn3MailCenter Resource ADAMS Accession No'.. ML110660231 OFFICE LPLlII-2/PM LPLII 1-21LA LPLlII-2/BC NAME EBrown SRohrer RCarlson DATE 03/7/11 03/7/11 0317/11 OFFICIAL RECORD COpy