Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24127A0892024-05-0202 May 2024 57079-EN57079-1 - Redline Strikethrough e-mail Re Part 21 Interim Notification of Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML22087A0092022-03-0909 March 2022 Ultra Energy, Report Under 10CFR21 of Noncompliance for N7030 Transmitter ML20042E2522020-01-31031 January 2020 EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment ML20029D1612020-01-21021 January 2020 10 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment ML19072A0632019-03-0606 March 2019 10 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16328A3102016-11-18018 November 2016 Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16188A3762016-06-21021 June 2016 Part 21 Interim Evaluation of Deviation - Contractor Failure ML16154A2052016-05-20020 May 2016 Part 21 Interim Evaluation of a Deviation - Contactor Failure ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16125A3602016-04-26026 April 2016 Part 21 - Hydraulic Snubber Seal Material Deviation Interim Report ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML14351A3082014-12-16016 December 2014 10 CFR Part 21 Notification for a Defect in LOCA Analyses for B&W Plants ML14337A0952014-11-25025 November 2014 Part 21 - Defect in LOCA Analysis for B&W Plants ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14226A6412014-08-14014 August 2014 Written Notification to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14101A3422014-04-10010 April 2014 Notification of Part 21 - Potential Defect in General Electric SB1 Switches and Hea Relays ML14085A0122014-03-21021 March 2014 Notification of Part 21 - Sbm Selector Switches Contact Assembly Unplanned Manufacturing Change ML14055A3522014-02-10010 February 2014 Part 21 Report - Instruction Leaflet for Subject Relays May Be Deficient ML14042A2022014-02-0505 February 2014 Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies ML14034A1892014-01-23023 January 2014 Part 21 - Loose Battery Vent Assemblies ML13284A0842013-10-0303 October 2013 Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 ML13277A0102013-09-23023 September 2013 Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) ML13246A0842013-08-23023 August 2013 Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12110A1672012-04-17017 April 2012 Notification of Potential Part 21 Report - Swagelok U Series Bellows Valves Loosening of Stem Tips ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML11336A3692011-12-0101 December 2011 Notification of Potential Part 21 Interim Report on Thermostatic Valve Failure on Palo Verde EDG 2024-05-02
[Table view] Category:Letter
MONTHYEARIR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds 2024-08-26
[Table view] |
Text
Duke T. PRESTON Vice GILLESPIE, Jr.
President Pdkmnergy, Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy.
Seneca, SC 29672 864-873-4478 864-873-4208 fax February 17, 2011 T.Gillespie@duke-energy.com U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Interim Report of the Evaluation of a Deviation Pursuant to 10CFR21.21 (a)(2)
Problem Investigation Process No.: 0-10-08732 Gentlemen:
The purpose of this letter is to provide the Commission with the prescribed interim report, as required by 1 OCFR21.21 (a)(2), of a deviation identified by Duke Energy Carolinas, LLC (Duke Energy). The deviation being evaluated is compliance with the American Welding Society (AWS) standard AWS D1.1 with respect to fabrication activities associated with the Natural Phenomenon Barrier System project. Fluor has procurement responsibility for this contract. DuBose National Energy Services, Inc. is contracted to supply the materials and fabrication services through its contract with Fluor for the project.
The attachment to this letter provides the information requested by 1 OCFR21.21 (d)(4).
In addition, the attachment discusses the relevance of this issue to Duke Energy's Oconee Nuclear Station (ONS). There are no commitments contained in this letter or its attachment.
This issue is currently considered to be of no significance with respect to the health and safety of the public. However, a final analysis is pending the completion of our current investigation which is expected to be completed by the end of April 2011.
Should you have any questions or require additional information, please contact Sandra N. Severance, ONS Regulatory Compliance, at (864) 873-3466.
Sincerely, T. Preston Gillespie, J.,Vice President Oconee Nuclear Station Attachment www. duke-energy.corn
U.S. Nuclear Regulatory Commission February 17, 2011 Page 2 cc: Mr. Victor McCree Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. John Stang Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Mr. Andrew Sabisch NRC Senior Resident Inspector Oconee Nuclear Station Mr. Doug Vickery, Director of Quality DuBose National Energy Services, Inc.
900 Industrial Drive PO Box 499 Clinton, NC 28329 Mr. Ram Prabhakar Fluor Quality Engineering Manager Oconee Project
Attachment Oconee Nuclear Station Interim Report per 1 OCFR21.21 (a)(2)
This notification follows the format of and addresses the considerations contained in 10CFR21.21 (d)(4)(i) - (viii).
(i) Name and address of the individual or individuals informing the Commission.
T. Preston Gillespie, Jr.
Vice President Oconee Nuclear Station (ONS) 7800 Rochester Highway Seneca, SC 29672 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
Facility:
Duke Energy Carolinas, LLC (Duke Energy)
Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 Basic component which fails to comply or contains a defect:
Structural Steel Components for the Natural Phenomenon Barrier System (NPBS), ONS Units 1, 2, and 3 supplied by DuBose National Energy Services, Inc. (DuBose)
Fluor Purchase Order No. A3PB-2-1017-00-Q1 (iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
Manufactured and Supplied by:
DuBose National Energy Services, Inc.
900 Industrial Drive PO Box 499 Clinton, NC 28329
Attachment:
Interim Notification per 10 CFR 21.21 (a)(2)
February 17, 2011 Page 2 (iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
Nature of the defect:
When removing weld run-out tabs beyond the weld joint on fabricated assemblies as requested by Duke Energy, in accordance with the applicable contract documents, weld discontinuities suspected to be porosity were discovered in the trimmed areas. Initially, DuBose removed backing bars from six of the affected welds to assist in characterizing the discontinuities and determining their extent.
Evaluation by Fluor and Duke Energy personnel has concluded that there were process shortcomings in the DuBose welding efforts such that examples of lack of fusion with the weld metal and the weld metal backing bar and lack of penetration into the root of the weld were identified. At that juncture, the decision was made jointly by Fluor and Duke Energy to have DuBose remove all backing bars and weld tabs, inspect the weld for indications and document, and make repairs if required.
Safety hazard which could be created by such defect:
The issue of concern is an inadequate full penetration weld on a structural steel component. The initial fabrication work scope as described was designated for use in the NPBS for the Borated Water Storage Tank Superstructure project.
The design for this structure is robust and contains sufficient design margin such that the design function would still be met with the defective welds.
However, the evaluation continues for fabricated steel that is to be used in the NPBS Girts and steel associated with the West Penetration Room and Cask Decon Room Protection Project. The review cannot be completed until the inspection and the associated repairs have been finalized for this population of the fabricated steel. This population of material was procured for Duke Energy under Fluor purchase order A3PB-2-1015-00-Q1.
(v) The date on which the information of such defect or failure to comply was obtained.
NOTE: This is an interim report. The final determination as to whether this issue constitutes a defect or failure to comply has not been established.
October 11, 2010 - DuBose issued NCR 2833 to document that weld tabs were not removed beyond weld joint.
October 12, 2010 - Weld discontinuities discovered. DuBose marked the NCR as potentially reportable per 10CFR21.
November 1, 2010 - The issue was identified in the ONS corrective action program PIP 0-10-8732.
Attachment:
Interim Notification per 10 CFR 21.21(a)(2)
February 17, 2011 Page 3 November 18, 2010 - DuBose evaluation concluded that the fabrications produced by DuBose do not contain a Defect or result in a Failure to Comply under the requirements of 10CFR21.
November 23, 2010 - Fluor, procuring organization, initiated NCR 10-339 to initiate an Owner Engineering review and identified the issue as potentially reportable under 10CFR21 (i.e., Part 21).
November 23, 2010 - ONS Problem Investigation Process (PIP) 10-8732 was updated to reflect the potential Part 21 nature of this concern.
On-going - Weld inspection, documentation and repair continues.
(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subject to the regulations in this part.
Duke Energy has not installed any of the fabricated material with suspect welds from Fluor purchase orders A3PB-2-1015-00-Q1 and / or A3PB-2-1017-00-Q1.
Duke Energy does not have information from DuBose or otherwise regarding the number of similar components in use at, supplied for, or being supplied for non-Duke Energy facilities.
Duke Energy did not sell any of the fabricated material purchased under Fluor purchase orders A3PB-2-1015-00-Q1 and /or A3PB-2-1017-00-Q1 to other entities.
Duke Energy has no direct knowledge of any other current fabrications from this vendor with potential for the same problem. However, in 2009, welding and back gouging performed by DuBose for use by Duke Energy were performed outside the parameters of pre-qualified welding process and joint design. The inadequate back gouging and welding process allowed slag inclusions to be trapped at the root of the Complete Joint Penetration (CJP). Their process was deemed not acceptable for use on structural steel provided to Duke Energy for the Tornado/High Energy Line Break project. That material was evaluated against the requirements of 10CFR21, and analyses and engineering calculations were required to support the use of the delivered components.
(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
Fluor has returned to DuBose all of the fabricated steel that contained welding backing bars and run-out tabs obtained through both referenced Fluor purchase orders. All backing bars and run-out tabs will be removed, welds inspected, mapped and repaired. Weld maps are being generated for all welding repairs.
These maps are being provided to ONS Major Projects (ONS) and Fluor Aliso
Attachment:
Interim Notification per 10 CFR 21.21(a)(2)
February 17, 2011 Page 4 Viejo (Fluor ANV) engineering to facilitate structural reviews in order to determine structural adequacy.
Corrective actions taken or planned:
The fabricated panels have not been placed into service. Fabricated steel has been returned to DuBose for repair. Fluor has assigned an experienced AWS Certified Welding Inspector to be in the DuBose Shop at all times work is being performed. DuBose has developed a repair procedure (shop traveler) stating how the backing bars and run-out tabs are to be removed; welds mapped, defects excavated; and acceptable weld joint geometry verified prior to initiating welding repairs. All weld defects are documented on the weld map.
Length of time to complete the action:
Because of the length of time required to complete the inspection and repair process, an analysis of the impact of the balance of the welding defects cannot be completed by Duke Energy OMP Engineering / Fluor AN Engineering until April 2011.
DuBose is performing a cause analysis to determine the reasons for the unacceptable condition(s). This analysis will be completed prior to the final technical evaluation of the identified welding defects and included in the final report.
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
None