ML110460027

From kanterella
Jump to navigation Jump to search
Re-Registration for Use of General License Spent Fuel Cask Number 62
ML110460027
Person / Time
Site: Oconee, 07201004  Duke Energy icon.png
Issue date: 02/02/2011
From: Gillespie T
Duke Energy Carolinas
To:
Document Control Desk, NRC/NMSS/SFPO
References
Download: ML110460027 (2)


Text

D~uke T. PRESTON Vice GILLESPIE, Jr.

President FEnergy Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy.

Seneca, SC 29672 864-873-4478 864-873-4208 fax T.Gillespie@duke-energy.com February 2, 2011 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Site, Units 1, 2, and 3 Renewed Operating Licenses: DPR-38, 47, and 55 Docket Numbers: 50-269, 270, and 287 Re-Registration for Use of General License Spent Fuel Cask Number 62 The purpose of this letter is to correct an error in the original Novemlier 5, 2001, General License Spent fuel Cask Number 62, 30-day notification letter. Specifically, the original letter referenced Amendment 2 of the Cask Certificate of Compliance (72-1004) when in actuality; Amendment 3 was in-effect at the time of the Dry Storage Canister (DSC) [cask] loading.

TRANSNUCLEAR, the DSC and storage module vendor, has issued a revision to the fabrication certificate of conformance that demonstrates the canister and the corresponding storage module in which it is stored, conforms to Amendment 3.

As such, in accordance with 10CFR72.212 (b)(1)(ii), Duke Energy Carolinas, LLC (Duke Energy), hereby notifies the Commission of storage of dry fuel under Cask Certificate of Compliance 72-1004, Amendment 3. The date of storage was October 26, 2001, and the cask load number was 62. The cask model is the Standardized NUHOMS 24P and the dry storage canister identification number is ONS-24P-R62. The physical storage location at Oconee Nuclear Station's Independent Spent Fuel Storage Installation is Module E-32.

If there are any questions regarding this registration, please contact Stephen C. Newman, Oconee Regulatory Compliance Engineer, at (864) 873-4388.

Sincerely, T.Preston Gillespie, Jr.

Vice President, Oconee Nuclear Station www. duke-energy.com

U. S. Nuclear Regulatory Commission February 2, 2011 Page 2 cc:

Mr. Michael F. Weber, Director Office of Nuclear Material Safety and Safeguards Mailstop: EBB1 U.S, Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John M. Goshen, Project Manager Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Mailstop: E3 D2M U.S, Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John Stang, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 8 G9A Washington, D. C. 20555 Mr. Cecil A. Fletcher Senior Fuel Facility Inspector USNRC, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Robert P. Carrion Senior Fuel Facility Inspector USNRC, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Luis A. Reyes USNRC - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Andy Sabisch NRC Senior Resident Inspector Oconee Nuclear Station