UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 2, 2011 Mr. Jon A. Franke Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - CRYSTAL RIVER NUCLEAR PLANT
Dear Mr. Franke:
In a telephone conversation on February 1, 2011, Mr. Mark A. Bates, Senior Operations Engineer and Mr. Rick Llewellyn, Operations Training Supervisor made arrangements for the NRC to inspect the licensed operator requalification program at the Crystal River Nuclear Plant.
The inspection is planned for the week of February 21, 2011, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI/ANS-3.5-1998, AAmerican National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.@
In accordance with 10 CFR 55.59(c), the NRC has requested that you make ready upon arrival the material as specified in the enclosure, in order to support the NRC's inspection program needs. Mr. Llewellyn has been advised of this request.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995, (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013.
The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
FPC 2 The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mark A. Bates at (404) 997-4612 (Internet E-mail:
mark.bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: malcolm.widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72
Enclosure:
Materials Request List cc w/encl.: (See page 3)
ML110330533 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE RA RA RA NAME MBates MWidmann DRich DATE 02/02/2011 02/02/2011 02/02/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPL 3 cc w/encl: Joseph W. Donahue R. J. Duncan, II Vice President Vice President Nuclear Oversight Nuclear Operations Carolina Power and Light Company Carolina Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Jack E. Huegel Brian C. McCabe Manager, Nuclear Oversight Manager, Nuclear Regulatory Affairs Crystal River Nuclear Plant Progress Energy Carolinas, Inc. Electronic Mail Distribution Electronic Mail Distribution David T. Conley James W. Holt Associate General Counsel Plant General Manager Legal Dept.
Crystal River Nuclear Plant (NA2C) Progress Energy Service Company, LLC Electronic Mail Distribution Electronic Mail Distribution Stephen J. Cahill Mark Rigsby Engineering Manager Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C) Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Electronic Mail Distribution R. Alexander Glenn Senior Resident Inspector Associate General Counsel U.S. Nuclear Regulatory Commission (MAC - BT15A) Crystal River Nuclear Generating Plant Florida Power Corporation U.S. NRC Electronic Mail Distribution 6745 N Tallahassee Rd Crystal River, FL 34428 Christos Kamilaris Director Attorney General Fleet Support Services Department of Legal Affairs Carolina Power & Light Company The Capitol PL-01 Electronic Mail Distribution Tallahassee, FL 32399-1050 William A. Passetti Ruben D. Almaguer Chief Director Florida Bureau of Radiation Control Division of Emergency Preparedness Department of Health Department of Community Affairs Electronic Mail Distribution Electronic Mail Distribution Daniel R. Westcott Chairman Supervisor Board of County Commissioners Licensing & Regulatory Programs Citrus County Crystal River Nuclear Plant (NA1B) 110 N. Apopka Avenue Electronic Mail Distribution Inverness, FL 36250 Ms. Phyllis Dixon Training Manager Crystal River Nuclear Plant Electronic Mail Distribution
MATERIALS REQUEST LIST The items listed below are being requested per telephone conversation on February 1, 2011, to support the upcoming IP-71111.11 inspection the week of February 21, 2011, at the Crystal River Nuclear Plant. Please have the items listed ready for our review upon arrival on February 21, 2011.
- 1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions.
- 2. Copy of an Organizational Chart for the training department including simulator staff.
- 3. Copy of the weekly examination schedules for the weeks that the 2011, annual operating exams will be administered, including a list of personnel scheduled for testing the week of February 21, 2011.
- 4. Copies of the written examinations that were administered for the last biennial requalification examination (for all weeks), including all re-take examinations.
- 5. Copies of simulator scenarios and JPMs (simulator and in-plant) that were administered for the current annual operating test and that will be administered the week of February 21, 2011. (Hard copies for scenarios administered the week of February 21, 2011, /
electronic files of the rest).
- 6. Self-assessment reports, corrective action reports, and Licensee Event Reports, written since the last requalification inspection.
- 7. A copy of site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security.
- 8. A copy of site procedure(s) governing simulator configuration control, maintenance, and fidelity, including all testing methods used to fulfill ANSI/ANSB3.5-1998, requirements.
- 9. Copy of the program evaluation of the previous biennial requalification cycle.
- 10. Requalification training attendance records for the current biennial training cycle.
- 11. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average.
- 12. All training feedback forms since the last requalification inspection.
- 13. Documentation regarding all remedial training conducted for examination failures since the last requalification inspection.
- 14. Complete list of all individuals that reactivated their licenses since the last requalification inspection.
Enclosure
2
- 15. Records associated with license reactivation, including:
- a. Documentation of time on shift under instruction.
- b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.
- 16. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.
- 17. Medical records for all licensed (active and inactive) operators.
- 18. Simulator maintenance and testing records, including:
- a. List of all open simulator discrepancies.
- b. List of all simulator discrepancies closed within the past 12 months.
- c. List of simulator performance tests.
- d. Simulator performance testing records and associated documentation.
- e. Documentation supporting use of simulator for reactivity manipulations.
Enclosure