UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
January 20, 2011
Mr. R. J. Duncan, II.
Vice President
Carolina Power and Light Company
H.B. Robinson Steam Electric Plant Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT:
H.B. ROBINSON NUCLEAR STATION - REVISION - NOTIFICATION OF
LICENSED OPERATOR INITIAL EXAMINATION - 05000261/2011301
Dear Mr. Duncan:
In a telephone conversation on December 12, 2010, between Mr. Rick Moore, Examination
Development Supervisor and Mr. Richard S. Baldwin, Senior Operations Engineer,
arrangements were made for the administration of licensing examinations at the H.B. Robinson
Nuclear Station. The operating test has been rescheduled to be administered during the week
of February 28, 2011, and March 07, 2011. The written examination that is scheduled to be
administered on March 22, 2011, has not changed. The on-site preparatory week scheduled for
the week of February 7, 2011, has not changed.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by December 15, 2010. Mr. Baldwin provided a written examination outline to your staff
on August 18, 2010. The written examination and the supporting reference materials identified
in Attachment 3 to ES-201, was received on January 18, 2011. The operating test and its
supporting reference materials will be due January 18, 2011.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
2
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget. The public reporting burden for this collection of information is
estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response for examinations prepared by the facility,
including the time for reviewing instructions, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments on any aspect of this
collection of information, including suggestions for reducing the burden, to the Information and
Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk
Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of
Management and Budget, Washington, DC 20503.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Moore has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet
E-mail: richard.baldwin@nrc.gov), or me at (404) 997-4550, (Internet E-mail:
malcolm.widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-261
License Nos.: DPR-23
cc: (See page 3)
2
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while
the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and
senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30
days before the first examination date. If the applications are not received at least 30 days before the
examination date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and
Budget. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />
per response for examinations prepared by the facility, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the
burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail at
infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures
will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is
accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic
Reading Room).
Thank you for your cooperation in this matter. Mr. Moore has been advised of the policies and guidelines
referenced in this letter. If you have any questions regarding the NRC's examination procedures and
guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet E-mail:
richard.baldwin@nrc.gov), or me at (404) 997-4550, (Internet E-mail: malcolm.widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-261
License Nos.: DPR-23
cc: (See page 3)
Distribution
See page 5
X PUBLICLY AVAILABLE
G NON-PUBLICLY AVAILABLE
G SENSITIVE
X NON-SENSITIVE
ADAMS: X Yes
ACCESSION NUMBER:_________________________
X SUNSI REVIEW COMPLETE
OFFICE
RII: DRS
RII: DRS
SIGNATURE
RA/MBATES
FOR
NAME
R.BALDWIN
M.WIDMANN
DATE
1/20/2011
1/20/2011
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
OFFICIAL
RECORD
COPY DOCUMENT
NAME:
G:\\DRSII\\OBII\\SITES\\ROBINSON\\GENERAL
CORRESPONDENCE\\ROBINSON
2011-301
CORPORATE
NOTIFICATION
REVISION
2
(RSB).DOCX
3
cc w/encl:
Eric McCartney
Vice President
H. B. Robinson Steam Electric Plant Unit 2
Carolina Power & Light Company
Electronic Mail Distribution
R. J. Duncan, II
Vice President
Nuclear Operations
Carolina Power & Light Company
Electronic Mail Distribution
Brian C. McCabe
Manager, Nuclear Regulatory Affairs
Progress Energy Carolinas, Inc.
Electronic Mail Distribution
Christos Kamilaris
Director
Fleet Support Services
Carolina Power & Light Company
Electronic Mail Distribution
Curt A. Castell
Supervisor
Licensing/Regulatory Programs
Carolina Power & Light Company
Electronic Mail Distribution
B. C. White
Manager
Support Services - Nuclear
Carolina Power & Light Company
Electronic Mail Distribution
S. D. West
Superintendent Security
H. B. Robinson Steam Electric Plant
Progress Energy
Electronic Mail Distribution
Joseph W. Donahue
Vice President
Nuclear Oversight
Carolina Power and Light Company
Electronic Mail Distribution
David T. Conley
Associate General Counsel
Legal Dept.
Progress Energy Service Company, LLC
Electronic Mail Distribution
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC 20037-1128
Susan E. Jenkins
Director, Division of Waste Management
Bureau of Land and Waste Management
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution
Scott Saunders
Plant General Manager
Carolina Power & Light Company
Electronic Mail Distribution
Robert P. Gruber
Executive Director
Public Staff - NCUC
4326 Mail Service Center
Raleigh, NC 27699-4326
W. Lee Cox, III
Section Chief
Radiation Protection Section
N.C. Department of Environmental
Commerce & Natural Resources
Electronic Mail Distribution
Mark Yeager
Division of Radioactive Waste Mgmt.
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution
Public Service Commission
State of South Carolina
P.O. Box 11649
Columbia, SC 29211
(cc w/encl continued next page)
4
(cc w/encl continued)
Chairman
North Carolina Utilities Commission
Electronic Mail Distribution
Koda Smith
Training Manager
Progress Energy Carolinas, Inc.
Robinson Steam Electric Plant Unit 2
Electronic Mail Distribution
5
Letter to Robert J. Duncan, II. from Malcolm T. Widmann dated January 20, 2011.
SUBJECT:
H.B. ROBINSON NUCLEAR STATION - REVISION - NOTIFICATION OF
LICENSED OPERATOR INITIAL EXAMINATION - 05000261/2011301
Distribution:
C. Evans, RII
OE Mail
RIDSNRRDIRS
PUBLIC
RidsNrrPMRobinson Resource