|
---|
Category:Meeting Notice
MONTHYEARML24322A0042024-11-17017 November 2024 Public Meeting to Receive Comments on the Draft Supplemental Environmental Impact Statement for the License Renewal of Diablo Canyon Units 1 and 2 ML24319A0492024-11-14014 November 2024 Public Meeting to Receive Comments on the Draft Supplemental Environmental Impact Statement for the License Renewal of Diablo Canyon Units 1 and 2 ML24305A1162024-10-31031 October 2024 Public Meeting to Receive Comments on the Draft Supplemental Environmental Impact Statement for the License Renewal of Diablo Canyon Units 1 and 2 ML24305A1182024-10-31031 October 2024 Public Meeting to Receive Comments on the Draft Supplemental Environmental Impact Statement for the License Renewal of Diablo Canyon Units 1 and 2 PMNS20240696, Notice of Meeting Between Petitioners and the U.S. Nuclear Regulatory Commission (NRC) Petition Review Board (PRB) Regarding a Title 10 of the Code of Federal Regulations (10 CFR) 2.206 Petition Submitted on March 4, 2024 (L-2024-CRS-002024-07-16016 July 2024 Notice of Meeting Between Petitioners and the U.S. Nuclear Regulatory Commission (NRC) Petition Review Board (PRB) Regarding a Title 10 of the Code of Federal Regulations (10 CFR) 2.206 Petition Submitted on March 4, 2024 (L-2024-CRS-0000) PMNS20240534, Meeting Between the U.S. Nuclear Regulatory Commission Petition Review Board and the San Luis Obispo Mothers for Peace and Friends of the Earth Regarding a 2.206 Petition Submitted on September 14, 20232024-04-19019 April 2024 Meeting Between the U.S. Nuclear Regulatory Commission Petition Review Board and the San Luis Obispo Mothers for Peace and Friends of the Earth Regarding a 2.206 Petition Submitted on September 14, 2023 PMNS20240210, Closed Presubmittal Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22024-02-15015 February 2024 Closed Presubmittal Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20240064, Environmental Scoping Virtual Public Meeting for the Diablo Canyon License Renewal Application2024-01-30030 January 2024 Environmental Scoping Virtual Public Meeting for the Diablo Canyon License Renewal Application PMNS20240065, Environmental Scoping Public Meeting for the Diablo Canyon License Renewal Application2024-01-22022 January 2024 Environmental Scoping Public Meeting for the Diablo Canyon License Renewal Application PMNS20230992, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22023-09-0606 September 2023 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML23165A2172023-06-14014 June 2023 Pre-submittal Teleconference with Pacific Gas and Electric Company Regarding a Planned License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20230169, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22023-02-22022 February 2023 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20221204, Public Meeting for License Renewal Application - Diablo Canyon Power Plant, Units 1 and 22022-12-0505 December 2022 Public Meeting for License Renewal Application - Diablo Canyon Power Plant, Units 1 and 2 PMNS20220933, Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 22022-09-0707 September 2022 Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20220679, Post-Shutdown Decommissioning Activities Report Public Meeting2022-06-27027 June 2022 Post-Shutdown Decommissioning Activities Report Public Meeting PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220398, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22022-04-13013 April 2022 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML21224A2362021-08-12012 August 2021 Pre-submittal Teleconference with Pacific Gas and Electric Company Regarding a Post-Shutdown Emergency Plan License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML21006A2042021-01-0606 January 2021 Notice of Pre-Application Meeting - PG&E to Discuss Upcoming Submittal of the Application for Renewal of the Diablo Canyon Independent Spent Fuel Storage Installation License ML20328A2102020-11-0606 November 2020 Presubmittal Teleconference with Pacific Gas and Electric Company Regarding a Permanently Defueled Technical Specification License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the NRCs Assessment of Safety Performance at Region IV Plants for 2019 ML18298A0762018-10-26026 October 2018 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Security-Related Information for Diablo Canyon Power Plant, Units 1 and 2 ML17283A0892017-10-10010 October 2017 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Security-Related Information for Diablo Canyon Power Plant, Units 1 and 2 (CAC Nos. MG0255 and MG0256; EPID L-2017-LRM-0019) ML16357A0862016-12-22022 December 2016 Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss the Proposed Change to the Defensive Strategy and 10 CFR 50.54(P) Documentation for Diablo Canyon Power Plant ML16119A5002016-04-29029 April 2016 Notice of Forthcoming Closed Meeting with Pacific Gas & Electric Company to Discuss Proposed Change to Defensive Strategy and 10 CFR 50.54(p) Documentation for Reduction in Minimum Staffing Requirements at Diablo Canyon ML15233A4912015-09-0101 September 2015 August 5, 2015, Public Scoping Meetings for the Environmental Review of the Diablo Canyon Power Plant, Units 1 and 2 License Renewal Application ML15152A2562015-06-0101 June 2015 Meeting Notice with Public Outreach and Pacific Gas & Electric (Pg&E) to Discuss the Current Operating Performance for Diablo Canyon Power Plant for the Period January 1 - December 31, 2014 ML14363A5542014-12-29029 December 2014 Regulatory Conference with Diablo Canyon Nuclear Power Plant ML14057A2002014-02-26026 February 2014 Notice of Forthcoming Meeting with Pacific Gas and Electric Company Regarding the Digital Replacement of the Process Protection System (TAC Nos. ME7522 and ME7523) ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13339A9612013-12-0505 December 2013 Public Meeting Notice ML13312A6462013-11-25025 November 2013 Meeting Notice with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13290A2272013-10-18018 October 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13273A4392013-09-30030 September 2013 Meeting Notice with the Pacific Gas and Electric Company to Discuss the Current Operating Performance for the Diablo Canyon Power Plant ML13263A1922013-09-24024 September 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13282A6202013-09-24024 September 2013 Cancellation Notice of 10/23/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13260A0052013-09-18018 September 2013 10/2/13 Notice of Pre-Application Meeting with Pacific Gas and Electric Company to Discuss Upcoming Structural Weld Overlay Relief Request to Use an Alternative to Disposition Detected Laminar Indications at Diablo Canyon, Unit 2 ML13246A4072013-09-0505 September 2013 9/25/13 Notice of Forthcoming Pre-Application Meeting to Discuss Emergency Core Cooling System Evaluations for License Amendment Request at Diablo Canyon, Units 1 and 2 ML13246A4262013-09-0505 September 2013 Notice of Meeting to Discuss Amendment Request to Adopt Technical Specifications Task Force TSTF-505, Provide Risk-Informed Extended Completion Times, RITSTF Initiative 4B at Diablo Canyon, Units 1 and 2 ML13246A4162013-09-0505 September 2013 9/24/13 - Notice of Pre-Application Meeting to Discuss License Amendment Request for Technical Specification 3.8.1 Diesel Generator Surveillance Requirements at Diablo Canyon, Units 1 and 2 ML13246A2622013-09-0404 September 2013 9/18/13 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13179A0622013-07-0909 July 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13163A0242013-06-12012 June 2013 6/26/13 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13126A0872013-05-0707 May 2013 Notice of Forthcoming 5/29/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13074A1182013-03-15015 March 2013 3/27/13 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13052A5512013-02-21021 February 2013 Preapplication Meeting with Pacific Gas and Electric, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Generating Plants, at Diablo Canyon, Units 1 and 2 ML13028A2022013-02-0404 February 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13030A2462013-01-30030 January 2013 2/12/13 Forthcoming Preapplication Meeting with Pacific Gas and Electric Company to Discuss License Amendment Requests for Degraded Voltage Protection and Control Room Dose Analysis of Record at Diablo Canyon, Units 1 and 2 ML12355A1382012-12-20020 December 2012 1/24/2013 - Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 2024-07-16
[Table view] |
Text
UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 January 10, 2011
SUBJECT:
PUBLIC MEETING TO DISCUSS THE REGION IV LICENSE RENEWAL INSPECTION RESULTS FACIILTY: Diablo Canyon Power Plant DOCKETS: 50-275; 50-323 DATE & TIME: Thursday, January 27, 2011 7:00 p.m. - 9:00 p.m. (PST)
LOCATION: Courtyard by Marriott Grand Ballroom 1605 Calle Joaquin Road San Luis Obispo, CA 93405 PURPOSE: The purpose of this meeting is to present the inspection results from Inspection Report 50-275/2010008; 50-323/2010008 and answer questions from the public related to this inspection and the license renewal process. This inspection report can be obtained in advance of the meeting using the Agencywide Document Access and Management System (ADAMS) at www.nrc.gov/reading-rm/adams/web-based.html, searching for ML103220205.
CATEGORY: This meeting is a Category 3 Meeting. Public participation is actively sought at this type of meeting. The public will be invited to comment or to ask questions at the end of the formal presentation.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting in another format (e.g.,
Braille, large print), please notify the NRCs meeting contact listed below.
Determinations on requests for reasonable accommodations will be made on a case-by-case basis.
PARTICIPANTS: NRC Tony Vegel, Director, Division of Reactor Safety (DRS), NRC Region IV Neil OKeefe, Chief, Engineering Branch 2, NRC Region IV Victor Dricks, Public Affairs Officer, NRC Region IV Michael Peck, Senior Resident Inspector, NRC Region IV Greg Pick, Senior Reactor Inspector, NRC Region IV
Pacific Gas and Electric Co. MEETING CONTACT: Neil OKeefe, Chief, NRC Region IV Engineering Branch 2 817-860-8137 Neil.OKeefe@nrc.gov DISTRIBUTION:
John T. Conway Senior Vice President-Energy &
Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Nuclear Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105 Sierra Club Santa Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Jane Swanson San Luis Obispo Mothers for Peace P.O. Box 3608 San Luis Obispo, CA 93403 James Grant, County Administrative Officer San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102 Jennifer Post, Esq.
Pacific Gas & Electric Co.
77 Beale Street, Room 2496 Mail Code B30A San Francisco, CA 94120 Gary Butner Chief, Radiologic Health Branch California Department of Public Health 3 P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
Pacific Gas and Electric Co. The City Editor of The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA 95814 James R. Becker, Site Vice President Pacific Gas and Electric Company Diablo Canyon Nuclear Plant P.O. Box 56, Mail Station 104/6/601 Avila Beach, CA 93424 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111 Chief, Technological Hazards Branch FEMA Region IX 1111 Broadway, Suite 1200 Oakland, CA 94607-4052 Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
Pacific Gas and Electric Co. Electronic distribution by RIV:
PMNS Resources Meeting Announcement Coordinator Brian.Holian@nrc.gov Director, DLR David.Wrona@nrc.gov Branch Chief, DLR Nathaniel.Ferrer@nrc.gov Project Manager Andrew.Stuyvenberg@nrc.gov Project Manager, DLR Susan.Uttal@nrc.gov Senior Attorney, OGC Elmo.Collins@nrc.gov Regional Administrator Art.Howell@nrc.gov Deputy Regional Administrator Kriss.Kennedy@nrc.gov DRP Director Troy.Pruett@nrc.gov DRP Deputy Director Anton.Vegel@nrc.gov DRS Director Michael.Peck@nrc.gov Senior Resident Inspector Tony.Brown@nrc.gov Resident Inspector Don.Allen@nrc.gov Acting Branch Chief, DRP/B Rick.Deese@nrc.gov Senior Project Engineer, DRP/B Greg.Tutak@nrc.gov Project Engineer, DRP/B Nestor.Makris@nrc.gov Project Engineer, DRP/B Agnes.Chan@nrc.gov DC Administrative Assistant Victor.Dricks@nrc.gov Public Affairs Officer Lara.Uselding@nrc.gov Public Affairs Officer Balwant.Singal@nrc.gov Project Manager Michael.Hay@nrc.gov Branch Chief, DRS/TSB Marisa.Herrera@nrc.gov RITS Coordinator Karla.Fuller@nrc.gov Regional Counsel Jenny.Weil@nrc.gov Congressional Affairs Officer OEMail Resource Sue.Bogle@nrc.gov OEWEB Resource Geoffrey.Miller@nrc.gov OEDO RIV Coordinator mortensengk@INPO.org Bill.Maier@nrc.gov Region IV RSLO Lucy.Owen@nrc.gov Region IV RA Administrative Assistant Anita.Tannenbaum@nrc.gov Region IV DRA Administrative Assistant Dana.Lackey@nrc.gov Region IV DRP Administrative Assistant Verlyn.Jenkins@nrc.gov Region IV DRP Administrative Assistant Tracy.Karl@nrc.gov Region IV DRS Administrative Assistant Deborah.Harrison@nrc.gov Region IV DRS Administrative Assistant Dawn.Yancey@nrc.gov Region IV DRS Administrative Assistant Phil.Longdo@nrc.gov Receptionist R:\REACTORS\DC\DC Mtg Notice 01-27-11 ADAMS ML110110123 SUNSI Rev Compl. ;Yes No ADAMS ; Yes No Reviewer Initials Publicly Avail ; Yes No Sensitive Yes ; No Sens. Type Initials RIV/SRI:DRS/EB2 PAO RSLO C:DRS/EB2 GPick VDricks WMaier NOKeefe OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax