ML110040875

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 09 Figure 9.5-201
ML110040875
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040875 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR PUBLIC UTILITY COMMUNICATIONS SYSTEMS SWITCHED NOTE (1) NETWORK (7) DIRECT ACCESS LINES FTS NETWORK NUCLEAR POWER PLANT TELCO LOCAL CENTRAL OFFICE FTS END OFFICE NOTE (1)

TELEPHONE UTILITY EMERGENCY TELCO OPERATIONS FACILITY LOCAL CENTRAL OFFICE (6) DIRECT ACCESS LINES NRC OPERATIONS CENTER VOICE COMMUNICATION NRCOC SWITCH ERDS NRCOC LAN NOTE (1) INCLUDES MICROWAVE COMMUNICATIONS SYSTEM AND/OR CORPORATE FIBER NETWORK FIGURE 9.5-201 BLN COL 9.5-10 NRC Emergency Telecommunications System Rev 0