ML110040617

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.4.3-201
ML110040617
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040617 (3)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR BLN COL 2.4-2 FIGURE 2.4.3-201 (Sheet 1 of 3)

Probable Maximum Precipitation Isohyets for 21,400 Sq. Mi. Event, Downstream Placement Rev 3

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR BLN COL 2.4-2 FIGURE 2.4.3-201 (Sheet 2 of 3)

Probable Maximum Precipitation Isohyets for 7980 Sq. Mi. Event, Centered at Bulls Gap, TN Rev 3

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR BLN COL 2.4-2 FIGURE 2.4.3-201 (Sheet 3 of 3)

Probable Maximum Precipitation Isohyets for 7980 Sq. Mi. Event, Centered Near Sweetwater, TN Rev 3