ML110040857

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-362
ML110040857
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040857 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR 626500 627000 627500 628000 628500 629000 629500 630000 630500 631000 SWAMP 600 Explanation 60 0

New Units 3 & 4 Generation 600 610 Facility Legend 600

1. CONTAINMENT/SHIELD BUILDING 5 2. TURBINE BUILDING 605 61 1533900 60 3. ANNEX BUILDING 5

0 61 61 5 9 600 605 615 610 4. AUXILIARY BUILDING 60 5. SWS COOLING TOWERS 0 61 0 7. RADWASTE BUILDING 59 5 10. DIESEL GENERATOR BUILDING 600 2 61 0 60 0

13. FIRE WATER/CLEARWELL STORAGE TANK 60 5

25 62 0

14. FIRE WATER STORAGE TANK
15. TRANSFORMER AREA Edge of Pad 61 0

605 20 17. CONDENSATE STORAGE TANK

18. DIESEL GENERATOR OIL STORAGE TANKS 9 19. DEMINERALIZED WATER STORAGE TANK
20. BORIC ACID STORAGE TANK 605 UNIT 3 610
22. TURBINE BUILDING LAYDOWN AREA N1,532,943.23 1533400
25. PASSIVE CONTAINMENT COOLING 62 0 E628,414.56 5 ANCILLARY WATER STORAGE TANK 60 26. DIESEL-DRIVEN FIRE PUMP/ENCLOSURE 4

0 61 21 615

99. T-PAD FOR CRANE 1 19 5 Building Legend 62 Unit 3 61 0 8 61 0

615 1 NEW PRIMARY ACCESS PORTAL 5 19 2 NEW ADMINISTRATION BUILDING Unit 3 & 4 Power Block 60 20 7 62 3 REMOVE EXIST BLDGS.

5 6 10 4 Construction 62 0

Zone 61 5

4 NEW MAINTENENCE BUILDING NEW MATERIAL RECEIVING &

600 5 60 5 SALLY PORT BUILDING 60 5 3

5 620 615 1532900 60 1 18 6 EXISTING SIMULATOR BUILDING 0

625 5 61 61 7 EXISTING UNIT 1 & 2 BUILDINGS 18 620 22 25 99 8 EXISTING SITE TRAINING BLDG 18 22 9 NEW SITE PARKING 15 2 17 10 EXISTING SWITCHYARD 6

610 05 13 Unit 4 UNIT 4 620 11 NEW OUTAGE PARKING N1,532,439.80 615 12 EXISTING COOLING TOWERS 13 5 E629,036.24 13 NEW SECURITY FENCE ASSY.

5 61 14 NEW SWITCHYARD BUILDING 26 5 5 61 14 62 0 15 EXISTING STORAGE AREA 1532400 16 NEW SECURITY ACCESS BLDG P

EL ON 0 17 NEW CIRCULATING PUMPS

.6 D C 03 61 5

61 18 NEW PSO SWITCHYARD FACILITY

.9 5 POND A ' 62 61 61 19 EXISTING SECURITY RANGE FACILITY 62 0 0 EL.600.3' 0 WWRB 5 20 NEW SECURITY TRAINING BUILDING 61 EL.603.7' AP 1000 Power Blocks 13 21 NEW TECH SUPPORT CENTER (WITHIN MAINTENECE BUILDING) 62 62 22 NEW H2 STORAGE BUILDING 14 5 0 23 NEW HAZ. WASTE STORAGE BUILDING 635 24 EXISTING INTAKE PUMPING STATION 0

1531900 64 11 5 64 65 5 5 0 65 66 665 0 5 62 0 0

67 67 80 685 0 Pond Legend 625 625 63 6 69 95 63 6 POND A - YARD DRAINAGE POND 0 70005 7

10 710 715 WWRB - WASTE WATER RETENTION BASIN POND C - CONCENTRATED CHEMICAL TREATMENT POND (LINED) 500 kV 3 63 0 POND D - DESILTING POND SWITCHYARD 630 POND E - ALUM SLUDGE PONDS 730 5 72 720 710 705 700 5 -

69 63 5

71 5 64 0 Notes:

3 5 6 66 6

1. ELEVATIONS SHOWN ARE BASED ON MEAN SEA LEVEL (MSL).

65 45 0

1531400 615 90 16 71 5 2. EXISTING CONDITIONS AND TOPOGRAPHIC CONTOURS 5

63 68 0 5 65 BASED UPON THE SANBORN MAP COMPANY, INC.

70 5

66 68 0 PHOTOGRAMMETRIC SURVEY PERFORMED ON MARCH 26,2006 7 71 5 0 PROJECT NO. 060319.

5 70 0

635 67 0 3. CONTOUR INTERVAL IS 5 FEET.

5 69 67 4. 1000 FOOT GRID AND COORDINATE VALUES ARE BASED 64 UPON AL EAST STATE PLANE COORDINATE SYSTEM NAD 83.

615 0 5

620 625 17 15 660 640 64 5 5 76 665 Finish Contours 670 UNIT 3 1530900 0

76 64 12 5 Cut Slope 630 5 75 5 0 6 63 55 750 0

68 5 0 5 62 64 66 70 74 0 9 630 5

0 74 62 5

5 5 5 68 73 0 0 73 25 73 720 0 66 65 70 7 20 5 7 15 5 61 610 0 0 7 10 69 72 67 7 05 17 0

7 00 0 69 5 71 0

64 5 69 5 0 7 695 68 680 605 67 5 73 675 0 400 feet 670 71 P UNIT 4 EL OND 5 665 1530400 79 0

.6 660 60 14 D 12 655

.2 650

' 0 80 805 645 800 640 FIGURE 2.5-362 BLN COL 2.5-14 Permanent Slopes within One-Quarter Mile of Units 3 and 4 Nuclear Island Rev 1