Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-328
ML110040822
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040822 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR 628500 629000 629500 630000 607 608  !

(

605 600  !

(

8 60 603 612 5 604  !

( Explanation 60 5 611 604 60 8

60 602 61

(

602 Power Block and Adjacent Structures 0

2 614 62 605 607 1533900 @  !

(

B-1079 MW-1210  !

( B-1004 613 Primary deep larger diameter (HQ) borings.

60 604 61 8 624 5  !

( 2 61 B-1067 Indicates primary deep HQ boring 6

( 61 with P-S suspension logging.

( Secondary Power Block Construction Zone B-1017 S-1524 B-1052 Inclined borings 603 (

( 62 0 (arrow defines azimuth) 601 605 S-1522

( 5

( 61 629 B-1017 UDD, UDS Undisturbed sample borings (UDD, UDS)

S-1523 S-15 626 09  !

( 62 8

B-1026 General Site and Non-Safety Facilities 14 B-1065 4 ML-1 B-1096 6 5 60 T-1417!( B-1086 612 627 62 T-1416 S-1507 B-1067 PS B-1067 S-1507 625 B-1074 Primary deep HQ borings 604 B-1094 B-1087

( 61 3

630 0 606 B-1090

( 63 S-15 7 Secondary NQ borings 62 B-1086 09

( B-1083 B-1060 PS 616 MW-1202 5

608 B-1060 Unit #3!(

61 B-1000 B-1088 B-1047 B-1035 B-1062 S-1531 CPT-1304 CPT OW-4 ML-3 S-1531 615 OW-5 8

603  !

(

B-1007 OW-1 CPT-1307 B-1084 B-1040 CPT-1306 T-1404 62 CPT-1309 Seizocone Unit #4 B-1001 B-1021 B-1055 B-1001 CPT-1301 620 Monitoring Well T-1403 -45 MW-1205

( 611 618 4 B-1014 B-1005 B-1025, UDS MW-1203 B-1049 CPT-1305 B-1045 S-153 B-1093 63 604 B-1032 PS B-1032 B-1030 Arrays 7,6,5 0 B-1044 T-1401 Test Pit 613 OW-3 622 605 B-1008 B-1015 B-1002 Arrays 11,12,13 OW-2 B-1041 MW-1205 S-1530 B-1053 615 B-1059 B-1034 PS B-1034 B-1066, UDS OW-2 Pump Test Observation Wells B-1023 62 614 B-1004 617 B-1058 625 611 3

OW-6 B-1039 1533400  !

( 0 635 MW-1201 A 61 B-1003 S- MW-1204 Ar ra y1 Pre-characterization seismic lines 605 B-1029 B-1037 631 CPT-1309 623 15 B-1042 1

( 32 S-1524 S-1505 OW-11 B-1024 S-1505 S-15 Phase 2 Seismic Lines 605 B-1099 B-1009 OW-12 B-1091 643 02 B-1017, UDD, UDS B-1057 B-1092, UDD S-1529 B-1043 Arrays 4,3,2,1 OW-10 OW-7 -43 B-1013 617 B-1046 B-1061 T-1410 S-15 2 B-1016 62 24 Phase 1 Seismic Lines 4 61 B-1018 B-1043A 1

605 60 B-1010 S-1529 ML

( OW-9 MW-1217 617 625 629 632 S-1527 ML-2 B-1082 4 62 S-1527 B-1050 B-1056 624 63 7

64 1 -1 Microgravity Lines B-1022 0 OW-8

( 61 B-1006, UDD B-1064 S-1528 T-1406 ML-4 B-1054 625 B-1033 S-1528 Previous Investigations Arrays 10,9,8 612 B-1095 B-1012 645 ML-6 604 609 61 1

B-1019 Site Director's Complex 1987 1986 FSAR 61 621 612 B-1076 8 646  !

( Borings Core holes 607  !

( B-1085, A S-1526 S-15 B-1038 646 648 B-1020 B-1011 32 631 637 Monitoring Wells 624 635 613

(

609 607 620 626 T-1411 B-1063 A 612 S-1522 S-1523 62 4 625 627 7

60 608 S-1506 639 638 615 B-1031 2 622 624 635 646 S-1506 607 61 619 626 626 See Inset Map

( T-1414 615 628 @

B-1028 B-1081 636 633 644 647 Units 3 and 4 Power Blocks 625 624 B-1027 623 62 640 Nuclear Island 616 62 4 625 8 619 628 7 64

@ T-1409 S-1525 627000 627200 5' Contours 648 MW-1214 61 60 0 6 1532900 6 61 A 1' Contours 607 B-1069 S-613 T CP -13 15 606 608 612 614 T 18 CP -13 32 Existing Plant Infrastructure WT4 616 615 623 T- 19 CP 132 6 B-1068MW-1207 617 B-1048, UDD CP T-1 0 321 ML-7 As drilled locations based on as-built survey points only.

614 611533600 614 629 622 624 B-1097 64 Only exploration points performed are shown.

625 B-1098 1 615 MW-1215 610 Projection: Alabama East State Plane Coordinates NAD83 feet 613 625 CP ML-8 608 623 615 627 B-1052 T-1 Topographic Base: Sanborn Aerial Photography 626 31 T-1415 7

639 CP 642 647ML-9 T-1 5 CP CP 316 615 615 615 61 62 T-1 CP 314 T-1 31 622 T 5 628 9 CP -1313 T-1 61 CP 646 312 7 8 T-61 617 B-1089 S-1532 MW-1213 CP 1311 T-1 31 ML-5 605 0 603 629 62 @ ML-10 645 609 7 627 7

60 B-1051, A 643 5

611 64 616 616 636 606 628 ML-11 647 0 200 ft 601 602 619 630 615 644 6

Inset 609 1533400 615 62

@ 0 25 50 Feet 61 628 638 645 0 60 m for Test Pit "T-1415" 1 621 633 647 617 605 606 608 617 62 9 1 inch equals 50 feet A

BLN COL 2.5-1 FIGURE 2.5-328 BLN COL 2.5-6 Exploration Program of Test Pit Excavations and CPT Rev 0