ML110040821

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-327
ML110040821
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040821 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR 626000 627000 628000 629000 630000 B-1078 0 5 606 @ 602 600 60 60 60 1 615 60 60 603 60 3 599 A

0 60 601 1 B-1079 3 5 60 59 5 60 3 603 611 60 6

609 1 9 600 601 605 60 60 60 604 MW-1212 5 60 596 600 4 2 60 2 MW-1210 60 60 8

01 607 606 602 597 T-14156 608 602 597 605 3

601 60 60 608 4

60 6

596 0 601 599 60 604 @ 602 599 60 60 598 1 605 607 0

601 609 Explanation 1533400 601 60 599 A 607 B-1026 600 0 601 607 606 615 606 599 604 General Site and Non-Safety Facilities 60 60 601 6 0 3 606 605 61 4 601 5 SW 614 61 606 Primary deep HQ 60 60 S- B-1074 2 -1 613 617 borings (75'-150' deep).

59 60 50 2 @ 15 9 6 3 61 8 09 608 Secondary NQ 60 B-1086 B-1086 0

SW 613 618 0 61 B-1099 617 616 borings (35'-50' deep).

60 0 8 60 61 59 6 61 SW S- -1 611 4

15 51 612 609 -1 5 614 62 A 07 59 610 MW-1205 Monitoring Well 8 60 619 622 0

598 60 9 50 60 B-1077 8

2 611 1 616 62 60 615 5 625 595 4 T-1401 Test Pit 60 60 MW-1201 61 612 2 6 6 61 B-1027 61 2 8 616 MW-1216 8

595 1 60 6 12 620 618 60 9 0 MW-1217 Previous Investigations 59 60 61 4 620 MW-1203 B-1096 60 7 3

60 4 MW-1214 616 61 618 Site Director's Complex 1987 B-1031 614 612 5 4 616 60 5 618 60 61 600 615 626 616 3 B-1065 630  !

( Borings 62 SW 8 11 2 8 60 S- 61 60 A

8 6 62 601 59 60 61 61 12 1 15 -1 MW-1202625 597 9 1 61 59 1 6 611 7 2 61 05 51 622 B-1080 1532400 60 60 6 B-1098 9 62 3 5 62 1 610 609 60 4

60 7 61 61 62 624 MW-1204 611 597 6

7 60 61 7 B-1068 4 B-1028 3 SW 60 9 61 7 MW-1211 A -1 9 60 62 8 60 5 59 0 2 60 60 6 4 51 614 608 1986 FSAR 599 7 60 61 627 SW 626 MW-1205 7 620 597 59 59 2 61 MW-1207 625 631 613 Core holes 97 6

8 -1 5

5 60 9 5 61 62 60 62 8 53 599 604 3

62 62 3 33 Monitoring Wells 599 2 @ MW-1213 63 6 6

62 5 4 61 ERCW Pipeline B-1081 7

60 61 (existing) 63 599 625 28 8 598 4

B-1091 Circulating water pipeline corridor 60 8 0

601 60 B-1097 7 5 3 60 63 (source: Westinghouse Drawing No.

64 5

6 629 6 63 6 61 76 61 BFG-0000-X2-029 Revision C, dated 4/12/2006) 60 7 0 8 7 63 627 61 7 7 62 624 64 Power Block footprints 61  %

60 61 611 9 8 MW-1215 7

6 606 @

leach  % 62 645 635 Construction Zone 60 8

7 field

@ @ A 607 60 7 61 659 8 B-1069 649 9

61 60

@ 65 8 7 61 8 Nuclear Island B-1089 1

61 6 64 64 1 614 62 7 66 601 64 5 7 61 @ @  % 67 64 5' Contours 5

608 613 61

@ @ @ 64 5 7 663 2 1 61 1 646 64 1' Contours 59 61 61 CCW Unit 3 Pipeline 617

@ @ @  % 1 6

680 9 4 69 67 69 1531400 01 61 61 3

@ @ @ 8 682 66 Existing Plant Infrastructure 6

A 61

@ @ @ 9 2

0 45 658 6

7 615 61 710 6 64 00 59 613 5

% @ @ @@  % @ plant footprint 711 As drilled locations based on as-built survey points only.

615 617 645 Only exploration points performed are shown.

6 6

4 0

@ 700 70 9 61 617 @

62 63 65 60 637 739 73 683 7 5 0

60 B-1071 617 615 616

@  % @ @ @ 8 8 1 695 Projection: Alabama East State Plane Coordinates NAD83 feet 645 63 64 2 61 616  % @ @ @ 66 66 73 Topographic Base: Sanborn Aerial Photography 8 7 6592 1 691 76 5 62 74 2

4 61 7

3 7

60 60 1 61 64 66 0 618 8

@ @ 646 @

4 62 5 65 771 753 MW-1208 % 62

@ 64 @

73 61 61

@ @ 4 64 644 4 7 628 9 9 64 776 7

5 8 616 A 644 @ 6 2 721 760 64 64 746 600 62 67 66 639 8 60 2 60 61 628  %  %

9

@  % @ 2 68 4 68 5 7 620  % 628 A 65 4

1 697 68 3

717 Unit 3 73

% 69 750 4

64 60 70 7

@ B-1070 0 4 72 60 3

6 Cooling 618

% 3 64 8 64 6

70 2 715 75 757 Tower 64 8 628 72

@ 2 9 9

% @ 641 @ 67 2 726 71 68 60 629 9 716 6

B-1074 MW-1206 66 70 745 752 757 69 749 9

63 5 0 9

%  % @ 73 0

B-1073 65 67 1 60 70 767 8 9 3 64 3 781 0 75 3

62 628 72 7 70 9

629 67 77 72 1 64 62 7 MW-1209 9

7 2 640 79 755 4

5 68 64 69 4 75 5 61  % @

2 645 @

8 66 71 1 77 69 8

5 72 8 B-1075 64 788 68 616 7 5 629 677 64 75 7 668 6 74 77 7 79 609 9 65 0 1 3 61 793 70 1530400 61 7 62 2  % 7 2 69 732 79 796 744 71 8

68 3 658 656 802 6 63 2 7 9 CCW Unit 4 Unit 4 62 784 759 0 61 65 70 6 66 61 7 653 80 69 0 6 5 Cooling Pipeline 780 61 1

Tower 62  % 62 7

644 65 760 794 801 736 2

61 3 1 666 8050 64 634 9 648 687 729 805 772 0 400 ft 62 4 B-1072 64 0 656 0

785 79 665 61 625 34 77 76 743 620 627 6 61 7 0 708 92 625 4 2 761 650 78 62 754 6 0 120 m 2 74 4 62 62 6 8 765 66 4 63 676 733 712 749 623 1

691 9 6 16 4 7 5 740 663 64 62 62 63 68 728 61 658 4 70 6

9 69 758 7 62 4 611 74 8

61 61 63 3 9 8 65 687 678 0

63 7 713 2 72 4 63 659 62 660 6 2 7 56 673 5 70 8

0 74 613 2

63 63 61 BLN COL 2.5-1 FIGURE 2.5-327 BLN COL 2.5-6 Exploration Program, BLN Site D-32 Rev 0