ML110040820

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-326
ML110040820
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040820 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR 628500 629000 629500 630000 605 607 608  !

( P-S Suspension and/or Borehole Goodman N-Packer 600  !

( Gamma 3 1533900 8 Downhole Logging Televiewer Jack Test 61 60 Boring Number Logging Explanation 5 B-1001 X X B-1080 60 612 B-1002 X X MW-1211 Power Block and Adjacent Structures

( B-1003 X 603 611 8

B-1004 X 603 60 602 612  !

( 0 B-1005 X 614 62 B-1005 PS X B-1060 Insitu Test Boring 602 607

( B-1006 X B-1008 Attempted X 601 B-1079 MW-1210  !

( B-1011 X B-1004 613 Primary deep larger diameter (HQ) borings.

604 61 61 8 B-1012 X 4  !

( 2 B-1013 X Indicates primary deep HQ boring 60 6 B-1067

(

! 61 B-1014 X with P-S suspension logging.

B-1015 X

(

Power Block Construction Zone B-1016 X B-1017 Secondary S-1524 B-1023 X 7 B-1026 X 62 B-1052

( B-1032 PS X Inclined borings

( 62 0 B-1032 X (arrow defines azimuth) 605 S-1522 3 B-1034 X X X

( 61 B-1034 PS X 5

1

( B-1017 UDD, UDS Undisturbed sample borings (UDD, UDS)

S-1523 S-15 61 62 B-1036 X 09 9

62 B-1026  !

( B-1037 X ML-1 B-1096 61 4 B-1065 B-1039 X General Site and Non-Safety Facilities T-1416 B-1086 612 1

63 B-1043 X B-1090  !

( S-1507 B-1067 PS S-1507 625 B-1043A X 8 X B-1074 Primary deep HQ borings

(

3 8 62 62 B-1094 B-1087 61 B-1044 X 606 (

! 62 B-1045 X S-15 61 B-1067 B-1083 6 Secondary NQ borings 09 6 B-1046 62 X B-1086

( MW-1202 B-1048 7

5 X X 608 61 B-1060 B-1000 B-1088 Unit

( #3 B-1047 B-1035 B-1062 B-1049 S-1531 X 629 CPT-1304 CPT OW-4 S-1531 ML-3 B-1050 X OW-5 B-1007 B-1060 PS B-1058 X CPT-1307 B-1084 B-1040 B-1001  !

( B-1021 OW-1 B-1055 T-1404 B-1059 X X X CPT-1309 Seizocone 1533400 T-1403 CPT-1301 620 CPT-1306 Unit #4 B-1060 B-1060 PS X

X Monitoring Well 4

( 617

-45 MW-1205 60 B-1002 611 B-1049 B-1045 B-1061 34 X X B-1032 B-1014 B-1025, UDS MW-1203 CPT-1305 S-153 0 Arrays 7,6,5 B-1093 B-1067 6 X X B-1030 B-1044 B-1067 PS X X T-1401 Test Pit 605 B-1008 613 B-1015 Arrays 11,12,13 OW-2 OW-3 622 MW-1205 S- 1530 B-1082 X X B-1041 B-1053 B-1023 615 623 OW-2 Pump Test Observation Wells B-1034 B-1058 B-1066, UDS B-1083 X B-1032 PS B-1004 617 B-1039 611 B-1086 X X OW-6 Arrays 10,9,8 614 !

( 626 635 MW-1201 A 610 B-1003 S- MW-1204 B-1037 630 B-1096 X Ar ra Pre-characterization seismic lines B-1029 y1 CPT-1309 623 15 B-1042 1

( 32 S-1524 S-1505 OW-11 B-1024 S-1505 631 S-15 Phase 2 Seismic Lines Arrays 4,3,2,1 OW-12 B-1099 B-1009 B-1092, UDD B-1091 643 02 B-1017, UDD, UDS B-1057 S-1529 OW-10 OW-7 -43 B-1013 617 B-1046 B-1061 S-15 2 6B-1043A 21 T-1410 24 Phase 1 Seismic Lines 4 61 B-1018 60 B-1010 S-1529 604  !

( OW-9 MW-1217 617 B-1082 624 629 632 ML S-1527 ML-2 623 S-1527 B-1043 B-1050 B-1056 62 5

7 1 64

-1 Microgravity Lines B-1022 63 0

B-1006, UDDOW-8 T-1406

( 61 B-1064 S-1528 B-1054 ML-4 612 B-1012 B-1033 S-1528 B-1095 Previous Investigations 1 ML-6 609 61 B-1019 647 Site Director's Complex 1987 1986 FSAR 61 621 613 B-1076 8 646  !

( Borings Core holes 7 S- B-1038 648 60  !

( B-1085, A S-1526 15 646 B-1011 B-1020 32 631 649 637 635 Monitoring Wells 624 609 607 614 620 T-1411 B-1063 A S-1522 S-1523 62 64 4 635 6 626 627 7

608 60 615 12 B-1031 622 624 S-1506 639 S-1506 607 6 619 626 626 T-1414 See Inset Map B-1081 638

(

1532900 615 @

B-1028 629 636 633 644 647 Units 3 and 4 Power Blocks 625 624 0 623 640 65 B-1027 624 Nuclear Island 615 62 T-1409 625 619 628 7

@ 645 S-1525 MW-1214 610 5' Contours 6

61 A 651 1' Contours 607 607 B-1069 S-613 CP 15 656 611 614 T

CP -13 T 18 32 Existing Plant Infrastructure 625 615 CP -13 616 625 641 T- 19 609 617 626 B-1048, UDD CP 132 653 B-1068MW-1207 T-1 0 6 32 614 61 B-1098 622 624 B-1097 624 1 ML-7 As drilled locations based on as-built survey points only.

Only exploration points performed are shown.

615 MW-1215 613 625 CP 647 ML-8 7 623 615 629 627 B-1052 65 Projection: Alabama East State Plane Coordinates NAD83 feet 626 T-1 627 0 31 63 639 654 Topographic Base: Sanborn Aerial Photography 7

615 61 642 CP CP T-1 CP 316 ML-9 615 615 5 T-1 T-1 659 622 CP 3648 14 31 ML-5 T 5 CP -1313 7 646 CP T-1 312 61 617 630 628 S-1532 T-1 610 MW-1213 CP 31 T-1 6481 B-1089 31 0 647 ML-10 652 660 609 62 7 @ 645 629 643 5 B-1051, A 668 4 611 616 616 628 64 ML-11 60 636 655 616 661 619 629 6

644 0 200 ft 609 615 62

@ 0 25 50 Feet 669 61 638 645 1 621 633 617 647 0 60 m 609 617 629 628 @

1 inch equals 50 feet 658 665 BLN COL 2.5-1 FIGURE 2.5-326 BLN COL 2.5-6 Exploration Program of In Situ Tests Rev 0