ML110040819

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-325
ML110040819
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040819 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR 628500 629000 629500 630000 607 608  !

(

605 600  !

(

8 Explanation 60 603 612 Power Block and Adjacent Structures 60 604  !

(

5 611 604 60 5 8 60 602 61

(

602 0

2 62 B-1004 614 Primary deep larger diameter (HQ) borings.

605 607 1533900 @  !

(

B-1079  !

( B-1067 Indicates primary deep HQ boring MW-1210 613 with P-S suspension logging.

60 604 61 61 8 624 5  !

( 2 Secondary 6 B-1017

( 61

(

Power Block Construction Zone B-1052 S-1524 Inclined borings (arrow defines azimuth) 603  !

(

( 62 0 B-1017 UDD, UDS Undisturbed sample borings (UDD, UDS) 601 605 S-1522

( 5

( 61 629 S-1523 S-15 626 09  !

( 62 8

B-1026 4 B-1065 General Site and Non-Safety Facilities 4

60 ML-1 B-1086 B-1096 61 62 5

612 T-1416 62 7

B-1090  !

( S-1507 S-1507 625 B-1074 Primary deep HQ borings 604 B-1094 B-1067, PS, UDS B-1087

( 61 3

630 0 606 63

(

S-15 61 7 Secondary NQ borings 62 B-1086 09 6 B-1083 5 (

! MW-1202 608 B-1060, PS 61 B-1000 B-1088 Unit

( #3 B-1047 B-1035 B-1062 S-1531 CPT-1304 CPT OW-4 ML-3 OW-5 S-1531 8

B-1007 B-1084 62 603 B-1001 !

( B-1021 CPT-1307 B-1040 CPT-1306 T-1404 CPT-1309 Seizocone B-1055 Unit #4 OW-1 CPT-1301 620 Monitoring Well S-1524 T-1403 MW-1205

( 611 4 B-1002 618 MW-1203 CPT-1305 B-1093 63 B-1025, UDS B-1049 B-1045 B-1034, PS B-1044 Arrays 7,6,5 604 B-1015, UDD B-1032, PS B-1005, PS B-1030 MW-1205 T-1401 Test Pit B-1014 OW-3 605 Arrays 11,12,13 OW-2 B-1059 622 S-153 0 S-1530 613 615 B-1041 B-1053 623 B-1066, UDS OW-2 Pump Test Observation Wells 0 617 B-1008 B-1023 611 B-1004 61 OW-6 B-1058 625 1533400  !

( 635 614 A Ar B-1039 MW-1201 S- MW-1204 ra Pre-characterization seismic lines 605 B-1029 631 y1 B-1003 623 15 B-1042 B-1037 1

( CPT-1309 OW-11 B-1024 32 S-1505 S-S-1505 15 Arrays 4,3,2,1 OW-12 02 Phase 2 Seismic Lines 643 B-1099 605 B-1009 B-1016 B-1017, UDD, UDS B-1057 B-1092, UDD B-1091 S-1529 OW-10 OW-7 617 B-1043, A S-15 2 B-1013 62 B-1046 B-1061 T-1410 24 Phase 1 Seismic Lines 4 61 B-1018 1 605 60 B-1010 S-1529 ML

( OW-9 MW-1217 617 625 629 632 S-1527 ML-2 B-1082 4

62 S-1527 B-1050 B-1036, A, UDD B-1056 624 7 63 64 1 -1 Microgravity Lines B-1022 0 OW-8 T-1406

( 61 B-1006, UDD B-1064 S-1528 625 ML-6 B-1054 612 ML-4 B-1033 S-1528 Previous Investigations Arrays 10,9,8 B-1095 B-1012 645 604 609 61 1

B-1019 Site Director's Complex 1987 1986 FSAR 61 621 612 B-1076 8 646  !

( Borings Core holes 7 S- B-1038 646 648 60  !

( B-1085, A S-1526 B-1020 15 32 631 B-1011 637 Monitoring Wells 624 635 613

(

609 607 620 626 T-1411 B-1063 A 612 S-1522 S-1523 62 4 625 627 7

60 608 B-1031 S-1506 639 638 615 12 622 624 635 646 S-1506 607 6 619 626 626 See Inset Map B-1081 T-1414

(

615 628 @

B-1028 636 633 644 647 Units 3 and 4 Power Blocks 625 624 B-1027 623 62 640 Nuclear Island 616 62 T-1409 4 625 8 619 628 7 64 MW-1214 61 6 S-1525 648 5' Contours 60 61 1532900 6 0 A 1' Contours 607 B-1069 S-613 T CP -13 15 606 608 612 614 T 18 CP -13 32 Existing Plant Infrastructure 616 615 623 T- 19 CP 132 6 B-1068 617 B-1048, UDD CP T-1 0 32 1 ML-7 61 614 MW-1207 64 614 629 622 624 B-1097 B-1052 As drilled locations based on as-built survey points only.

625 B-1098 1 610 615 MW-1215 CP ML-8 Only exploration points performed are shown.

613 625 615 T-1 608 623 626 627 31 7 Projection: Alabama East State Plane Coordinates NAD83 feet CP Topographic Base: Sanborn Aerial Photography 639 647 ML-9 T-1 615 5 642 CP 316 T-1 615 615 61 62 31 5 622 CP 61 628 9 CP 646 CPT- 14 T-1 3 ML-5 7 8 T-1 1 31 CPT-1 133 61 617 S-1532 MW-1213 CP T-1 1 312 605 B-1089 31 0 ML-10 603 629 62 @ 645 609 7 627 B-1051, A 7

60 643 5

611 616 616 64 ML-11 636 647 602 606 619 630 628 0 200 ft 601 615 644 6

609 615 62

@ 0 25 50 Feet 638 645 61 1 621 628 633 0 60 m 617 647 605 606 608 617 629 1 inch equals 50 feet A

BLN COL 2.5-1 FIGURE 2.5-325 BLN COL 2.5-6 Exploration Program of Soil and Rock Borings Rev 0