ML110040818

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-324
ML110040818
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040818 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR 628500 629000 629500 630000 607 608  !

(

605 600  !

(

8 Explanation 60 603 612 Power Block and Adjacent Structures 5 604  !

(

60 5 611 604 60 8

60 602 61

(

602 0

2 B-1004 614 62 Primary deep larger diameter (HQ) borings.

1533900 605 607  !

(

B-1079 MW-1210  !

( B-1067 Indicates primary deep HQ boring 613 with P-S suspension logging.

60 604 61 61 8 624 5  !

( 2 Secondary 6 B-1017

( 61

(

Power Block Construction Zone B-1052 Inclined borings (arrow defines azimuth) 603 C

(

B

( 62 0 B-1017 UDD, UDS Undisturbed sample borings (UDD, UDS) 601 605 S-1522

( 5

( 61 629 S-1523 S-1524 S-15 626 09  !

( 62 8

B-1026 4 B-1065 General Site and Non-Safety Facilities 4

60 ML-1 B-1086 B-1096 61 62 5

612 T-1416 62 7

B-1090  !

( S-1507 S-1507 625 B-1074 Primary deep HQ borings 604 B-1094 B-1067, PS, UDS B-1087

( 61 3

630 0 606  !

( 63 S-15 61 7 Secondary NQ borings 09 6 B-1083 62 B-1086 5  !

(

608 61 MW-1202 B-1060, PS B-1000 B-1088 Unit

( #3 B-1047 B-1035 B-1062 S-1531 CPT-1304 CPT OW-4 ML-3 OW-5 S-1531 8

B-1007 B-1084 62 603 B-1001 !

( B-1021 OW-1 CPT-1307 B-1040 T-1404 CPT-1309 Seizocone B-1055 CPT-1301 620 CPT-1306 Unit #4 Monitoring Well S-1524 T-1403 MW-1205 611

-45

( 618 4 63 B-1093 A'

B-1002 MW-1203 CPT-1305 B-1025, UDS B-1049 S-153 A

B-1045 B-1034, PS B-1044 0 Arrays 7,6,5 604 B-1015, UDD B-1032, PS B-1005, PS B-1030 T-1401 Test Pit B-1014 OW-3 605 Arrays 11,12,13 OW-2 B-1059 622 MW-1205 S-1530 613 615 B-1041 B-1053 623 B-1066, UDS OW-2 Pump Test Observation Wells 0 617 B-1008 B-1023 611 B-1004 61 OW-6 B-1058 625 1533400 614  !

( B-1039 635 Ar MW-1201 S- MW-1204 ra Pre-characterization seismic lines 605 B-1029 631 y1 CPT-1309 B-1003 623 15 B-1042 B-1037 1

( OW-11 B-1024 32 S-1505 S-S-1505 15 Arrays 4,3,2,1 Phase 2 Seismic Lines 605 B-1099 B-1009 OW-12 B-1091 643 02 B-1016 B-1017, UDD, UDS B-1057 B-1092, UDD S-1529 OW-10 OW-7 -43 617 B-1043, A S-15 2 B-1013 62 B-1046 B-1061 T-1410 24 Phase 1 Seismic Lines 4 61 1 B-1036, A, UDD B-1018 605 60 B-1010 S-1529 ML

( OW-9 MW-1217 617 625 629 632 S-1527 ML-2 B-1082 4

62 S-1527 B-1050 B-1036, A, UDD B-1056 624 63 7

64 1 -1 Microgravity Lines B-1022 0 OW-8 T-1406

( 61 B-1006, UDD B-1064 S-1528 625 A A' End Points of Geotechnical ML-6 B-1054 612 ML-4 B-1033 S-1528 Cross Sections Arrays 10,9,8 B-1095 645 604 1 B-1012 Previous Investigations 609 61 B-1019 61 621 1986 FSAR 612 B-1076 8 Site Director's Complex 1987 7 S- B-1038 648 646 60  !

( B-1085, A S-1526 646 B-1020 15 32 631

( Borings Core holes B-1011 624 637 635 B-1054

(

609 607 613 620 626 T-1411 B-1063 M Monitoring Wells 612 S-1522 62 4

S-1523 625 L-627 4

7 60 608 S-1506 639 638 615 B-1031 2 622 624 635 646 S-1506 607 61 619 626 626 See Inset Map B-1081 T-1414

(

615 B' B-1028 628 C'

636 633 644 647 6 Units 3 and 4 Power Blocks 625 L-624 M B-1027 623 4 640 Nuclear Island 616 62 T-1409 62 625 8 619 628 7 64 MW-1214 S-1525 648 5' Contours 6

61 60 61 1532900 6 0 S- 1' Contours 607 B-1069 613 T CP -13 15 606 608 612 614 T 18 CP -13 32 Existing Plant Infrastructure 615 623 T- 19 6

616 B-1068MW-1207 617 B-1048, UDD CP CP 132 T-1 0 32 1 ML-7 614 61 614 629 622 624 B-1097 64 As drilled locations based on as-built survey points only.

625 B-1098 1 MW-1215 ML-8 Only exploration points performed are shown.

610 613 615 625 B-1052 608 623 626 627 CP T-1 Projection: Alabama East State Plane Coordinates NAD83 feet Topographic Base: Sanborn Aerial Photography 647ML-9 31 639 7

642 CP T-1 5 CP 316 615 615 615 61 62 CP T-1 T -13 622 15 61 628 9 CP 314 T

CP -1313 T-1 ML-5 7 8 CP 646312 61 617 T-B-1089 S-1532 MW-1213 CP 1311 T-1 ML-10 605 31 0 603 629 7

609 60 7 62 627 645 B-1051, A 643 5

611 64 616 616 636 ML-11 647 602 606 619 630 628 0 200 ft 601 615 644 6

615 62 0 25 50 Feet 609 645 61 628 638 1 621 633 647 0 60 m 605 606 617 617 9 1 inch equals 50 feet 608 62 BLN COL 2.5-1 FIGURE 2.5-324 BLN COL 2.5-6 Exploration Program, BLN Power Block Construction Zone (with Cross Section Locations)

Rev 0