ML110040806

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-312
ML110040806
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040806 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR 1533200 1509-1 1505-1 Array 8 1522-2 Array 11 1507-1 630 Array 9 626 1527-1 Array 12 1505-2 1523-2 622 1532800 1506-1 618 Array 10 Array 13 1507-2 614 ELEVATION (ft) 1522-1 NORTHING 1505-3 610 1524-1 1531-1 606 1526-1 1527-2 Array 7 Array 1 602 1506-2 1523-1 598 Array 6 1532-1 594 1532400 Array 2 Array 5 1529-1 590 1531-2 1526-2 Array 3 586 1528-1 1530-1 582 Array 4 578 1506-3 1528-2 1529-2 1532000 0 400 ft 1525-1 627700 628100 628500 628900 629300 EASTING BLN COL 2.5-1 BLN COL 2.5-5 BLN COL 2.5-6 FIGURE 2.5-312 Seismic 3D Model: Top of 6,000 fps Vp Layer Rev 0