1 WBN2Public Resource From:
Crouch, William D [wdcrouch@tva.gov]
Sent:
Monday, October 25, 2010 12:56 PM To:
Wiebe, Joel Cc:
Hilmes, Steven A; Clark, Mark Steven
Subject:
FW: TVA Review of NRC Items Identified as not having a path for resolution October 25.doc Attachments:
TVA Review of NRC Items Identified as not having a path for resolution October 25.doc
William D. (Bill) Crouch (423)3652004WBN (256)7777676Cell
From: Clark, Mark Steven Sent: Monday, October 25, 2010 12:46 PM To: Crouch, William D; Hilmes, Steven A
Subject:
TVA Review of NRC Items Identified as not having a path for resolution October 25.doc Bill:
Please forward to NRC for the 1:15 phone call.
- Regards, Steve Steve Clark Bechtel Power Corp.
Control Systems Watts Bar 2 Completion Project Phone: 865.632.6547 Fax: 865.632.2524 e-mail: msclark0@tva.gov
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
174 Mail Envelope Properties (B75BE6D61CDE4A468D264343045CAC4F084992F3)
Subject:
FW: TVA Review of NRC Items Identified as not having a path for resolution October 25.doc Sent Date:
10/25/2010 12:55:49 PM Received Date:
10/25/2010 12:56:30 PM From:
Crouch, William D Created By:
wdcrouch@tva.gov Recipients:
"Hilmes, Steven A" <sahilmes@tva.gov>
Tracking Status: None "Clark, Mark Steven" <msclark0@tva.gov>
Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 609 10/25/2010 12:56:30 PM TVA Review of NRC Items Identified as not having a path for resolution October 25.doc 71744 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
TVA Review of NRC Items Identified as not having a path for resolution October 25, 2010 Note: With the exception of the TBD items, preliminary responses to all items in the 10/29 letter were provided in the last matrix update submitted to the NRC on October 19, 2010.
OI #
Reviewer Action Status 1
54 Singh TVA Action Response is included in letter dated 10/29/10. Design Criteria is WB-DC-40-54 is attached to this letter.
2 55 Singh TVA Action Response is included in letter dated 10/29/10. Design Criteria is WB-DC-40-54 is attached to this letter.
3 117 Garg TVA Action Revised response is included in letter dated 10/29/10 Setpoint Methodology 4
128 Garg TVA Action Response is included in letter dated 10/29/10 Eagle 21, Rack 2 issue.
5 154 Garg TVA Action Response is included in letter dated 10/29/10 Setpoint Methodology 6
156 Garg TVA Action Response is included in letter dated 10/5/10 7
171 Garg TVA Action Response provided in letter dated 10/21/10 8
205 Garg TVA Action Response provided in letter dated 10/5/10 9
274 Garg TVA Action Response provided in letter dated 10/21/10 10 276 Garg TVA Action Response provided in letter dated 10/21/10 11 278 Garg TVA Action Response provided in letter dated 10/21/10 12 280 Garg TVA Action Response provided in letter dated 10/21/10 13 281 Garg TVA Action Response provided in letter dated 10/29/10 14 282 Garg TVA Action Response provided in letter dated 10/21/10 15 283 Darbali TVA Action Response is included in letter dated 10/29/10 16 288 Garg TVA Action Response is included in letter dated 10/29/10 17 289 Singh TVA Action Response provided in letter dated 10/21/10 18 292 Garg TVA Action Response provided in letter dated 10/21/10 19 300 Singh TVA Action Response is included in letter dated 10/29/10 20 301 Singh TVA Action Response is included in letter dated 10/29/10 21 306 Garg TVA Action Response is included in letter dated 10/29/10 22 307 Garg TVA Action Response is included in letter dated 10/29/10 23 308 Garg TVA Action Response is included in letter dated 10/29/10 24 309 Garg TVA Action Response is included in letter dated 10/29/10 25 310 Garg TVA Action Response is included in letter dated 10/29/10 26 311 Garg TVA Action Response is included in letter dated 10/29/10 27 312 Garg TVA Action Response is included in letter dated 10/21/10 28 315 Garg TVA Action Response is included in letter dated 10/21/10 29 316 Singh TVA Action Response is included in letter dated 10/21/10 30 317 Singh TVA Action Response is included in letter dated 10/29/10 31 318 Singh TVA Action Response is included in letter dated 10/29/10 32 319 Singh TVA Action Response is included in letter dated 10/29/10 33 320 Garg TVA Action Closed - Added by TVA and later determined to not be required.
34 321 Garg TVA Action Closed - Added by TVA and later determined to not be required.
35 322 Garg TVA Action Closed - Added by TVA and later determined to not be required.
36 323 Garg TVA Action Response is included in letter dated 10/29/10 37 325 Garg TVA Action Fuel load - Startup plan to transfer loops to Foxboro Spec 200 38 326 Garg TVA Action Response is included in letter dated 10/29/10 39 327 Garg TVA Action Provide non-prop Foxboro I/A drawings (available for submittal now) 40 328 Singh TVA Action Response is included in letter dated 10/29/10 41 329 Singh TVA Action Response is included in letter dated 10/29/10 42 330 Darbali TVA Action TBD 43 331 Singh TVA Action TBD 44 332 Singh TVA Action TBD - Not included in 10/22 list.
OI #
Reviewer Action Status 45 274.b Singh TVA Action Response provided in letter dated 10/21/10 46 302 Marcus TVA Action Response is included in letter dated 10/29/10 47 303 Marcus TVA Action Response is included in letter dated 10/29/10 48 304 Marcus NRC Action Response is included in letter dated 10/29/10 49 305 Marcus NRC Action Response is included in letter dated 10/29/10