ML103140212

From kanterella
Jump to navigation Jump to search
Lr - Metal Enclosed Bus - Thermography Procedure (Sapn 50333175)
ML103140212
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/08/2010
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML103140212 (4)


Text

1 DiabloCanyonNPEm Resource From:

Tan, Miranda [M1TF@pge.com]

Sent:

Monday, November 08, 2010 12:27 PM To:

Pick, Greg Cc:

Grebel, Terence

Subject:

Metal Enclosed Bus - Thermography Procedure (SAPN 50333175)

Attachments:

50333175.pdf Importance:

High Greg, Attached is the updated notification to revise thermograph procedure.

Best, Miranda Tan 805 781 9415

<<50333175.pdf>>

Hearing Identifier:

DiabloCanyon_LicenseRenewal_NonPublic Email Number:

2159 Mail Envelope Properties (D065043718A59C4B99DDA1862BB067DE01BA2431)

Subject:

Metal Enclosed Bus - Thermography Procedure (SAPN 50333175)

Sent Date:

11/8/2010 12:26:39 PM Received Date:

11/8/2010 12:26:44 PM From:

Tan, Miranda Created By:

M1TF@pge.com Recipients:

"Grebel, Terence" <TLG1@pge.com>

Tracking Status: None "Pick, Greg" <Greg.Pick@nrc.gov>

Tracking Status: None Post Office:

exchange12.Utility.pge.com Files Size Date & Time MESSAGE 142 11/8/2010 12:26:44 PM 50333175.pdf 84204 Options Priority:

High Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

DC Notification: 50333175 Type: DN Work Type: EVAL AANS

==

Description:==

LR Commitment Item #17 Order:

Funct. Loc: DC DIABLO CANYON Reported By: M1TF Miranda Tan Rpt By Work Ctr: PL Contact Info: PNS3 Philippe R. Soenen 805/544-6984 Created On: 09 Aug 10 14:01 Planner Group:

Main Wrk Ctr: PL Project Manager - License Renewal PROBLEM DESCRIPTION 08/09/2010 14:01:38 Miranda Tan (M1TF)

The License Renewal Application (LRA) for DCPP Units 1 and 2 was submitted on 11/23/09, DCL-09-079.

This notification tracks implementation of LRA Table A4-1, License Renewal Commitments, Item #17.

Prior to the period of extended operation, DCPP will enhance the Metal Enclosed Bus (MEB) program:

"The existing bus work order inspection activities for inspection and testing of the MEBs will be proceduralized to include specific inspection scope, frequencies and actions to be taken when acceptance criteria are not met."

Procedure to implement:

Implement new procedure, TS1.DC1, License Renewal Electrical Aging Management.

The basis for this commitment can be found in LRA Section B2.1.36 and NUREG-1801, XI.E4, Metal Enclosed Bus, Technical Report.

DCPP Unit 1 and 2 operating licenses expire on 11/2/2024 and 08/26/2025 respectively. This commitment requires that new procedure TS1.DC1 be implemented prior to the period of extended operation.

Event Date 09 Aug 10 Notif Required By 31 Dec 20 Station Sig.: 5 Other Print Date: 08 Nov 10 09:18 PG&E Corporation DIABLO CANYON Page 1 of 2

Notification: 50333175 Type: DN Work Type: EVAL AANS

==

Description:==

LR Commitment Item #17 Order:

DC 08/10/2010 13:18:08 Robyn A. Goff (RAC3) Phone 805/545-3023 The issue/event documented on this notification was reviewed by the Notification Review Team (NRT) and determined to be the indicated significance level per OM7.ID1. If additional information is discovered that would affect the significance level determination, contact a member of the NRT or e-mail DCPP NRT Members.

11/08/2010 09:15:19 Miranda Tan (M1TF)

Procedure MP E-101A, Infrared Thermography Inspections, Section 2.10, states that thermal inspection program is not required for licensing or regulator compliance. LRA Section B2.1.36 required that maintenance of the thermal inspection results. Thermography is a quality record.

Procedure MP E-101A, needs to be revised.

STATUS DETAILS User Status: 20 APPV Approved System Status: NOPR Print Date: 08 Nov 10 09:18 PG&E Corporation DIABLO CANYON Page 2 of 2