ML103140210

From kanterella
Jump to navigation Jump to search
Lr - CCW Heat Exchanger - Test Procedure MA1.ID20 (Sapn 50359698)
ML103140210
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/08/2010
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML103140210 (3)


Text

DiabloCanyonNPEm Resource From: Tan, Miranda [M1TF@pge.com]

Sent: Monday, November 08, 2010 3:46 PM To: Pick, Greg Cc: Grebel, Terence

Subject:

CCW Heat Exchanger - Test Procedure MA1.ID20 (SAPN 50359698)

Attachments: 50359698.pdf Importance: High

Greg, Attached is the notification on revising "no commitment to test" language in procedure MA1.ID20 for testing of CCW heat exchanger.
Best, Miranda Tan 805 781 9415

<<50359698.pdf>>

1

Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2158 Mail Envelope Properties (D065043718A59C4B99DDA1862BB067DE01BA2436)

Subject:

CCW Heat Exchanger - Test Procedure MA1.ID20 (SAPN 50359698)

Sent Date: 11/8/2010 3:46:15 PM Received Date: 11/8/2010 3:46:19 PM From: Tan, Miranda Created By: M1TF@pge.com Recipients:

"Grebel, Terence" <TLG1@pge.com>

Tracking Status: None "Pick, Greg" <Greg.Pick@nrc.gov>

Tracking Status: None Post Office: exchange12.Utility.pge.com Files Size Date & Time MESSAGE 206 11/8/2010 3:46:19 PM 50359698.pdf 81811 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

DC Notification: 50359698 Type: DN Work Type: EVAL AANS

Description:

Revise MA1.ID20 to Align with LRA Order:

Funct. Loc: DC DIABLO CANYON Reported By: M1TF Miranda Tan Rpt By Work Ctr: PL Contact Info: M1TF Miranda Tan Created On: 08 Nov 10 11:28 Planner Group:

Main Wrk Ctr: PL Project Manager - License Renewal PROBLEM DESCRIPTION 11/08/2010 11:28:57 Miranda Tan (M1TF)

The License Renewal Application (LRA) for DCPP Units 1 and 2 was submitted on 11/23/09, DCL-09-079.

Procedure MA1.ID20, Testing/Inspections for Aux Saltwater System NRC Generic Letter 89-13 Compliance, Rev. 2, Section 5.7.7.a, states that "Although there is no commitment to test, CCW heat exchangers are part of GL 89-13: it is considered prudent to monitor heat transfer performance."

LRA Section B2.1.9, Open-Cycle Cooling Water System, states that DCPP performs periodic testing of the CCW heat exchangers prior to each refueling outage to verify their heat transfer capability.

Procedure MA1.ID20, Section 5.7.7.a, needs to be revised.

STATUS DETAILS System Status: OSNO User Status: 20 APPV Approved Event Date 08 Nov 10 Notif Required By 31 Mar 11 Station Sig.:

Print Date: 08 Nov 10 12:34 PG&E Corporation DIABLO CANYON Page 1 of 1