ML103060296

From kanterella
Jump to navigation Jump to search

Acceptance of Clinton, Unit 1 - LAR Revision to TS 3.7.6
ML103060296
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/01/2010
From: Nicholas Difrancesco
Plant Licensing Branch III
To: Matthew Mitchell
Exelon Corp
DiFrancesco N, NRR/DORL/LPL3-2, 415-1115
References
TAC ME4771
Download: ML103060296 (2)


Text

From: DiFrancesco, Nicholas Sent: Monday, November 01, 2010 4:31 PM To: 'Mitchel.Mathews@exeloncorp.com' Cc: Lingam, Siva; Boyle, Patrick; Wohl, Marilyn; DiFrancesco, Nicholas;

'jeff.hansen@exeloncorp.com'

Subject:

Acceptance of Clinton Power Station, Unit No. 1 - LAR Re: Revision to TS LCO 3.7.6, "Main Turbine Bypass System" (TAC ME4771)

Mr. Mathews, By letter dated September 23, 2010, Exelon Generation Company, LLC (the licensee) submitted license amendment request (LAR) for Clinton Power Station (CPS), Unit 1 (ADAMS Accession No. ML102700466). The LAR proposes to modify the CPS Technical Specifications (TS)

Limiting Condition for Operation 3.7.6, "Main Turbine Bypass System (MTBS)," by allowing revision of the reactor operational limits, as specified in the CPS Core Operating Limits Report, to compensate for the inoperability of the MTBS. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and has concluded that it provides technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.

Sincerely, Nicholas DiFrancesco Project Manager Nuclear Regulatory Commission Division of Operating Reactor Licensing nicholas.difrancesco@nrc.gov Tel: (301) 415-1115

Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties (0046140293E11F408991442DB4FE25CA1278DC6CAA)

Subject:

Acceptance of Clinton Power Station, Unit No. 1 - LAR Re: Revision to TS LCO 3.7.6, "Main Turbine Bypass System" (TAC ME4771)

Sent Date: 11/01/2010 4:30:33 PM Received Date: 11/01/2010 4:30:33 PM From: DiFrancesco, Nicholas Created By: Nicholas.DiFrancesco@nrc.gov Recipients:

Mitchel.Mathews@exeloncorp.com ('Mitchel.Mathews@exeloncorp.com')

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Patrick.Boyle@nrc.gov (Boyle, Patrick)

Tracking Status: None Marilyn.Wohl@nrc.gov (Wohl, Marilyn)

Tracking Status: None Nicholas.DiFrancesco@nrc.gov (DiFrancesco, Nicholas)

Tracking Status: None jeff.hansen@exeloncorp.com ('jeff.hansen@exeloncorp.com')

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 21321 11/01/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: