MONTHYEARML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 ML22357A0102022-12-21021 December 2022 NRR E-mail Capture - Final Nphp RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2392022-12-20020 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeons Collected 12/19/2022 ML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22291A3702022-10-18018 October 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2022-LLR-0066) ML22290A2202022-10-17017 October 2022 NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22285A1562022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Atlantic Sturgeon 10/11/2022 (Bottom Trawl) ML22280A1302022-10-0707 October 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report - Sturgeon 10/06/2022 ML22269A4822022-09-26026 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/23/2022 ML22269A0352022-09-23023 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/22/2022 ML22265A1512022-09-22022 September 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Relocate TS Requirements for Reactor Head Vents to TRM ML22286A2062022-09-14014 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/13/2022 ML22244A0422022-09-0101 September 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Revise and Relocate Reactor Coolant System PT Limits and Pops Limits to PTLR ML22244A1192022-09-0101 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 08/31/2022 ML22206A0262022-07-25025 July 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22206A1032022-07-22022 July 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 07/21/2022 ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22188A0762022-07-0707 July 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 07/06/2022 ML22187A1482022-07-0606 July 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection - Sturgeon 07/05/2022 ML22199A2432022-06-29029 June 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 06/28/2022 ML22129A0682022-05-0505 May 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report - 2 Sturgeon 05/04/2022 ML22122A0442022-05-0202 May 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Request for Relief from ASME Code Defect Removal for Service Water Buried Piping (L-2022-LLR-0040) 2024-01-10
[Table view] |
Text
,- I "I Welling, Blake From: Cline, Leonard Sent: Thursday, April 22, 2010 4:27 PM To: Lew, David; Clifford, James Cc: Burritt, Arthur; Conte, Richard; OHara, Timothy; Schroeder, Daniel; Balian, Harry; Welling, Blake; Douglas, Christopher; Gray, Harold; Cahill, Christopher
Subject:
Salem AFW status Unit 2 AFW Missed Surveillance:
PSEG completed a risk analysis that determined delaying the completion of the required pressure drop test an additional seven days was acceptable. This gives PSEG time to determine the best method for performing the pressure drop test on the buried pipe at Unit 2 while at power. The SRAs have engaged PSEG risk analysts and have asked several questions such as whether there are flow restrictors in the AFW discharge lines upstream of the buried pipe, and whether site procedures require them to consider the risk of external events such as fire for the analysis.
PSEG completed limited excavation of Unit 2 piping in the fuel handling building area (similar to Unit 1) and discovered that the pipe coating condition was much better than what they had seen at the same location on Unit 1. EB1 has also observed the condition of the pipe coating and agreed with PSEG's assessment of its condition. PSEG plans to remove a portion of the coating in this area to perform UTs. The UTs will be performed on the pipe at the location that they believe has the most significant coating degradation. PB3/EB1 will monitor progress in this activity and EB1 will review the UT results When available.
Unit 1 AFW Pipe Condition To support past operability of the Unit 1 piping, PSEG completed a technical evaluation that determined that the maximum pressure in the underground AFW piping was 1275 psig. The residents reviewed the evaluation, asked several questions, but currently do not have open concerns. In addition, PB3 has requested that OB review the evaluation to confirm that the most limiting AFW system configuration that PSEG assumed in the analysis was accurate. They will engage Salem operator training on this issue.
PSEG informed us that they will receive a copy of the FEA for the Unit 1 pipe condition from the contractor tomorrow. They expect to be able to provide us a copy of the analysis and an operability evaluation in time for our 1315 status update call tomorrow (4/23). We will also provide this information to Tim Lupold at NRR who will support our review of the analysis. It is important to note that PSEG will provide this information to us before they have completed their internal reviews and before their third party contractor (NPR) completes its review which could take up to seven days to complete.
169
Welling, Blake From: Lew, David Sent: Tuesday, April 06, 2010 5:14 PM To: Burritt, Arthur; Cline, Leonard; Schroeder, Daniel; Balian, Harry Cc: Welling, Blake; Patel, Amar; Clifford, James
Subject:
FW: Quick notes on the Salem 1 AFW piping situation reported by Michael Modes FYI From: Roberts, Darrell .A Sent: Tuesday, April 06, 2010 4:28 PM To: Wilson, Peter Cc: Roberts, Darrell; Lew, David; Clifford, James; Conte, Richard
Subject:
Quick notes on the Salem 1 AFW piping situation reported by Michael Modes Pete, et. al.,
Salem Unit 1: AFW "buried" piping (Class 2 Carbon Steel coated piping, 10" diameter) preliminary guided wave inspection results indicate that buried piping is degraded below min wall. The affected 10" pipe comes out of an Auxiliary Storage Tank and ultimately splits into headers that feed SGs 12 and 14. Licensee is assembling teams, making plans for excavation to conduct UT (the official test method accepted by NRC). Tim O'hara (onsite for ISI inspections) informed the region. These are very preliminary results, so we should not react strongly until we understand better what the licensee's official UT results indicate. Conte is onsite as well monitoring the situation. (Need to confirm the following: Salem Unit 1 head detensioning was expected to start Monday, 4/5, so the plant should be in Refueling Mode (with S/Gs out of service). What is operating status of AFW, or TS requirement for it in this mode? Depending on UT results, this would be a restart issue for Salem.
Note: Per discussion with Michael Modes, guided wave is fine for long straight runs without valves and flanges and bends (e.g., natural gas pipelines). UT is still the methodology of record to meet Code inspection requirements. Industry (EPRI) is in the process of building future mockup test facility in NC to qualify the guided wave technique, but for now guided wave technique is not a reliable indicator for some pipes in nuclear applications.
However, if this is an indication of significant degradation of safety-related buried piping (i.e., below minimum wall thickness requirements for Class 2 AFW system), then it could have implications on the agency's buried piping regulatory footprint going forward, especially given that most - if not all - earlier issues have dealt with non-safety related leaks of buried/underground piping that have less to do with function than they do with radiological impact.
Jim/Dave, you may receive more information through separate channels via the resident inspectors/BC. DRS should have the technical lead for this given our onsite presence already.
DJR 1