MONTHYEARWBL-24-047, Analysis of Capsule V from the Tennessee Valley Authority Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program2024-09-25025 September 2024 Analysis of Capsule V from the Tennessee Valley Authority Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program WBL-24-022, Cycle 5 Steam Generator Tube Inspection Report2024-05-16016 May 2024 Cycle 5 Steam Generator Tube Inspection Report WBL-24-007, Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program2024-03-0505 March 2024 Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR)2023-04-10010 April 2023 Revised Pressure and Temperature Limits Report (PTLR) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu WBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022 Update to Fire Protection Report Figures Redacted WBL-21-057, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-12-16016 December 2021 Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR)2021-12-0909 December 2021 Revised Pressure and Temperature Limits Report (PTLR) CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . ML21244A3452021-09-20020 September 2021 Proposed Alternative IST RR 9 to the Requirements of the ASME OM Code for Test Plan Group 6 Relief Valves CNL-21-055, Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-07-20020 July 2021 Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report CNL-21-040, Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-03-23023 March 2021 Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) ML21060A9132021-03-17017 March 2021 Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Watts Bar ISFSI CNL-21-011, Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-02-25025 February 2021 Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) WBL-21-006, Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-02-11011 February 2021 Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR)2020-12-16016 December 2020 Revised Pressure and Temperature Limits Report (PTLR) CNL-20-074, Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-08-28028 August 2020 Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) WBL-20-004, Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program2020-04-16016 April 2020 Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2019-10-10010 October 2019 License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2019-06-18018 June 2019 Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report L-19-026, Revised Pressure and Temperature Limits Report (PTLR)2019-04-0404 April 2019 Revised Pressure and Temperature Limits Report (PTLR) ML19039A0492019-02-0808 February 2019 Amd 1 to USAR Chapter 9 Auxiliary System NRC Additional Redactions ML19003A5692019-01-16016 January 2019 Review of the Fall 2017 Steam Generator Tube Inspection Report ML18242A0382018-08-30030 August 2018 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report CNL-18-092, Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02)2018-08-0101 August 2018 Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02) CNL-18-007, Seismic Probabilistic Risk Assessment Supplemental Information2018-04-10010 April 2018 Seismic Probabilistic Risk Assessment Supplemental Information ML17356A2692017-12-20020 December 2017 Construction Lessons Learned Report ML17313A1282017-11-0909 November 2017 Revised Pressure and Temperature Limits Report (PTLR) CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations2017-10-13013 October 2017 Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations ML17272A0192017-09-29029 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17263A1162017-09-20020 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17209A5542017-07-28028 July 2017 Cycle 14 Steam Generator Tube Inspection Report CNL-17-050, Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index2017-05-30030 May 2017 Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index ML16215A1042016-08-0202 August 2016 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System Report ML16113A0202016-04-22022 April 2016 Submittal of Title 10, Code of Federal Regulations 50.59 Summary Report CNL-16-038, Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information2016-03-31031 March 2016 Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information CNL-16-034, TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program2016-02-19019 February 2016 TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program CNL-15-263, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory2015-12-29029 December 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory CNL-15-204, Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit2015-09-21021 September 2015 Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results2015-08-20020 August 2015 Submittal of Electromagnetic Interference (EMI) Survey Results CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report2015-07-31031 July 2015 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report CNL-15-131, Individual Plant Examination of External Events (IPEEE) Report, Revision 32015-07-15015 July 2015 Individual Plant Examination of External Events (IPEEE) Report, Revision 3 CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information2015-07-0808 July 2015 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-06-16016 June 2015 Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML15121A6562015-05-0101 May 2015 NRC Region II - CIB1 Watts Bar 2 Ip&S 194 Additional Questions Request List CNL-15-039, Severe Accident Management Alternatives for Reactor Coolant Pump Seals2015-04-10010 April 2015 Severe Accident Management Alternatives for Reactor Coolant Pump Seals 2024-09-25
[Table view] Category:Technical
MONTHYEARWBL-24-047, Analysis of Capsule V from the Tennessee Valley Authority Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program2024-09-25025 September 2024 Analysis of Capsule V from the Tennessee Valley Authority Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program WBL-24-022, Cycle 5 Steam Generator Tube Inspection Report2024-05-16016 May 2024 Cycle 5 Steam Generator Tube Inspection Report CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR)2023-04-10010 April 2023 Revised Pressure and Temperature Limits Report (PTLR) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu WBL-21-057, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-12-16016 December 2021 Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR)2021-12-0909 December 2021 Revised Pressure and Temperature Limits Report (PTLR) CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . CNL-21-055, Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-07-20020 July 2021 Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report CNL-21-040, Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-03-23023 March 2021 Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) CNL-21-011, Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-02-25025 February 2021 Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) WBL-21-006, Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-02-11011 February 2021 Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR)2020-12-16016 December 2020 Revised Pressure and Temperature Limits Report (PTLR) CNL-20-074, Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-08-28028 August 2020 Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) WBL-20-004, Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program2020-04-16016 April 2020 Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2019-10-10010 October 2019 License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2019-06-18018 June 2019 Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report L-19-026, Revised Pressure and Temperature Limits Report (PTLR)2019-04-0404 April 2019 Revised Pressure and Temperature Limits Report (PTLR) ML19039A0492019-02-0808 February 2019 Amd 1 to USAR Chapter 9 Auxiliary System NRC Additional Redactions ML17356A2692017-12-20020 December 2017 Construction Lessons Learned Report CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations2017-10-13013 October 2017 Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations CNL-17-050, Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index2017-05-30030 May 2017 Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index CNL-15-204, Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit2015-09-21021 September 2015 Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report2015-07-31031 July 2015 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-06-16016 June 2015 Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident CNL-15-039, Severe Accident Management Alternatives for Reactor Coolant Pump Seals2015-04-10010 April 2015 Severe Accident Management Alternatives for Reactor Coolant Pump Seals ML15030A5082015-01-30030 January 2015 Tritium Production Program, Updated Plans for Cycle 13 Operation and Updated Evaluation of the Radiological Impacts of Tritium Permeation Into the Reactor Coolant System ML14100A0392014-04-0202 April 2014 Submittal of Pre-Operational Test Instruction CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2014-03-31031 March 2014 Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML13338A6832013-11-26026 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Watts Bar Nuclear Plant, Units 1 and 2, TAC MF0950 and MF1177 ML13196A3762013-07-0909 July 2013 Submittal of Pre-op Test Instructions ML13206A0042013-06-24024 June 2013 Methodology for Evaluating the Potential for Multiple Dam Failures Due to Seismic Events ML13115A0362013-04-11011 April 2013 Engineering Information Record 51-9198783-000, Watts Bar WBN1C11 SG Inspection 180-Day Report ML13148A0142013-04-0404 April 2013 Preoperational Test, 2-PTI-068-13, Rev. 1, Shutdown from Outside the Main Control Room. ML13162A3102013-04-0303 April 2013 2-PTI-002-01, Rev 000, Condensate System. ML13081A0032013-03-13013 March 2013 Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report. Part 2 of 2 ML13081A0022013-03-13013 March 2013 Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report. Part 1 of 2 ML13162A3112013-02-25025 February 2013 2-PTI-026-01, Rev 000, High Pressure Fire Protection. ML13050A3982013-01-31031 January 2013 2-PTI-072-01, Rev 000, Containment Spray Pump Value Logic Test. ML13044A1142013-01-31031 January 2013 Multiple Spurious Operation Evaluation Report R1976-20-01, Dated January 2013, Revision 2 ML13162A3122012-11-16016 November 2012 2-PTI-003A-03, Rev 000, Main Feedwater System Functional Test. ML12298A0592012-10-18018 October 2012 Submittal of 2-PTI-099-05, Rev 0, Overpower Delta-T & Overtemperature Delta-T Turbine Runback. ML13050A3972012-08-20020 August 2012 2-PTI-068-04, Rev 000, Pressurizer Relief Tank. ML12236A1652012-07-19019 July 2012 Application to Revise Watts Bar Nuclear Plant (WBN) Unit 1 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-UFSAR-12-01) ML12215A3382012-02-29029 February 2012 Enclosure 2, WCAP-17309-NP, Rev. 1, Watts Bar, Unit 2 Evaluation for Tube Vibration Induced Fatigue ML12073A3922012-02-29029 February 2012 WNA-VR-00283-WBT-NP, Rev. 7, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects Iv&V Summary Report for the Post Accident Monitoring System. Attachment 2 ML12073A2252012-02-28028 February 2012 Attachment 6, TVA Calculation WBPEVAR8807025, Revision 8, Bypassed and Inoperable Status Indication Logic Input Indications (Letter Item 4) ML12073A3592012-02-28028 February 2012 WBT-D-3769 Np, Common Q Pams Secure Development and Operational Environment Sser 23 Appendix Hh Action Item 98 Requests for Additional Information 2024-09-25
[Table view] |
Text
,/
- TENNESSEE VALLEY AUTHORITY PROJECT: WBN UNIT: 2 EXAMINATION METHOD EXAMINATION
SUMMARY
AND RESOLUTION SHEET CYCLE 00 REPORT NUMBER:
COMPONENT ill: SIF-B-T107-04 SYSTEM: SIS lSI DWG NO: ISI-2063-W-14 f MT 0 PT 0 UT ~ VT D CONFIGURATION: CATEGOR_
PROCEDURE:N-UT- 8 'f REV 0 TC: ,vfA P TO FLG B-J E:=~LlSE.-.r~ EXAMINER: EXAMINER: % EXAMINER: "fA.
LEVEL: :rr= LEVEL: LEVEL: LEVEL:
Total coverage calculated to be approximately SO. 0 %
R PJ.lAS£t> RRRAt 2.0 MJ.J"2.. 8 £L£mE/V'r Pflo8£ "",JI A ANII: .....@
_ . * * * * * * * * * * . -~/.1.-
_-_ _- DATE: Z-9 '<:6 LEVEL: DATE: "). 1.L(. Page: --.l...- OF ~
ACCESS: FORMS DATABASE R-10/04/01
PHASED ARRAY ULTRASONIC TJENNESSEE VALLJEY CAUBRAnON REPORT NUMBER:
AUTHORITY DATA SHEET ~ _ fO1b PROJECT: \III!N UNIT 2. CYCLE: 0 CALIBRATION DATE: 07 07/ ()
PROC.: /II- or- 9 REV: () TC: /ilIA CALIBRATION BLOCK NO.: we - 2.0 TEMP:7,Z."F INSTR. MFG: G E.J: T DUE DATE: 12./1' I() SIMULATOR BLOCK NO: 79 0 'f I '
MODEL/TYPE: PJlASofl. 5M&TE ID: E1.f137C1 THERMOMTERSIN:£3 053 DUEDATE:0811~/o1 SOFTWARE REVISION: I. () COUPLANT ULTf!.AG-EL ']1;:" BATCH: 062J,$ t:
EXAM TYPE: SHEAR LONGO EXAM: lSI 0 PSI~ LIMITATIONS: YI8l NO CABLE TYPE: ID LENGTH: ~IVI BLOCK TYPE: re.tHPAs SIN: 7 e'f oCfI {, NOMINAL ANGLE ACTUAL ANGLE REFLECTOR LOW: 3S HIGH: SOLOW: 35 HIGH: 80 SCAN DIRECTION NOTCH DEPTH SDH. DEPTH REF. SENS/AMPL ANGLE I METAL PATH EXAM SENS.
AXIAL 11.0 / ~o'" IPJ.O CIRCUMFERENTAIL SCAN PATTERN ANGLE START: 3S ANGLE STOP: eo ANGLE STEP: I. 0 MATERIAL THICKNESS: * .3 5 0 SIGNAL 1 SIGNAL 2 GAIN SET AMP 80 COMMENTS: WELDSIITEMS EXAMINED:
EXAMINER:
/II/A LEVEL:
TENNESSEE VALLEY MANUAL ULTRASONIC REPORT NUMBER AUTHORITY PIPING EXAMINATION DATA SHEET g-Po6%
ROJECT: WBN UNIT/CYCLE 2/00 EXAMINATION DATE 07/ IJ 7/a'j SYSTEM: SIS START TIME: 12:zg END TIME: 1'23.2 WELD I.D.: SIF-B-TlO7-04 EXAM SURFACE OlD ~OD CONFIG.: P TO FLG FLOW
> MATERIAL TYPE: OCS SURFACE TEMP.: 72*1-l)(l SS PYRONO.
OCSCL OCCSS 1!3705J PROCEDURE:N-UT- If 8 REV: _0_ TC: lilA EXAMINATION ANGLE 35- 80 DEG. 3S-]D DEG.
Wo
REFERENCE:
WELl;> C.ENTEgLllvc AXIAL SCAN SENSITIVITY / e. () dB JI/A dB Lo
REFERENCE:
,be CIRC. SCAN SENSITIVITY /tI/A dB /8. " dB L (in) FROM REF. AT MAX AMP MAX EXAM INO NOM. NRI INDICATION INFORMATION:
AMP NO.
NO. L1 LMax L2 WMAX MPMAX DMAX %DAC ANG. TYPE, DAMPING, ETC.
3-14 3 3%D J&i
't iV/A 0 ND SeA,.) 'I 'P v E TD F l. AN6-£"
S 35/70 ~ L.,,,,, ,'T£ t> S ££ I!GI'IA~
{, 3oV7D ~ L,I"'\ ,TEl;::. S £ E IZE,"A~u 0
0 REMARKS/LIMITATIONS SOJC.L£ S ti>e~ r; JlAI'I,,.;A7fo,J (No SeA~4) ~ U! 7 t) FcAN(j..E h v E ..,. 0 Co isF, I.. lJ CZATI D,..J S cA,.JS 5&' L , '" t7 & ~ 0 AJ P*Pi: Sib/: TO wEt..b !
M J11A.17AIJJr~ S 7" - ).o/', I~ ~DLL bv2,tJt;. ExAmiNATIoN EXAMINER. I A
/.}) .~ A
':r1lSt>>J P,L ,.uMtfl.EVEL: ::::n::::- ANII: ...Q A;f- /Z-Ji ! d 9
, XAMINER: V IJ IA LEVEL: #/ A DATE:
REVIEWED BY~ /)
~ .../J." LEVEL:~ DATE: .., .{q,(£{
PAGE 3 OF S
,r\
ACCESS. FORMS DATABASE 10118/01
REPORT NO:
.WALL THICKNESS TVA
UNIT:
WatJ 2-PROFILE SHEET WELD NO:
SYSTEM:
W.ld S IF Til'] - 0'(
SZS (2..-(J06Lf{,
R.cord Thlckn*** Me.surements As Indlclted, Including Weld Width. C.nt.rlln.
Edg**To-Edge At O* 1-- 2.5" -I.. 2.5" ...1 Position O* ter 180* 270* rn 111* rn
~l)
IJ] .1..7 .1P,ff. Sid. R.Af4G£ J rn ,;'7
-Sid.
[!J .21 rn rn o1~
ii/A Flow. -
CROWN HEIGHT: O.o,2S DIAMETER: /. SO CRQWN WIDTH: ."IS0 WELD LENGTH: '.25
?f?E ~Lote/ .......... /2.4/f/Gc 00 tf.
.-L- ~ ..
o*
LEVEL:
DATE:
'IV" 19668 (NP-S.89)
- xz:
fJ7/ o 7/ fJ 1 7,+.$0,..
Po &. tSFAJ$Icy REVIEWED LEYEL:~
8Y~J) ,~ ~ L?*.
DATE; '2
.. 4d.
lJ
-[4:.-c!{
ANII:
DATE' PAGE s;.J, I{
f;:t..
OF fZ-C I dt q
.s
TVA REPORT NO.:
PROJECT:__~W~B~N~ __ SYSTEM: S IS Office of Nuclear Power UNIT: :L WELD NO: SJ~ TIt)7-1-/ __LPDh Lf '
PIPE FLOW t>a F"LAftJ(j..E
'i5 80 t ~~/
--~~S-~
" £";<14 h\ Ii'JATIt:>I\J PEIl.FtJfl.;neb,..o Q.IJ,4t.tJ:'l!b Sec;r~1Z. scA,.J A/liG-LES tJF 3S"°To So" Ax AlUb lS°,.(:) Jo tl e'l<
BY: :rRSo~ Po L ,S EtJS/( LEVEL: DATE: Dl/o'l/o 1 PAGE 5 OF
~ . ~ o~ l.-lf' Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WELD NUMBER SIF-B-T107-04 Required examination Volume in sq. in.
Item 1 (width x height) sq. in.
Item 2 Number of scan directions directions Item 3 Total Scan volume in sq. in. sq. in.
Item 4 Total length of weld inches Total required exam volume in cubic Item 5 inches cu. in.
Exam volume acheived (sq. in.) in Item 6 direction 1 X length of weld achieved cu. In.
Exam volume acheived (sq. in.) in Item 7 direction 2 X length of weld achieved cu. In.
Exam volume acheived (sq. in.) in Item 8 direction 3 X length of weld achieved cu. In.
Exam volume acheived (sq. in.) in Item 9 direction 4 X length of weld achieved cu. In.
Determined the acheived exam volume Item 10 add 6,7,8 & 9 cu. In.
Exam volume percentage item 10/item 5 %
Item 11 x 100 Comments SnJ6-tt: StblH> f)ue TO Pt..AI'IGS