ML102910696
| ML102910696 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/14/2009 |
| From: | Orf T Plant Licensing Branch II |
| To: | Lake L NRC/RGN-II/DRS/EB3 |
| References | |
| FOIA/PA-2010-0116 | |
| Download: ML102910696 (2) | |
Text
Sengupta, Abhijit From:
Sent:
To:
Subject:
Attachments:
Orf, Tracy Monday, December 14, 2009 7:32 AM Lake, Louis FW: CR3 Root Cause Information 2009 Dec 11 - Root Cause Update for NRC.pptx
)
From: McCabe, Brian [1]
Sent: Monday, December 14, 2009 7:29 AM To: Sykes, Marvin; Franke, Mark; Wert, Leonard; Kennedy, Kriss; Saba, Farideh; Orf, Tracy
Subject:
CR3 Root Cause Information As we discussed last Thursday, the root cause investigative work (not the report) is scheduled to be completed by 12/28.
Brian
Root Cause Analysis - PII Metrics as of Dec 11th 2009 Open Failure Modes (yet to be supported or refuted) qP 80 70 60 50 40 30 20 I,
L I
) External Events
($) Operational Events I Inadequate Containment utting I) Inadequate Concrete - Tendon teractions
- ) Chemically or Environmentally iduced Aging
[) Shrinkage, Creep and ettlement m (4) Inadequate Use of Concrete Materials 1
0'110 0 Q Z r!-&
C w
0 a (4) Inadequate Concrete cqonstruction 0 (1) Inadequate Concrete Design due to High Local Stress 0
0 z
z 4 (b 000 0
z z
z z
z I1 m
0z 0
z
(&
0>
0 0
0 Z
z Z
Z Z
A z z Czz C)
C)
C C.)
0000004b V-4)V-4)-4)
T)4)4)
N Progress Energy 1